10
Step 7:
Pull out the belt about 10-15cm from main gear box side, make the second mark with 10
tooth from the first mark.
Step 8:
Install the belt clamp and carrier assembly, from the left sideof the second mark.
Please note that the carrier assembly direction.
Step 9:
Assemble the corresponding accessories: runners, buffers and track locker. Standard
quantity of runners: 8 pcs/1meter, and so on.
Step 10:
After the accessories are put in, tighten the screws of the track locker. The part of main
gear box is assembled.