Aclara SGM1430-B User manual

SGM1430-B Smart Meter
Polyphase User Manual - SMETS2
Y20995-TUM
Revision A
www.Aclara.com


SGM1430-B Smart Meter Polyphase User Manual – SMETS2 i
Proprietary Notice
This document contains information that is private to Aclara Technologies LLC, an Ohio limited
liability company, and/or that is private to Aclara Meters LLC, a Delaware limited liability
company (individually or collectively “Aclara”). This information may not be published,
reproduced, or otherwise disseminated without the express written authorization of Aclara.
Any software or firmware described in this document is furnished under a license and may be
used or copied only in accordance with the terms of such license.
Disclaimer
The information in this document is subject to change without notice and should not be construed
as a commitment by Aclara. Aclara assumes no responsibility for any errors that may appear in
this document.
No responsibility is assumed for the use or reliability of software on equipment that is not
supplied by Aclara.
MeterMate, SGM1100, SGM1300, and SGM3000 are trademarks of Aclara Meters LLC. All
third-party trademarks are the property of their respective owners. Aclara may have patents or
pending patent applications covering subject matter in this document. The furnishing of this
document does not provide any license whatsoever to any of these patents.
Aclara
Confidential and Proprietary
Copyright 2020. All Rights Reserved.

ii SGM1430-B Smart Meter Polyphase User Manual – SMETS2

SGM1430-B Smart Meter Polyphase User Manual – SMETS2 iii
C
OMPLIANCE
WITH
S
TANDARDS
AND
E
UROPEAN
D
IRECTIVES
Meters are marked with the European CE mark in accordance with the Marking
Directive 93/68/EEC to indicate compliance with the requirements of the EMC
directive and Measuring Instruments Directive 2004/24/EC.
Safety requirements for meters are addressed in specific metering standards outlined
below.
BS EN 50470-1:2006
General Requirements
BS EN 50470-3:2006
Active Energy Class A or Class B
IEC 62052-11:2003
General Requirements
IEC 62053-21:2003
Active Energy Class 1 or Class 2
IEC 62053-22:2003
Active Energy Class 1 or Class 2
IEC 62053-23:2003
Reactive Class 2 or Class 3
BS 7856:2013
BS Meter Dimension
IEC 60529
Ingress Protection
IEC 62056-21:2002
Hardware Description for local meter data exchange
The SGM1430-B smart meter complies with the general requirements of EN 50470
Parts 1 and Parts 3 and also complies with Class M2 Mechanical environment.

iv SGM1430-B Smart Meter Polyphase User Manual – SMETS2
W
ARNINGS
AND
C
AUTIONS
Important
The information contained herein is general and not intended for specific
application purposes. It does not relieve the user of responsibility to use sound
practices in application, installation, operation, and maintenance of the equipment
purchased. Aclara reserves the right to make changes in the specifications shown
herein or to make improvements at any time without notice or obligations. Should
a conflict arise between the general information contained in this publication and
the contents of drawing or supplementary material or both, the latter shall take
precedence.
The equipment in this manual must be operated only from the power source
specified.
The successful operation of this equipment depends upon proper handling,
installation, and operation. Neglecting fundamental installation requirements may
lead to personal injury as well as damage to electrical equipment or other property.
All electronic components within the meter are susceptible to damage from
electrostatic discharge. To prevent damage when handling this product, use
approved static control procedures.
Hazardous voltages can cause shock, burns, or death. To prevent exposure to
hazardous voltages, disconnect and lock out all power sources before servicing
and removing components.
If the meter is used in a manner not specified in this manual, the protection
provided by the equipment may be impaired.
Unauthorized changes or modifications made to the unit could void the warranty.
Qualified Personnel
For the purpose of this manual, a qualified person is one who is familiar with the
installation, configuration, or operation of the equipment and the hazards
involved. In addition, the person is:
• trained and authorized to de-energize, clear, ground, and tag circuits and
equipment in accordance with established safety procedures;
• trained in the proper care and use of protective equipment such as rubber
gloves, hard hat, safety glasses or face shields, flash clothing, etc. in
accordance with established safety practices; and

SGM1430-B Smart Meter Polyphase User Manual – SMETS2 v
• trained in rendering first aid.
Any work on or near energized meters, meter sockets, or other metering
equipment presents the danger of electrical shock. All work on these products
must be performed by qualified industrial electricians and metering specialists
only. All work must be done in accordance with local utility safety practices and
procedures.

