
Mounting Instructions
Pentgode
DIN EN 1176 Stand 2008
Page 2 of 3
D. Beginning from the mast top, thread the net over the mast. The spreader bars
should point towards the mast top.
E. Attach the pre-assembled tensioning device to the mast top.
Important: Do not remove the plastic cover from the tensioning meachanism. Insert
the plastic cover into the mast too.
F. Lift the mast top and attach the spreader bars to the tensioning cables. Important:
The distance between the egg clamps is 26mm (>1’’).
G. At the middle foundation, place the Nylon-ring (with the groove pointing upwards)
onto the aluminium bulb.
H. Erect the mast as per the installation instructions.
If you are using a crane, please attach the sling to the join between the mast
and spreader bars. Important: The mast must slip into the groove of the Nylon-
ring once erected.