
Pan installation
Finalising installation
3 4
5
3
4
5
6
3
4
5
1 2
21
Gasket
Side entry
holes
Water supply
hose
(Sold separetly)
Pan inlet
Screw
Capping plug
Finished
wall
Finished
wall
Waste
pipe Template or pencil
Fixing hole
location
Pan
Wall
Waste
pipe
Anchor Sleeve
Cap
Screw
Hole
Anchor
Washer
Hexagonal
lag screw
Bracket
180 mm
180 mm
Position the cistern on the panby
centering the gasket on the pan
inlet. Securely tighten the screws so
the cistern is level.
Connect the supply hose to the shut-off valve to test the system for leaks. Shut off the
water supply and disconnect the hose. Insert a capping plug into the unused hole.
Drill fixing holes at the marked locations on the floor and insert the anchors where
required.
Place a washer onto each of the hexagon screws and fix the brackets to the floor.
Position the toilet in the marked location, while ensuring an effective connection is
made with the pan connector.
Install the plastic screw sleeves and use the screws to fix the toilet to the brackets.
Attached the chromed caps to the screw heads.
Ensure silicon rubber washer is fitted between seat connector and pan to ensure
seat is rigid.
Make final connection of water supply hose to shut-off valve. Test the system for leaks.
Apply a suitable sealant between the pan and adjacent surfaces.
Connect the supply hose to the
cistern inlet and feed the hose
through the appropriate side hole
in the pan.
Define the position of the connector.
Place the connector onto the pan, and
position the connector between the
outlet and waste pipe.
Using the pencil or template, mark
the positions of the floor fixing kit
holes.
Fit the lid and test the buttons.
Adjust the rods as required.
Install the seat as per the supplied seat
instructions front edge of seat. Should
follow the shape of the front edge of the pan.