
Table of contents
Table of contents
1 About this document ............................... 5
1.1 Target groups ................................. 5
1.2 Other applicable documents ................ 5
1.3 Warnings and symbols ....................... 6
1.4 Technical terms ............................... 6
2 Safety ................................................. 7
2.1 Intended use .................................. 7
2.2 General safety instructions .................. 7
2.2.1 Product safety ................................ 7
2.2.2 Operator's obligations ........................ 8
2.2.3 Obligations of personnel ..................... 8
2.3 Specific hazards .............................. 8
2.3.1 Explosion-hazard area ....................... 8
2.3.2 Hazardous pumped liquids .................. 8
2.3.3 Magnetic field ................................. 8
3 Layout and function ................................ 9
3.1 Labels ......................................... 9
3.1.1 Type plate ..................................... 9
3.1.2 ATEX plate .................................... 9
3.1.3 Pump type code .............................. 9
3.2 Layout ......................................... 10
4 Transport, storage and disposal .................. 13
4.1 Transport ...................................... 13
4.1.1 Unpacking and inspection on delivery . .... . 13
4.1.2 Lifting .......................................... 13
4.2 Treatment for storage ........................ 14
4.3 Storage ....................................... 15
4.4 Removing preservative ...................... 15
4.5 Disposal ....................................... 16
5 Setup and connection .............................. 17
5.1 Preparing the setup .......................... 17
5.1.1 Checking the ambient conditions .. .. .. .. .. . 17
5.1.2 Preparing the installation site ............... 17
5.1.3 Preparing the foundation and surface ... .. . 17
5.1.4 Removing preservative ...................... 17
5.1.5 Installing heat insulation (optional) .. .. .. .. .. 17
5.2 Installation on a foundation .................. 18
5.2.1 Placing the pump unit on the
foundation .................................... 18
5.2.2 Fastening the pump unit ..................... 19
5.3 Planning the piping ........................... 19
5.3.1 Specifying supports and flange
connections ................................... 19
5.3.2 Specifying nominal diameters .. .. .. .. .. . . . . . 19
5.3.3 Specifying pipe lengths ...................... 19
5.3.4 Optimizing cross-section anddirection
changes ...................................... 19
5.3.5 Discharging leaks ............................ 20
5.3.6 Providing safety and control devices
(recommended) .............................. 20
5.4 Installing in the pipe .......................... 20
5.5 Installing the motor ........................... 21
5.6 Connecting the pipes ........................ 21
5.6.1 Keeping the piping clean .................... 21
5.6.2 Installing auxiliary piping ..................... 21
5.6.3 Installing the suction pipe .................... 21
5.6.4 Installing the pressure pipe .................. 21
5.6.5 Inspection for stress-free pipe
connections ................................... 22
5.7 Electrical connection ......................... 22
5.7.1 Connecting the motor ........................ 22
5.7.2 Checking the sense of rotation .............. 22
5.8 Installing the coupling guard ................ 22
6Operation ............................................ 23
6.1 Preparations for the initial start-up .. .. .. .. .. 23
6.1.1 Identifying the pump type .................... 23
6.1.2 Removing preservative ...................... 23
6.1.3 Filling and bleeding .......................... 23
6.1.4 Checking the sense of rotation .............. 23
6.2 Start-up ....................................... 24
6.2.1 Switching on .................................. 24
6.2.2 Switching off .................................. 24
6.3 Shutting down the pump ..................... 25
6.4 Start-up following a shutdown period ... ... . 26
6.5 Operating the stand-by pump ............... 26
7 Maintenance ......................................... 27
7.1 Inspections ................................... 27
7.2 Maintenance .................................. 27
7.2.1 Antifriction bearings lubricated with
grease ......................................... 28
7.2.2 Cleaning the pump ........................... 28
7.3 Dismounting .................................. 28
7.3.1 Returning the pump to the manufac-
turer ........................................... 29
7.3.2 Preparations for dismounting ................ 29
7.4 Installing ...................................... 30
7.5 Ordering spare parts ......................... 30
8 Troubleshooting .................................... 31
9 Appendix ............................................. 34
9.1 Sectional drawing ............................ 34
9.1.1 Auxiliary connections ........................ 34
9.1.2 Part numbers and designations ............. 34
9.1.3 Overview sectional drawing ................. 35
9.1.4 Exploded drawings ........................... 38
9.2 Technical specifications ...................... 41
9.2.1 Ambient conditions ........................... 41
9.2.2 Sound pressure level ........................ 41
9.2.3 Tightening torques ........................... 41
9.2.4 Cleaning agents .............................. 42
9.2.5 Flange loads according to ISO 5199 . . .. . .. 42
2 CMA, CMAT and CMIT series BA-2017.02 en-US 160-261/0 – 550 405