Auger Torque 99-95200025-ISSUE 1-0 User manual

11
B
1
1
2
5
6
7
8
8
9
10
11
8
8
9
10
11
3
4
C
26Nm/19ft-lb
26Nm/19ft-lb
100Nm/74ft-lb
A
11 EUROPE: +44 (0) 1451 861 562 AUSTRALIA: +61 (0) 7 3274 2077 USA: (+1) 844 287 6300
ENGLISH
For warranty purposes this product MUST be registered with Auger Torque within
14 days of purchase by the end user.
MOUNTING - HITCH FITTING
There are two types of Pin for fitting the hood to the Mounting Hitch (1):
The Threaded Mounting Pin (item 2, Fig B) has a locating plate with a hole that fits over a peg in the hood ear. Align the Pin
holes, fit the Pin (2), washer (3) and nylon insert nut (4) and torque to 100Nm/74ft-lb.
To fit the Through-Bolted Mounting Pin (item 5, Fig C), align the Pin holes and push the Pin (5) fully home taking care to
line up the Through Bolt holes. At both ends of the Pin fit the Through Bolts (6) and Nylon Insert Nuts (7) and tighten to
26Nm/19ft-lb.
Single Pin Hitch
NOTE: The single Pin Hitch CANNOT be fitted to a quick Hitch.
Set the Earth Drill unit horizontally, with the output shaft towards the parent machine as in Fig A.
Fitting to the parent machine is with through-bolted Pins in all cases:
Align the Pin holes of the mounting Hitch (1) and parent machine.
Align bolt location holes fit spacers (8) if required to centralise the Hitch.
Push the Pin (9) fully home, taking care to line up the Through Bolt holes.
Fit the Through Bolts (10) and Nylon Insert Nuts (11) and tighten
to 26Nm/19ft-lb.
Once fitted, check the Earth Drill swings freely in all directions.
Double Pin and Double Pin Cradle Hitch
There are two types of Pin for fitting the Mounting Hitch (1) to the Parent Machine:
To attach a Linch Pin fitting (item 8, Fig B), align the Pin holes, push the Pin (8) fully home and fit the linch Pin (9).
To fit the Through-Bolted Mounting Pin (10, Fig C), align the Pin holes and push the Pin (10) fully home taking care to line up
the Through Bolt holes, fit the Through Bolts (11) and Nylon Insert Nuts (12) and tighten to 26Nm/19ft-lb.
99-95200025 - ISSUE 1-0
EARTH DRILL
QUICK START GUIDE
This Auger Torque quick start guide will enable you to get your new product up and running
in no time. The complete operators manual is available on the Auger Torque website.
To download a copy in pdf format, simply scan the QR code or visit www.augertorque.com.

22
11
25
6
7
10
11
12
8
9
3
4
26Nm/19ft-lb
26Nm/19ft-lb
100Nm/74ft-lb
B C
A
100Nm/74ft-lb
A
B
C
D
1
2
3
1
1
25
6
7
10
11
12
8
9
3
4
26Nm/19ft-lb
26Nm/19ft-lb
100Nm/74ft-lb
B C
A
22 EUROPE: +44 (0) 1451 861 562 AUSTRALIA: +61 (0) 7 3274 2077 USA: (+1) 844 287 6300
Double Pin Hitch
Set the Earth Drill unit horizontally, with the output shaft
towards the parent machine as in Fig A.
Double Pin Cradle Hitch
Set the Earth Drill unit horizontally in the cradle, with the
output shaft towards the parent machine as in Fig A.
Skid Steer Loader & Telehandler
ASlot the top of the parent machine frame under the
top edge of the Mounting Frame or Locating Hooks
(refer to parent machine operator’s manual).
BSwing the parent machine frame to the vertical
position.
CFollowing the parent machine operator’s manual,
ensure that the Mounting Frame is securely locked
in place.
DWorking as a pair, lift the Earth Drill in to place with
the port opening facing upwards Align hood ears
with the hole in the linkage block. Secure the Earth
Drill with the Pin (1), Washer (2) and Nylon Insert
Nut (3) and torque to 100Nm/74ft-lb.

