BURNiT Pell Easy series User manual

TECHNICAL PASSPORT
INSTALLATION and OPERATION MANUAL
PELLET BURNING BOILER
Pell Easy series
Version p0.0.2
EN

2
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL

3
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
TABLE OF CONTENTS
1. EXPLANATION OF SYMBOLS AND SAFETY INSTRUCTIONS .................................. 4
1.1. Explanaon of symbols ......................................................................................... 4
1.2. Requirements to boiler installaon room ............................................................ 4
1.2.1. Instrucons to boiler installer .............................................................................. 4
1.2.2. Instrucons to installaon user ............................................................................ 5
1.2.3. Minimum clearances for installaon and ammability of construcon materials-6
2. PRODUCT DESCRIPTION ...................................................................................... 7
2.1. Design structure of boiler Pell .............................................................................. 7
2.2. Safety devices of pellet boiler and burner ............................................................ 7
3. FUELS..................................................................................................................... 8
4. TRANSPORTATION OF THE BOILER .................................................................... 10
5. DELIVERY OF THE BOILER ................................................................................... 11
6. INSTALLATION OF THE HEATING BOILER ............................................................ 11
7. SETUP OF THE HEATING BOILER ......................................................................... 11
7.1. Connecng the boiler to a chimney ................................................................... 11
7.2. Connecng the boiler to the mains power supply ............................................. 13
7.3. Connecng the boiler to the heang installaon ................................................ 16
7.4. Air Bleeding......................................................................................................... 16
7.5. Connecng diagrams........................................................................................... 18
8. FILLING THE HEATING INSTALLATIO.................................................................... 22
9. OPERATION OF BOILER ...................................................................................... 21
9.1. Operaon of pellet boiler Pell Easy ..................................................................... 21
9.2. Important recommendaons for long-lasng and correct operaon of the boiler ... 22
9.3. Requirements for the cleaning and maintenance of Pell Easy pellet boiler ....... 22
10. MICROPROCESSOR CONTROLLER....................................................................... 27
11. CONNECTING WI-FI MODULE TO THE PELLET BOILER..........................................34
12. WARRANTY TERMS............................................................................................. 36
13. TECHNICAL FEATURES ........................................................................................ 41
13.1. Technical features of Pell Easy pellet boiler ....................................................... 41
13.2. Technical parameters of Pell Easy pellet boiler.......................................................42
14. RECYCLING............................................................................................................47

4
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
1. EXPLANATION OF SYMBOLS AND
SAFETY INSTRUCTIONS
1.1. Explanaonofsymbols
CAUTION! - Important
recommendaon or warning
concerning safety condions during
installaon and operaon of boiler.
DANGER! - fault or improper use
may cause injury or be hazardous
to life of humans or animals.
FIRE HAZARD!- fault or improper
installaon and operaon may
cause re.
INFORMATION- Important
informaon on the proper
operaon of the product.
1.2. Requirements to boiler installaon
room
This manual contains important
informaon for the safe and correct
installaon, start-up and trouble-free
operaon and maintenance of the boiler.
The Pellet boiler can be used for heang
rooms only in the manner described in
this manual.
The applicaon and any other was the
area of operaon is not recommended by
the manufacturer and is not responsible
for the occurrence of defects or failures.
Note the boiler type data on the factory
rang label and the technical data
provided in chapter 14 in order to ensure
proper operaon of the product.
1.2.1. Instruconstoboilerinstaller
During installaon and operaon, the
country-specic requirements and
regulaons must be observed:
• Local construcon regulaons on
installaon, air supply and exhaust
gas extracon as well as chimney
connecon.
• Regulaons and norms concerning the
ng of the heang installaon with
safety devices.
• Required installaon of a smoke
detector in the boiler room.
Customer must undergo boiler
operaon/maintenance training
by authorized installer/service
shop
iUseonlyoriginalBURNiTparts
WARNING!Installaonandsetup
of the boiler should be done
by an authorized specialist /
serviceshopandmustfollowthe
safety instrucons and rules of
operaon.
DANGER of intoxicaon,
suocaon.
Inadequate inow of fresh air
to theboilerroommayresultin
dangerous leak of exhaust gases
duringboileroperaon.
- Make sure the air inlets and
exhaust gas outlets are not
clogged or closed.
- If faults are not remedied
immediately, the boiler must not
be operated.
- The user must be provided with
wrien instrucons on the fault
and the hazard it entails.
!
DANGER of re when burning
ammablematerialsorliquids.
- Flammable materials/liquids
must not be le in close proximity
of the burner and heang boiler.
- Instruct system user of the
allowed minimum clearances
from surrounding objects.
It is mandatory to assure a
backup power generator of
correspondingratedpower!(see
table1)

