
5.9 Performance characteristics of
the tractor 44
6Preparing the implement 46
6.1 Calculating the required tractor
characteristics 46
6.2 Calculating the permissible
payload 49
6.3 Coupling the implement 49
6.3.1 Coupling the ISOBUS or control
computer 49
6.3.2 Coupling the power supply 50
6.3.3 Coupling the hydraulic hose lines 50
6.3.4 Coupling the 3-point mounting frame 52
6.3.5 Coupling the Centaya pack top
seed drill 52
6.4 Preparing the implement for
operation 55
6.4.1 Opening and closing the roller
tarpaulin 55
6.4.2 Adjusting the working position sensor 55
6.4.3 Setting the fill level sensor 56
6.4.4 Filling the hopper 57
6.4.5 Adjusting the coulter pressure on
the TwinTeC Special coulter 58
6.4.6 Adjusting the coulter pressure on
the RoTeC coulter 60
6.4.7 Adjusting the seed rate increase 61
6.4.8 Adjusting the placement depth on
the TwinTeC Special coulter 62
6.4.9 Adjusting the placement depth on
the RoTeC coulter 65
6.4.10 Adjusting the coulter harrow 66
6.4.11 Adjusting the exact following harrow 69
6.4.12 Adjusting the tramline marker 75
6.4.13 Adjusting the row spacing 76
6.4.14 Setting up the speed sensor 77
6.4.15 Operating the one-sided switching 78
6.4.16 Using the loading board steps 79
6.4.17 Preparing the metering unit for
operation 79
6.5 Preparing the machine for road
travel 91
6.5.1 Moving the exact following harrow
into transport position 91
6.5.2 Folding the tramline marker on the
exact following harrow 91
6.5.3 Putting the road safety bars on the
exact following harrow 92
7 Using the implement 93
7.1 Removing the road safety bars 93
7.2 Moving the exact following
harrow into working position 93
7.3 Unfolding the tramline marker 94
7.4 Using the implement 94
7.5 Checking the placement depth 95
7.6 Turning on the headlands 95
7.7 Performing maintenance work
during operation 96
8Eliminating faults 97
9 Parking the implement 103
9.1 Emptying the hopper 103
9.1.1 Emptying the hopper via the quick
emptying 103
9.1.2 Emptying the hopper via the
metering unit 103
9.2 Emptying the metering unit 108
9.3 Uncoupling the ISOBUS or
control computer 112
9.4 Uncoupling the power supply 112
9.5 Uncoupling the seeding
combination 113
9.6 Disconnecting the hydraulic
hose lines 114
9.7 Parking the Centaya pack top
seed drill 114
10 Repairing the implement 118
10.1 Cleaning the implement 118
10.2 Maintaining the implement 119
10.2.1 Maintenance schedule 119
MG7508-EN-GB | B.1 | 31.08.2022 | © AMAZONE
II