
Table of contents
Table of contents
1 About this document ............................... 5
1.1 Target groups ................................. 5
1.2 Other applicable documents ................ 5
1.3 Warnings and symbols ....................... 6
1.4 Technical terms ............................... 6
2 Safety ................................................. 7
2.1 Intended use .................................. 7
2.2 General safety instructions .................. 7
2.2.1 Product safety ................................ 7
2.2.2 Obligations of the operating company . ..... 8
2.2.3 Obligations of personnel ..................... 8
2.3 Specific hazards .............................. 8
2.3.1 Explosion-hazard area ....................... 8
2.3.2 Hazardous pumped liquids .................. 8
2.3.3 Magnetic field ................................. 8
3 Layout and function ................................ 9
3.1 Label .......................................... 9
3.1.1 Type plate ..................................... 9
3.1.2 ATEX plate .................................... 9
3.1.3 Pump type code .............................. 9
3.2 Layout ......................................... 10
3.3 Auxiliary operating systems ... . . .. . .. .. .. . . . 11
3.3.1 Heating ........................................ 11
4 Transport, storage and disposal .................. 12
4.1 Transport ...................................... 12
4.1.1 Unpacking and inspection on delivery . .. . .. 12
4.1.2 Lifting .......................................... 12
4.2 Treatment for storage ........................ 13
4.3 Storage ....................................... 13
4.4 Removing preservative ...................... 14
4.5 Disposal ....................................... 14
5 Setup and connection .............................. 15
5.1 Preparing the setup .......................... 15
5.1.1 Checking the ambient conditions .. . .. .. . .. . 15
5.1.2 Preparing the installation site ............... 15
5.1.3 Preparing the foundation and surface ...... 15
5.1.4 Removing preservative ...................... 15
5.1.5 Installing heat insulation (optional) .......... 15
5.2 Installation on a foundation .................. 16
5.2.1 Placing the pump unit on the
foundation .................................... 16
5.2.2 Fastening the pump unit ..................... 17
5.3 Setup without foundation .................... 17
5.4 Installing the motor ........................... 18
5.5 Planning the piping ........................... 18
5.5.1 Specifying supports and flange
connections ................................... 18
5.5.2 Specifying nominal diameters .. .. . .. .. . . . .. . 18
5.5.3 Specifying pipe lengths ...................... 18
5.5.4 Optimizing cross-section and direction
changesv ..................................... 18
5.5.5 Discharging leaks ............................ 18
5.5.6 Providing safety and control devices
(recommended) .............................. 19
5.6 Connecting the pipes ........................ 19
5.6.1 Keeping the piping clean .................... 19
5.6.2 Installing auxiliary piping ..................... 19
5.6.3 Installing the suction pipe .................... 19
5.6.4 Installing the pressure pipe .................. 19
5.6.5 Inspection for stress-free pipe
connections ................................... 20
5.6.6 Inspecting the support foot for
distortion ...................................... 20
5.7 Electrical connection ......................... 20
5.7.1 Connecting the motor ........................ 20
5.7.2 Checking the sense of rotation .............. 20
5.8 Aligning the coupling precisely .............. 21
5.9 Aligning the motor ............................ 22
5.9.1 Aligning the motor with sets of shims ... .. . . 22
5.9.2 Aligning the motor with adjusting
screws ........................................ 22
5.10 Installing the coupling guard ................ 22
6Operation............................................ 23
6.1 Preparations for the initial start-up .. . .. . . . .. 23
6.1.1 Identifying the pump type .................... 23
6.1.2 Removing preservative ...................... 23
6.1.3 Lubricating the bearings ..................... 23
6.1.4 Preparing auxiliary systems (if
available) ..................................... 24
6.1.5 Filling and bleeding .......................... 24
6.2 Start-up ....................................... 24
6.2.1 Switching on .................................. 24
6.2.2 Switching off .................................. 25
6.3 Shutting down the pump ..................... 25
6.4 Start-up following a shutdown period ... .. .. 26
6.5 Operating the stand-by pump ............... 26
7 Maintenance ......................................... 27
7.1 Inspections ................................... 27
7.2 Maintenance .................................. 28
7.2.1 Antifriction bearings lubricated with
grease ......................................... 28
7.2.2 Antifriction bearings lubricated with oil .. . .. 28
7.2.3 Cleaning the pump ........................... 28
7.3 Dismounting .................................. 29
7.3.1 Returning the pump to the
manufacturer ................................. 30
7.3.2 Preparations for dismounting ................ 30
7.4 Installing ...................................... 31
7.5 Ordering spare parts ......................... 31
8 Troubleshooting .................................... 32
2 CNH-M series BA-2010.03 460.0019 GB – 550 267