5
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
Table 1.
Electricity consumpon of the boiler
Maximum electrical input 360 W
Electrical input at nominal heat
output 70 W
Electrical input at minimum
heat output 45 W
1.2.2.Instruconstoinstallaonuser
$
DANGER of intoxicaon or
explosion
Toxic gases may be discharged
when burning waste, plascs,
liquids.
- Use only the fuels indicated in
this manual.
- In case of danger of explosion,
ignion or discharge of exhaust
gases in the room, stop the pellet
burner from operaon.
Customer must undergo boiler
operaon/maintenance training
by authorized installer/service
shop.
CAUTION! Danger of injury
/ damage of system due to
incompetentoperaon.
- The boiler must be serviced only
by persons familiar with the
operaon manual.
- As user, you are only allowed to
start the boiler up, adjust the
temperature of the boiler, shut
the boiler down and clean it.
- Unaended children must not be
allowed access to premises with
running boiler inside.
Safetyrulesforuseroperaon:
- Operate the boiler on recommended fuel
only, and to that end you must regularly
inspect the boiler room.
- Do not use ammable liquids for ignion
or increase of burner output.
- Clean the boiler surface using non-
ammable agents only.
- Do not place ammable objects onto the
burner housing and heang boiler cabinet
or in their proximity. (see diagram 1 for
the minimum clearances)
- Do not store ammable materials in the
boiler room.
- It is mandatory to strictly observe
instrucons for connecng the burner
to power network as well as to all
peripherals.
- Structural changes of the boiler by user
can cause damage to equipment or injury.
- Do not allow contact transmission of
electrical wire or touch any part of the
boiler, where the surface temperature can
exceed 70 °C.
- This manual should be kept throughout
CAUTION!Hotsurface!
Risk of burns if you touch the
runningsystem.Burnerhousing,
bodyandangearehotsurfaces
duringburneroperaon.
It is strictly prohibited to open
boiler inspecon doors with the
burner running.
The hopper hatch cover is not
allowed to remain open for
longer periods of me.
Also, exercise cauon when
touching the observaon port for
monitoring the burning process.
It may be hot.
It is mandatory to assure a
backup power generator of
correspondingratedpower!(see
table1)

6
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
ClassА – non-
ammable
Stone, bricks, ceramic les,
baked clay, soluons, plaster
free of organic addives.
Class B
– hardly
ammable
Gypsum board panels,
basalt ber needled felt,
berglass board, AKUMIN,
Izomin, Rajolit, Lignos,
Velox, Heraklit.
Class С1/С2
Medium
ammable
Wood beech, oak. Wood
sowood, layered wood
Class
C3 – easy
ammable
Asphalt, cardboard,
cellulose, tar, berboard,
cork, polyurethane,
polyethylene.
Diagram1. Recommended clearances between boiler and walls.
1.2.3. Minimum clearances for
installaon and ammability of
construconmaterials
The applicable minimum clearances in
your country may dier from the ones
specied below. Please, consult your
installer.
The minimum distance from the burner,
heang boiler or exhaust gas pipe to
objects or walls must be at least 200 mm.
Table 2.
Flammability of construcon materials