vi SGM1430-B Smart Meter Polyphase User Manual – SMETS2

SGM1430-B Smart Meter Polyphase User Manual – SMETS2 vii
Chapter 1: Introduction 1
Aclara Support . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
Chapter 2: Product Description 3
General Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
Features . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
Models . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
Terminal Arrangements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
Chapter 3: Physical Components 9
Enclosure and Covers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
Cover Seals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
Display . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10
Descriptor, Numerical, and Unit Indicators. . . . . . . . . . . . . . . . . . . . . .11
Active Elements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .13
Current Status . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .14
Reverse Run . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .14
HAN Signal Status . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .15
Contactors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .15
Load Control Relay . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .16
Phase . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .16
Battery . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .16
Warning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .17
Display Modes. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .17
Display Configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .17
Auto-Scroll Duration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .17
Manual Operation Timeout . . . . . . . . . . . . . . . . . . . . . . . . . . . .18
Backlight Timeout . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .18
Contrast Adjustment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .18
Display Item Configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . .18
OBIS Code . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .18
Interface Class . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .18
Number of Digits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .19
Number of Decimal Places . . . . . . . . . . . . . . . . . . . . . . . . . . . .19
Additional Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .19
Push Buttons . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .19
Push Button A. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .19
Push Button B - Sealable . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .20
Push Buttons A and B . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .20
Configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .20
Supply Reconnection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .20
Audible Indicators . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .20
Optical Port . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .20
LED Indicator . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .21
Nameplate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .21
CSP Communications Hub Interface . . . . . . . . . . . . . . . . . . . . . . . . . .22
Contactors and Relay Terminals . . . . . . . . . . . . . . . . . . . . . . . . . . . .22
Status Indicator . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .22
Terminal Screws. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .22
Lithium Battery . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .22
Meter Security . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .22
Magnetic Detection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .23
Table of Contents

viii SGM1430-B Smart Meter Polyphase User Manual – SMETS2
Table of Contents
Memory. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .23
Firmware . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .23
Firmware Variants . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .23
Firmware Components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .24
Firmware Specifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .25
Metrology Firmware and Data . . . . . . . . . . . . . . . . . . . . . . . . . . .25
Firmware Release Notes Process . . . . . . . . . . . . . . . . . . . . . . . . . .26
Firmware Upgrade. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .26
Firmware Security. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .26
Power Outages . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .27
Chapter 4: Communications 29
Communication Interfaces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .29
ICHIS Interface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .29
20-Pin Connector . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .30
Optional AC Mains Connector . . . . . . . . . . . . . . . . . . . . . . . . . . .30
Home Area Network (HAN) . . . . . . . . . . . . . . . . . . . . . . . . . . . . .31
Manufacturing Client . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .31
Advanced Metering Infrastructure (AMI) . . . . . . . . . . . . . . . . . . . . . . .31
Chapter 5: Metrology Functionality 33
Multipurpose Energy Metering . . . . . . . . . . . . . . . . . . . . . . . . . . . .33
Instantaneous Measurements . . . . . . . . . . . . . . . . . . . . . . . . . . . .33
Frequency of Supply . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .34
Cumulative Registers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .34
Power Quality Measurements . . . . . . . . . . . . . . . . . . . . . . . . . . . . .34
Over Frequency and Under Frequency. . . . . . . . . . . . . . . . . . . . . . . .34
Over Current . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .35
Power Factor Threshold . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .35
Voltage Quality Measurements . . . . . . . . . . . . . . . . . . . . . . . . . . . .35
Average RMS Voltage for Phases 1, 2, and 3 . . . . . . . . . . . . . . . . . . . . .35
Over Voltage Threshold . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .35
Under Voltage Threshold . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .36
RMS Extreme Over Voltage . . . . . . . . . . . . . . . . . . . . . . . . . . . . .36
RMS extreme Under Voltage . . . . . . . . . . . . . . . . . . . . . . . . . . . .36
RMS Voltage Sag. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .36
RMS Voltage Swell . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .36
Supply Outage Reporting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .37
Profiles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .37
Load Profile. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .37
Interval Times . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .37
Interval Time Changes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .38
Data Storage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .38
Load Profile. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .38
Voltage Profile . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .38
Memory Overwrite. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .38
Power Outages . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .38
Time-of-Use (TOU) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .39
Block Tariffs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .39
Maximum Demand . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .39
Billing Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .39
Daily Billing Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .39
Monthly Billing Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .40
Asynchronous Billing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .41

