
BD / ED / FD (E2) 03/2019 page 2/68
Content
1. SAFETY..................................................................................................................4
1.1 Legal considerations ...........................................................................................................................4
1.2 Structure of the safety instructions......................................................................................................4
1.2.1 Signal word panel ..........................................................................................................................4
1.2.2 Safety alert symbol ........................................................................................................................5
1.2.3 Pictograms.....................................................................................................................................5
1.2.4 Word message panel structure......................................................................................................6
1.3 Localization / position of safety labels on the chamber ......................................................................6
1.4 Type plate............................................................................................................................................7
1.5 General safety instructions on installing and operating the chambers ...............................................8
1.6 Intended use .....................................................................................................................................10
1.7 Operating instructions.......................................................................................................................11
1.8 Measures to prevent accidents.........................................................................................................11
2. CHAMBER DESCRIPTION..................................................................................12
2.1 Chamber overview............................................................................................................................13
3. COMPLETENESS OF DELIVERY, TRANSPORTATION, STORAGE, AND
INSTALLATION....................................................................................................13
3.1 Unpacking, and checking equipment and completeness of delivery................................................13
3.2 Guidelines for safe lifting and transportation.....................................................................................14
3.3 Storage..............................................................................................................................................14
3.4 Location of installation and ambient conditions ................................................................................15
4. INSTALLATION OF THE EQUIPMENT...............................................................16
4.1 Electrical connection .........................................................................................................................16
4.2 Connection to a suction plant (optional)............................................................................................17
5. START UP............................................................................................................17
5.1 Turning on the chamber....................................................................................................................17
5.2 Heating operation display..................................................................................................................17
5.3 Air change.........................................................................................................................................18
6. OPERATING THE CONTROLLER.......................................................................18
6.1 Display / entry of temperature set-point (without ramp function)......................................................18
6.2 Display / entry of temperature set-point (with selected temperature ramp)......................................19
6.3Time functions: Continuous operation and Timer operation.............................................................20
6.3.1 Switching between “Continuous operation” and “Timer operation” .............................................21
6.3.2 Continuous operation...................................................................................................................21
6.3.3 Timer operation: Setting the tempering time................................................................................22
6.4 User level settings.............................................................................................................................23
6.4.1 Temperature unit change between degrees Celsius °C and degrees Fahrenheit °F..................23
6.4.2 Entering a temperature ramp.......................................................................................................24
6.4.3 Chamber addressing....................................................................................................................24
6.5 General notes....................................................................................................................................25
7. TEMPERATURE SAFETY DEVICES...................................................................26
7.1 Temperature safety device class 2 (DIN 12880) ED, FD..................................................................26
7.2 Temperature safety device class 3.1 (DIN 12880) BD (option for ED, FD)......................................27