7
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
For general safety consideraons, we
recommend that the boiler be placed on
a foundaon made of class A material, see
table 2.
2. PRODUCT DESCRIPTION
Ecological and highly-ecient pellet
boiler Pell Easy is designed for ring
wood-pellets. The mantle fully covers
the combuson chamber. Eciency rate
reaching 92%. Approved in accordance
with EN 303-5, class 5.
2.1.DesignstructureofboilerPelleBurn.
Restingular body design is made of high-
quality boiler steel sheets with thickness
of 4 mm for the combustion chamber and
3 mm for the water mantle.
•Ecological. A high-end pellet boiler. The
wood-pellets used for fueling the boiler
are a renewable fuel with minimum
carbon emissions and ulmate burning
eciency.
•Automated. All boiler funcons are fully
automated – no human intervenon is
needed for the normal operaon of the
boiler. Owing to an improved algorithm
with oponal adjustment of a wide
variety of parameters, the system may
be nely tuned to any parcular heang
system to achieve opmum eciency
and fuel consumpon.
Controllerfuncons:
1)fully automated ignion and pellet
feed;
2)burnerself-cleaningfunction;
3)controls the operaon of central
heangcirculaonpump;
4)controls the operaon of DHW
(domeschotwater)pump;
5)controlsbyroomthermostat;
6)uegassensor;
• Efficient. To keep from losing heat into
the ambience, the boiler is insulated on
the outside by 50 mm high-temperature
wool. With its inteligent state-of-the-
art combustion control system the Pell
Easy boiler achieves efficiency rate of as
much as 92%
2.2. Safety devices of pellet boiler-and-
burner
A complex of safety devices provide for
the safety of the appliance. Air-feed fan,
step –regulated, controls the combuson
according to energy needs and is
maintained in opmal working order.
Independent STB thermostat shut-o the
burner and shut o the fuel feeding in
the combuson chamber in case of rising
boiler temperature.
•Thermostatic protection (80°С). The
thermostatic protection is fitted on the
auger chute. When the surface of the
feeder chute reaches 80°С, the control
stops the feeding of pellets into the
burner and signals for fault.
•Fuse. In case of electrical fault in the
system of the burner (short circuit,
current overload, etc.), the overload is
borne by the electrical fuse ed on the
main control panel of the burner (10 А).
•Power interrupon. Innovave
controller. In case of power interrupon,
all parameter sengs are stored in the
memory of the controller. Upon the

8
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
subsequent restart of the burner, the
controller resumes the execuon of
the program from the point when the
power interrupon occurred.
3. FUELS
All pellets are biomass manufactured
from common low-growing plants and
trees. The most common household type
pellets are made of sawdust and milled
wood chippings which are waste material
from wood used in the producon of logs,
furniture and other products. Wood is the
richest raw material which does not have
any impact on the producon costs of
food products or ethyl alcohol (ethanol).
The raw material is processed under high-
pressure and temperature and is pressed
to produce small-size cylindrical pellets.
The producon process may ulize so
wood material (such as sowood, pine),
hardwood (oak) as well as recycled waste
wood. Wood pellets are produced in
hammer mills or wood pellet plants.
Advantagesofwoodpellets:
Convenientstorage.
Pellet bags can be stored on a small area
in a dry garage, basement, service room or
shed.
Easyloading.
In most cases the boiler hopper needs
loading only once a week – this depends
on the hopper capacity.
Beercontroloffuelquanty.
The small size of the pellets allows
for precise fuel feeding. On the other
hand, the supply of air for reaching
opmal combuson eciency is easier
to adjust since the fuel quanty in the
combuson chamber remains constant
and predictable.
Fueleciency.
High combuson eciency is also
determined by consistently low moister
content of pellets (consistently under
10% as opposed to 20% to 60% moisture
content of the logs). Low moisture
content, controlled fuel porons and
precise air seng means high combuson
eciency and very low carbon oxides in
the ue gases.
When purchasing pellets, ask
for conformity declaraon and
cercate issued by an accredited
laboratory and make sure the
fuel meets the requirements
indicated in the manual. If you
purchase large amount of pellets
(bulksupplyfortheenreheang
season for example), ask your
supplier to provide accurate and
trueinformaonaboutthestorage
condions.
We recommend to use pellets with size of
6 - 8 mm. Density 600 - 750 kg/m3 heang
value 4.7-5.5 kWh/kg. Ash content – less
than 1% and moisture content up to 8%.,