SGM1430-B Smart Meter Polyphase User Manual – SMETS2 ix
Table of Contents
Chapter 6: Advanced Features 43
Supply Disconnect and Reconnect . . . . . . . . . . . . . . . . . . . . . . . . . . .43
Supply Contactor Visual Status . . . . . . . . . . . . . . . . . . . . . . . . . . .43
Scheduled Disconnection/Reconnection . . . . . . . . . . . . . . . . . . . . . . .43
Automatic Disconnection/Reconnection . . . . . . . . . . . . . . . . . . . . . . .43
Load Limiting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .44
Under/Over Frequency . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .44
Sag/Swell (Short Term) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .44
Under/Over Voltage (Long Term) . . . . . . . . . . . . . . . . . . . . . . . . .44
Over Current . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .44
Power Factor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .44
Tamper Detection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .45
Arming and Disarming . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .45
Auxiliary Load Relay . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .45
Real-time Clock . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .45
Event Logging and Errors/Alarms . . . . . . . . . . . . . . . . . . . . . . . . . . .45
Event Logs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .46
Prepayment Solution. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .46
Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .46
Account Model . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .46
Credit Object Types . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .47
Charge Object Types . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .47
Payment Modes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .48
Credit Mode . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .48
Credits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .48
Charges . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .48
Prepayment Mode . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .49
Credits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .49
Charges . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .50
Changing Payment Modes . . . . . . . . . . . . . . . . . . . . . . . . . . . . .51
Changing to Credit Mode . . . . . . . . . . . . . . . . . . . . . . . . . . . . .52
Changing to Prepayment Mode . . . . . . . . . . . . . . . . . . . . . . . . . .52
Non-Disablement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .54
Display Indication . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .54
Non-Disablement Calendar . . . . . . . . . . . . . . . . . . . . . . . . . . . .54
Days . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .54
Weeks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .55
Seasons . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .55
Special Days - Holidays . . . . . . . . . . . . . . . . . . . . . . . . . . . . .55
Disconnector Control Mode. . . . . . . . . . . . . . . . . . . . . . . . . . . . .55
Top-Ups . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .55
UTRN (Token) Overview. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .55
Prepayment Token Decimal (PPTD) . . . . . . . . . . . . . . . . . . . . . . .56
Prepayment Top-up Token (PTUT) . . . . . . . . . . . . . . . . . . . . . . . .56
Class 5 Token . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .56
Consumer UTRN Token — 20-Digit Decimal . . . . . . . . . . . . . . . . . . . .57
Check Digit — 20th Digit . . . . . . . . . . . . . . . . . . . . . . . . . . . .57
UTRN Token – MAC . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .57
Prepayment Key . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .58
UTRN Counter Cache . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .58
UTRN - Manual Entry . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .58
UTRN Entry Responses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .60
UTRN Entry Accepted . . . . . . . . . . . . . . . . . . . . . . . . . . . . .60
UTRN Entry Lockout . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .60

xSGM1430-B Smart Meter Polyphase User Manual – SMETS2
Table of Contents
Maximum Meter Balance . . . . . . . . . . . . . . . . . . . . . . . . . . . . .60
Maximum Credit Threshold . . . . . . . . . . . . . . . . . . . . . . . . . . . .61
Debt to Clear . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .61
Order of Recovery of Debts . . . . . . . . . . . . . . . . . . . . . . . . . . . .61
Prepayment Events and Alerts . . . . . . . . . . . . . . . . . . . . . . . . . . .61
Prepayment Logs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .63
Prepayment Menu – Display. . . . . . . . . . . . . . . . . . . . . . . . . . . . .64
Mandatory Prepayment Menu Items . . . . . . . . . . . . . . . . . . . . . . . .65
Prepayment Menu – Item Structure and Access . . . . . . . . . . . . . . . . . . .66
Chapter 7: Installation 69
Terminal Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .69
Terminal Block . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .69
Terminal Arrangements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .69
SGM1431-B Terminals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .69
SGM1432-B Terminals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .69
SGM1433-B Terminals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .69
Installation Procedures. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .69
UK Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .69
Installation Screwdrivers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .71
Backup Power Supply . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .72
Mounting Template . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .72
Connect SGM1430-B to the CSP Communications Hub . . . . . . . . . . . . . . . . . .72
Notifications to Installers and Utilities. . . . . . . . . . . . . . . . . . . . . . . . .75
Chapter 8: Tests Procedures and Maintenance 79
Pulse Output LED . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .79
Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .79
Test Display . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .79
Test Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .80
Field Accuracy Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .80
Watt-hour Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .80
Maintenance and Repairs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .81
Cleaning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .81
Disposal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .81
Battery Disposal. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .81
Chapter 9: Specifications 83
Catalogue Codes. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .85
Appendix A: Event Codes 87
UK SMETS2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .87
Index 99

