4
Contents
4.5 Functional principle ............................................................................. 27
4.5.1 Function in normal operation .................................................... 28
4.5.2 Automatic antiflood protection system....................................... 28
4.5.3 Emergency seal ...................................................................... 29
4.5.4 Operational readiness with mains voltage failure......................... 30
4.5.5 Manual switching-off of control ................................................. 31
4.5.6 Manual operation of operating seal ........................................... 32
4.6 Suggested installation ......................................................................... 34
4.7 Type plate.......................................................................................... 35
4.8 Accessories ....................................................................................... 35
5 Technical data..................................................................................... 36
5.1 Quatrix-K automatic antiflood protection system for above ground pipes36
5.3 Data of control ................................................................................... 38
6 Installation .......................................................................................... 39
6.1 Safety during installation...................................................................... 39
6.2 Between installation and electric installation........................................... 40
6.3 Sanitary installation............................................................................. 41
6.3.1 Installation in the above ground pipeline .................................... 41
6.3.2 Installation in the base plate (with shaft system) ......................... 42
6.4 Electric installation.............................................................................. 45
6.4.1 Assembly of control ................................................................ 46
6.4.2 Assembly of electric motor ...................................................... 47
6.4.4 Connection of pressure hose.................................................... 48
7 Commissioning and operation ............................................................50
7.1 Safety during commissioning and operation ........................................... 50
7.2 Initial commissiong ............................................................................. 51
7.2.1 Prerequisites, presence and realisation.....................................51
7.2.2 Programme start .................................................................... 52
7.2.3 Check of the operating seal ..................................................... 52
7.2.4 Check of the emergency seal ................................................... 52
7.2.5 Check of backflow detection by the control................................ 53
7.2.6 Tightness test ........................................................................ 54
7.2.7 Hand over the automatic antiflood protection system to the user.. 56
7.3 Operation........................................................................................... 58
7.3.1 Automatic self-test .................................................................. 58
7.3.2 Notes on operation during backflow.......................................... 58