9
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
EN ISO 17225-2:2014.
The opmal density of the pellets which
guarantees their quality is 605-700 kg per
cubic meter.
Pellet moisture content must not exceed
10%. Make sure you store your fuel in a
dry and well-venlated place.
Table 3. European Cercaon of Wood Pellets for Heang Purposes
Parameters Units ENplus-A1 ENplus-A2 EN-B
Diameter mm 6 (± 1)
8 (± 1)
6 (± 1)
8 (± 1)
6 (± 1)
8 (± 1)
Length mm 15 ≤ L ≤ 40 1) 15 ≤ L ≤ 40 1) 15 ≤ L ≤
40 1)
Bulk density kg / m2≥ 600 ≥ 600 ≥ 600
Caloric/heang value MJ / kg ≥ 16,5-19 ≥ 16,3-19 ≥ 16,0-
19
Humidity /moisture Ма .-% ≤ 10 ≤ 10 ≤ 10
Dust Ма .-% ≤ 1 3) ≤ 1 3) ≤ 1 3)
Mechanical durability Ма .-% ≥ 97,5 4) ≥ 97,5 4) ≥ 96,5 4)
Ash Ма .-% 2) ≤ 0,7 ≤ 1,5 ≤ 3,5
Melng point of ash °C ≥ 1200 ≥ 1100 -
Chlorine content Ма .-% 2) ≤ 0,02 ≤ 0,02 ≤ 0,03
Sulfur content Ма .-% 2) ≤ 0,03 ≤ 0,03 ≤ 0,04
Nitrogen content Ма .-% 2) ≤ 0,3 ≤ 0,3 ≤ 1,0
Copper content mg / kg 2) ≤ 10 ≤ 10 ≤ 10
Chromium content mg / kg 2) ≤ 10 ≤ 10 ≤ 10
Arsenic content mg / kg 2) ≤ 1,0 ≤ 1,0 ≤ 1,0
Cadmium content mg / kg 2) ≤ 0,5 ≤ 0,5 ≤ 0,5
Mercury content mg / kg 2) ≤ 0,1 ≤ 0,1 ≤ 0,1
Lead content mg / kg 2) ≤ 10 ≤ 10 ≤ 10
Nickel content mg / kg 2) ≤ 10 ≤ 10 ≤ 10
Zinc content mg / kg 2) ≤ 100 ≤ 100 ≤ 100
The opmal pellet ash content is ≤ 1%.
This also provides for less frequent
cleaning intervals for the burner.
The table below contains the parameters
which we recommend that you take into
consideraon when choosing fuel for your
Pell burner.
1) not more than 1% of the pellets may be longer than 40 mm, max. length 45 mm;
2) dry weight;
3) parcles <3.15 mm, parculate maer, before handing over the goods;
4) measurements with Ligno-Tester limit value ≥ 97,7% by weight.

10
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
4. TRANSPORTATION OF THE BOILER
We recommend to transport the heang
boiler to the installaon site in its
packaging placed on the pallet. During
transport and installaon, depending on
the weight, suitable safety devices should
be used in accordance with Direcve
2006/42/EC.
When transporng items weighing more
than 30 kg, the use of pallet jack, fork
truck or other hoisng devices is a must.
Product must be in original packaging
following the instrucons on the label -
to be protected from adverse weather
condions (snow, rain and dust) from
the shocks, and other acvies likely to
cause damage. In case of malfuncon of
the fan or the motor drive (noise, fricon)
or failure of high-tech elements such as
broken controller-screen, contact your
nearest authorized service center for
repairs and maintenance.
The boiler is securely fastened with
fasteners to a wooden pallet.
D1
B1
A1
C
Diagram 2. Indicaons dimensions
Pell Easy 20 35 35 XL
A1, mm Котелно тяло, горелка и палет 700 800 1150
B1, mm Котелно тяло, горелка и палет 800 900 900
C, mm Котелно тяло, горелка и палет 125 125 125
D1, mm Котелно тяло, горелка и палет 1370 1380 1380
Тегло, kg Котелно тяло, горелка и палет 252 347 370