SGM1430-B Smart Meter Polyphase User Manual – SMETS2 1
Chapter 1 • Introduction
CHAPTER
1
I
NTRODUCTION
The purpose of this document is to provide qualified metering personnel with
product description; operating, maintenance, and upgrading instructions; site
analysis guides; and diagrams for the SGM1430-B smart meter family. It is not
intended to replace the extensive training necessary to install or remove meters
from service. Any work on or near energized meters, meter sockets, or other
metering equipment presents the danger of electrical shock. All work on these
products must be performed by qualified industrial electricians and metering
specialists only. All work must be done in accordance with local utility safety
practices and procedures.
Aclara Support
If you have questions, an issue, or would like to speak with Aclara's Support
personnel, please contact Aclara using one of the following methods.
Technical Support
representative.

2SGM1430-B Smart Meter Polyphase User Manual – SMETS2
Aclara Support

SGM1430-B Smart Meter Polyphase User Manual – SMETS2 3
Chapter 2 • Product Description
CHAPTER
2
P
RODUCT
D
ESCRIPTION
The SGM1430-B meter from Aclara is an advanced modular designed family of
products for small to medium enterprise and commercial installations. The
SGM1430-B is available in a number of different polyphase variants, and it forms
an integral part of a complete two-way, secure, end-to-end solution.
The SGM1430-B has been designed to offer flexibility and the choice of home
area network (HAN) and wide area network (WAN) communications. As
standard, the SGM1430-B supports different AMI technologies, including the UK
CSP communications hub solution. The communications hub mechanically
connects directly to the electricity meter. The hub communicates with the meter
using the ZigBee communication protocol. A manufacturing option that provides
direct communications via a hardwired interface is also available.
The on-board ZigBee RF interface uses industry standard Smart Energy Profile
for HAN communications to the UK communications hub and in-home display
(IHD) respectively.
The standard meter is supplied with an integrated 3 x 100 A switch for
connect/disconnect of the consumer supply. Certain models of the SGM1430-B

4SGM1430-B Smart Meter Polyphase User Manual – SMETS2
General Information
meter offer an optional 2 A load control relay for control of other ancillary devices
such as night storage heating, pumps, etc.
The meters also support a comprehensive tariff developed in association with the
UK Great Britain Companion Specifications Standard as well as both seasonal
time of day (STOD) and block tariffs.
Additionally, the meters offer storage for two years of load profile data and
support independent profiling of voltage profile data, typically line voltage,
current, frequency, etc. The SGM1430-B meter also provides, as standard,
enhanced power quality features offering support of sag/swell and under/over
voltage.
Designed with installation in mind, the SGM1430-B meter offers a means for a
quick and secure deployment. A custom-designed LCD provides added value
information. For example, when ZigBee is used, information such as HAN pairing
progress, notification of pairing complete, local signal strengths for HAN, etc. is
displayed to improve the installation experience. Refer to Installation on page 69
for more information on installing an SGM1430-B meter.
All SGM1430-B meters have a common layout for buttons, optical port, display,
and pulse indicators. The communications hub interface is also standardized
across all meter models. The SGM1430-B meter can be customized with optional
variants and extras, including the following:
• Back-lit LCD
• Hardwired Communications Interface
• Magnetic Detection
• Removal of the HAN
General Information
The key features of the SGM1430-B meters include:
• Product life of 20 years
• Polyphase direct connected (whole current)
• Optional one or two 2 A auxiliary relay
• A field-replaceable CSP communications hub that prevents disruption of
service
• Comprehensive metrology – active, reactive, and apparent energy; import
and export
• Extensive tariff capability – 48 x standard time of day TOU registers and 4 x
8 block tariff
• Two years of load profile data storage
• Three months voltage profile data