33
2
3
41
5
6
100Nm/74ft-lb
B
A
M20 - 385Nm/284ft-lb
x3
x3
M10 - 46Nm/34ft-lb
A
56Nm/41ft-lb
73Nm/54ft-lb
1
/
2
” BSP
112Nm/83ft-lb
1” BSP
3
/
4
” BSP
137Nm/101ft-lb
1
1
/
4
” BSP
33 EUROPE: +44 (0) 1451 861 562 AUSTRALIA: +61 (0) 7 3274 2077 USA: (+1) 844 287 6300
MOUNTING - TRUCK CRANE
Linkage Block
Set the Earth Drill Unit horizontally, with the output shaft towards
the parent machine as in Fig A.
The Threaded Mounting Pin has a locating plate with a hole that
fits on a peg in the hood ear Fig B. Align the Pin holes in the hood
ears and Linkage Block (1), fit the Pin (2), Washer (3) and Nylon
Insert Nut (4) and torque to 100Nm/74ft-lb.
Align the holes in the Linkage Block (1) with the attachment ears
on the parent machine Fig B.
Insert the mounting Pin (5) and spring clip (6).
Once fitted, check that the Linkage Block swings freely.
Mounting points may differ. (refer to parent machine operator’s
manual for further information).
Attach Extension Clamp
Dedicated extension clamps are supplied for each model of truck
crane.
Fit the 2 halves of the boom clamp with M20 bolts, Nylon Insert
Nuts, Washers & Spacers provided and torque to 385Nm/284ft-lb.
Note: To prevent the bottom of the clamp from flaring out, the
bottom bolts should always be tightened before the top bolts.
Attach Rope Wind Hitch
Fit the hitch with the 2 pins and secure with M10 bolts & nuts.
Tighten to 46Nm/34ft-lb.
The Rope Wind Hitch is supplied with a Linkage Block fitted.
HYDRAULIC CONNECTIONS
It is critical that the supply of oil is within the stated flow &
pressure limits for the particular Earth Drill.
Refer to the serial plate on the top of the Earth Drill hood.
When fitting hydraulic hoses, ensure that they are tightened to the
correct torque for the hose fittings (Fig A).
Quick Release Couplers are required for connection to the parent
machine, but may not supplied with the unit. These can be sourced
locally and should be compatible with the auxiliary hydraulic Quick
Release Couplers on the parent machine (Figs B & C). The parent
machine auxiliary hydraulic connections are normally located near the end of the loader arms, excavator dipper or truck
crane booms.
Ensure that the drilling rotation of the Earth Drill Unit is clockwise.

44
C
B
56Nm/41ft-lb
1/2” BSP
56Nm/41ft-lb
1/2” BSP
06-05-2021
44 EUROPE: +44 (0) 1451 861 562 AUSTRALIA: +61 (0) 7 3274 2077 USA: (+1) 844 287 6300
Rope Wind Hitch
Attach Hydraulic Hoses - Earth Drill
Fit the hoses to the motor ports. Tighten to 56Nm/41ft-lb.
Attach Hoses - Earth Drill Stop Valve
A hydraulic valve is fitted at the top of the rope wind hitch. The purpose of the valve is to stop the rotation of the Auger when
it reaches its stowed position. This function is described in more detail in the operators manual.
Fit the hoses to the Earth Drill Stop Valve. Tighten to 56Nm/41ft-lb.
FITTING THE AUGER
CHECK that the Auger is the correct model and type to fit the
Earth Drill Unit.
ENSURE that the Auger connections are clean before fitting.
USE suitably rated lifting equipment if required (see data plate
for weight).
Position the Auger in the vertical work position and support it
so that it cannot fall over.
Position the Earth Drill over the Auger and align the pin holes.
Lower the Earth Drill Unit onto the Auger.
Locate the Auger Drive Pin.
Secure the Auger Drive Pin with Linch Pin.
Table of contents