11
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
5. DELIVERY OF THE BOILER
• Inspect the integrity of the packaging
upon delivery.
• Check whether all components
have been delivered to you. Boiler
consignment package includes:
1) PelletboilerPellEasy.
2)Safetyvalve3bar.
3)Hook
4) Technical passport. Installaon and
operaonmanual.
5) ServicebookletandWarrantycard
If any of the above items are missing,
contact your supplier.
6. SETUP OF THE HEATING BOILER
The assembly, installaon and
set-up of the boiler must be
performed by a technician
authorizedforsuchoperaons.
Installer must indicate to the
user of the installaon the
minimum clearances from
ammablematerialsandliquids.
Requirements:
- Boiler room must be frost-proof;
- Boiler room must allow for connuous
access of air necessary to maintain
combuson;
- Boilers must not be placed in inhabitable
rooms;
- All boiler rooms must have correctly
calculated vent depending on the boiler
output. The vent must be protected by
means of a net or grate.
The size of the vent is calculated
according to the formula:
А=6,02Q- where:
А – area of the vent in cm2,
Q – boiler output in kW
- Remove the packaging without pollung
the environment
- Observe building supervision
instrucons, in parcular the exisng
Ordinance on combuson devices and
storage of combuson materials, on
building requirements applicable to
installaon sites and on venlaon;
- The boiler must be placed on a
foundaon whose surface area is larger
than the base of the heang boiler
according to diagram 1;
- The boiler must be placed in a posion
which allows for the easiest possible
cleaning and servicing;
- Installaon must be carried out
according to installaon diagram 1
which shows the boiler housing;
- No objects made of ammable materials
or liquids may be placed on/near the
boiler;
7.NSTALLATION OF THE HEATING BOILER
7.1.Connecngtheboilertoachimney
Boiler-to-chimney connecon must
always comply with the exisng standards
and rules. The chimney must provide
sucient draught for evacuaon of the
smoke under any condions.
The proper funconing of the boiler
requires adequate sizing of the chimney
itself since the draught it produces aects

12
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
combuson, boiler’s output and life span.
The draught created by the chimney
is in funconal relaon to its cross-
secon, height and the roughness of its
interior walls. No other appliance may
be connected to the chimney serving the
boiler. Chimney diameter must not be
smaller than the ue outlet of the boiler.
Flue outlet must be connected to the
chimney opening. In terms of mechanical
properes, the ue outlet must be sturdy
and properly sealed (to avoid gas leak)
and allow for easy access for cleaning
on the inside. The inner secon of the
ue outlet must not be greater than the
eecve secon of the chimney and must
not narrow. Avoid using elbow joints.
The chimney cleaning opening has to be
in its lowest part. The chimney’s wall has
to be three plied where the medium layer
is from mineral wool. The thickness of the
insulaon is not less than 30 mm when
the chimney is seng up inside the house
and the thickness is 50 mm, when the
seng up is outside.
Please entrust choosing a chimney and
its installaon by a qualied professional.
The required distance between the boiler
and the chimney is 300-600 mm. Draught
regulator (1) must be installed at least 600
mm from the joint (connecon).
The use of flexible metal tubes
of stainless steel or aluminum
materialisforbidden!
Table 4. Recommended minimum sizes and
chimney dra
Model Chimney
diameter,
mm
Chimneydra,
Pа
20 kW Ø 100 мм 8 - 10
35 kW Ø 100 мм 10 - 15

13
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
i
Datainthetablesareforindicave
purposes.
Draughtdependsonthediameter,
height,unevenseconsalongthe
chimney surface and dierences
in temperature of combuson
products and outside air. We
recommendthatyouusechimney
edwithueterminal.Heang
specialist must calculate the
precisesizingofthechimney.
7.2. Connecng the boiler to the mains
powersupply
Such connecon must be
performed by a technician /
serviceshopauthorizedforsuch
operaons.
Cauon! ELECTRIC SHOCK
HAZARD!
- Before opening the unit: switch
o the voltage and secure the
unit against accidental restart.
- Observe installaon instrucons.
It is mandatory to assure a
backup power generator of
correspondingratedpower!(see
table1)
Impropercableconneconsmay
damagetheregulator!
The device may be damaged if
struckby alightning.Makesure
itisunpluggedduringthestorms.
To bring into exploitaon the boiler and
auger must be connected to the electricity
network 220V/50Hz with power cord.
Create ght connecon with the electrical
mains which complies with the local
regulaons.
1.Dooropenswitch
5.ExternalThermostat
6.Watertemp.sensor
10.Accumulatortemp.sensor
12.FlueGastemp.
14.Igniter
15.Fanasprimarycombuson
Fan
19.PelletsFeeder
21.Safetytemp.STB(water)
22.Safetytemp.STB(pellets)
26.WaterPump