SGM1430-B Smart Meter Polyphase User Manual – SMETS2 5
Chapter 2 • Product Description
• Daily, weekly, and monthly billing data
• Voltage sag/swell, under and over voltage
• Over and Under Frequency
• Power Factor Threshold
• Comprehensive event logging with over 100 unique event codes, as well as
Security, Power Event, Standard Event, and ALCS logs for event storage
• Enhanced physical and electronic security (tamper, password levels)
• HAN support of industry standard Smart Energy Profile
• GPRS wide area network for remote retrieval of data to a headend system
via CSP communications hub
• DLMS COSEM compliant via the optical port
• Firmware over-the-air (FOTA) full upgrades
• Change of tenancy and supplier – CoT and CoS
• Dual firmware versions - Firmware rollback feature during firmware update
• Extensive data storage
• Simultaneous local and remote communication without performance loss
• Enhanced power quality monitoring including voltage, frequency, and power
factor
• Control of external loads via auxiliary relay
• Short terminal cover
• Tariff Structure:
Features
The SGM1430-B smart meter family has the following main features:
• Processor internal memory with 1.5 MB of flash memory for program and
boot, plus 640 KB of internal RAM
• Active and Deferred Tariffs • 50 Special Days
• 48 Time-of-Use Registers • 200 Switching Times
• 4 x 8 Block Tariffs • 13 End of Month Billing Dates
• 4 Seasons • 5 Weekly Billing Dates
• 5 Week Profiles • 31 Daily Billing Sets
• 16 Day Profiles

6SGM1430-B Smart Meter Polyphase User Manual – SMETS2
Models
• External serial flash memory with 16 MB for configuration and operational
data as well as for firmware upgrade image storage
• Configurable display with auto and manual scroll lists and user-defined
fields
• Independent communication ports: local optical port, AMI interface port
(GPRS as standard), and ZigBee HAN port
• Configurable time-of-use (TOU) operation to support full flexibility tariffing
• Flexible calendar definition that supports up to 48 daily time periods, 16 day
types, four week types, 50 designated holidays or special days, and four
seasons
• Configurable measurement profile with independent measurements for each
measuring element
• Select demand measurement for demand calculation, including selected
measurement profile and selectable demand interval
• Prepayment mode of operation
• Field-replaceable CSP communications hub that provides flexibility for
WAN communications
• Tamper detection for meter cover, terminal cover, and communications hub
cover
Models
The SGM1430-B smart meter family is made up of meters of common physical
characteristics and functionality. The nomenclature of the meter models indicates
the following:
The following models are currently available in the SGM1430-B smart meter
family:
Model Connect
Type Phase Current
Elements
3 x 100 A
Contactor
2 A
Auxiliary
Relay
Itr – Iref (Imax)
SGM1431-B Direct Poly 3 Yes No 0.5-10 (100 A)
SGM1432-B Direct Poly 3 Yes Yes x 1 0.5-10 (100 A)
SGM1433-B Direct Poly 3 Yes Yes x 2 0.5-10 (100 A)

SGM1430-B Smart Meter Polyphase User Manual – SMETS2 7
Chapter 2 • Product Description
Terminal Arrangements
The SGM1430-B polyphase meters conform to the British Standard Institute code
of practice (BS 7856:2013).
SGM1431-B
SGM1432-B
SGM1433-B

8SGM1430-B Smart Meter Polyphase User Manual – SMETS2
Terminal Arrangements
Table of contents
Other Aclara Measuring Instrument manuals
Popular Measuring Instrument manuals by other brands

Vemer
Vemer EVM-2DIN user manual

BW SENSING
BW SENSING AS400 Series Technical manual

BRUEL & KJAER
BRUEL & KJAER 9737 user manual

Agilent Technologies
Agilent Technologies 5977B Series Troubleshooting and maintenance guide

Olympus
Olympus USPM-RUIII Series Hardware operation manual

Monitor
Monitor Monidrop W operating manual

Thermo Scientific
Thermo Scientific LevelPRO user manual

Toro
Toro 132-1300 installation instructions

Bosch
Bosch GPL100-30G Operating/safety instructions

EUTECH INSTRUMENTS
EUTECH INSTRUMENTS WATERPROOF CYBERSCAN PH 300310 PHMV METER instruction manual

Johnson
Johnson 40-6535 instruction manual

Hach
Hach PHC705A user manual