14
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
Diagram 3. Wiring diagram of connecon of boiler elements to
the controller FUMIS - Alpha 65

15
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
Diagram 4. Wiring diagram of connecon of boiler elements to
the controller Fumis - Alpha 75

16
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
Table 5. TROUBLE-SHOOTING TABLE
Installaondamage
Cause Solution
Due to unsealed connecons Install the connecng piping strain-free to the boiler
connecons.
Due to freezing
If the heang installaon, including the piping network, has
not been built frost-proof, we recommend that you ll the
heang installaon with a liquid which has low freezing
point and corrosion protecon and anfreeze agent.
7.3. Connecngtheboilertotheheang
installaon.
Such connecon must be
performed by a technician /
serviceshopauthorizedforsuch
operaons.
To bring into exploitaon the boiler
and auger must be connected to the
electricity network 220V/50Hz with
power cord. Create ght connecon with
the electrical mains which complies with
the local regulaons.
Itismandatorytoinstallathree-
way valve (Laddomat or similar)
orafour-waymixingvalvewhich
to ensure that the temperature
of the heang medium fedinto
the boiler from the heang
installaonisatleast45°С.
7.4.AirBleeding.
Whenllingthesystemremove
thecapoftheautomacbleed
valve.Onceyouaresurethere
isnoairinthesystemreinstallit
inplace.

17
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
The STB safety thermostat has been
triggered.
Upon reaching a temperature of 95°С, the thermostatic
safety protection device is triggered and the fan is turned
off. To resume protection, remove the black cap on the
back panel of the boiler and press the button on the STB-
thermostat. Contact your installer to determine the cause of
protection triggering.
Lowboilertemperature.
Unabletoreachnormaltemperaturemodeof65°-85°С
Cause Solution
Inadequate sizing and/or
combinaon of heang appliances Immediately consult your installer about the problem.
Ejeconofunburnedpelletsintothecombusonchamberoftheboiler
Cause Solution
Poor adjustment of the fuel-to-air
rao from the burner controller
Contact your installer. It is necessary to set the burner
properly using gas analyzer
Ulizaon of low-quality pellets Use only fuel which meets the requirements specied in the
manual. (see secon 3. Fuel)
Formaonofclinkersandnoncombusbleinclusionsinsideburnerbody
Cause Solution
Ulizaon of low-quality pellets
(see secon 3. Fuel)
Use only fuel which meets the requirements specied in the
manual.
Low performance of the automac
cleaning system
Increase the frequency of inclusions of self-cleaning system
Improper seng of fuel-air mixture Adjust using gas analyzer
Boilertemperaturetoohigh.Controllerfailure
Cause Solution
Grid power uctuaons It is mandatory to assure a backup power generator of
corresponding rated power! (see table 1)
Power failure
High temperature of exhaust gases.
High temperature alarm is turning
on
Fume exhaust tubes of boiler water jacket are clogged with
soot. Reduced heat transfer. The boiler should be cleaned.
Please contact an authorized specialist / service shop to
clean the boiler.
High temperature in boiler water
jacket and low temperature in the
buer tank.
1. Incorrect ON/OFF temperature sengs of pumps.
2. Incorrect sizing of heang system.
Boilerwatertoohot,heangbodiestoocold
Cause Solution

18
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
7.5. Schemes of connecon to the
heangsystem
Diagram 45 Connecon of boiler Pell Easy to three-way valve
Such connecons must be
performed by a technician /
serviceshopauthorizedforsuch
operaons.

19
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
Diagram 6. Connecon of boiler Pell Easy to P type buer tank and three-way valve
BUFFER

20
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
Diagram 7. Connecon of boiler Pell Easy to combi tank KSC2, at plate solar collector PK
and three-way valve
BUFFER
This manual suits for next models
3
Table of contents
Popular Pellet Stove manuals by other brands

Extraflame
Extraflame LCD user manual

MCZ
MCZ PHILO Comfort Air Use and installation manual

Hudson River Stove Works
Hudson River Stove Works NIAGARA owner's manual

AUDAX
AUDAX 6 kW User and installation manual

Ravelli
Ravelli HR 160 SNELLA PLUS Use and maintenance manual

calimax
calimax Solida PR 08 02 01 operating instructions