CAMBRIDGE Olde English Paver Outdoor Fireplace Kit User manual

Manual de Instrucciones para la
Chimenea de Cambridge Olde Ingles
Ladrillos Pre-Empaquetado para Uso
Afuera
Cambridge Pre-Packaged
Olde English Paver Outdoor Fireplace Kit
Instruction Manual

2015
2
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Layer Reference Guide: Guía de Referencia:
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
Finished 7
6
Grade 5
4
3
2
1
Foundation Layer
2 3/4” Above Top of Foundation

2015
3
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Cambridge Fireplace
This unit is capable of burning natural gas, propane and wood. If either propane or natural gas is the
preferred method of burning, seek a licensed professional plumber before construction. Also, if using
propane or natural gas, a knockout is located on either side of the unit to facilitate gas piping. All pip-
ing and knockouts must be completed before installing blocks around unit as the unit will become inac-
cessible when construction is completed.
Tools Required for Fireplace Kit Installation:
Safety Goggles
Ear Protection
Dust Mask
Gloves
Shovels (digging & flat)
Metal Cutters for banding on cubes
Mason Hammer (chipping, hammer)
Road Stone Rake
Tamper (Hand or Mechanical)
Wheelbarrow
Level (2’ and 6’ recommended)
Speed Square
Caulk Gun 10 oz or 28 oz (depends on what size
adhesive is purchased)
Rubber Mallet
14” Demo saw with diamond blade
Tape Measure
Marking Device (pencil, soap stone, etc)
Chalk Line
Hand Broom
Concrete Tools (Trowel/Floats)
6 Foot ladder or scaffold according to your com-
pany’s state, and OSHA safety policy
Drill & 1/16” bit
5/16” nut driver
7 ¼” Circular saw with wood blade
4” Electric grinder
4” Diamond cup grinder
Items Included in the Fireplace Kit:
1 - Stainless Steel Fireplace with instruction manual
1 - 4 Foot air-cooled chimney
1 - Black powder coated termination cap
1 - Galvanized flashing for top of completed fireplace
2 - Reinforced concrete lintels 48” x 4” x 6”
4 - Reinforced concrete lintels 32” x 4” x 6”
3 - Plastic shim pack sheet for leveling lintels or
block as needed
6 - Precut 6”x 6” imported polished granite tile for
facing front of fireplace lintel
3 - Cubes of Cambridge Olde English Pavers
1 - Installation manual for concrete pad and Olde
English Pavers
Material Required:
¾” clean stone (approx. 1 ton)
Concrete (approx. 17-80 lb bags)
Cambridge concrete adhesive (approx. 6-29 oz. or 17
-10.3 oz. tubes)
(4 pcs) 2” x 4” x 8’ lumber
2 ½” wood screws
½” rebar (approx. 14’)
Silicone for flashing
* Estimated man hours for construction of the fire-
place will be 5 to 8 hours based on (2, 3, or 4) man
crew with moderate experience.

2015
4
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Chimenea de Cambridge:
Esta unidad es capaz de quemar el gas natural, el propano y la madera. Si el propano o el gas natural es
el método preferido de quema, busque a un plomero profesional autorizado antes de construcción. Tam-
bién, si usa el propano o el gas natural, un golpe de gracia está situado de cualquier lado de la unidad
para facilitar la instalación de tubos de gas. Toda la tubería y golpes de gracia deben ser terminados
antes de instalar bloques alrededor de la unidad pues la unidad llegará a ser inaccesible cuando se ter-
mina la construcción.
Herramienta requerida para la instalacion del
kit:
Anteojos de seguridad
Protecci n auditiva
Máscara de polvo
Guantes
Palas (& de excavaci n; Plano) Cortadores del
metal (para congregar en los cubos)
Martillo del mas n (que salta el & Martillo)
Rastrillo de piedra
Pis n (mano o mecánicos)
Carretilla
Nivel (2’ y 6’ recomendado)
Cuadrado de la velocidad
Calafatee el arma 10oz. o 28oz. (depende encen-
dido se compra qué pegamento del tamaño)
Mazo de goma
14” Sierra de versi n parcial de programa con-
sider con la lámina del diamante
Cinta métrica
Dispositivo de la marca (lápiz, piedra del jab n,
etc.)
Línea de tiza
Escoba de la mano
Herramientas concretas (paletas y flotadores)
Escala o andamio de 6Ft según su company’s
estado, y de la política de seguridad de OSHA;
Taladro y 1/16” pedacito
5/16” Aprietatuerca
7 1/4” Sierra Circular con la lámina de madera
4” Amoladora eléctrica
4” Amoladora de la taza del diamante
Artículos Incluidos en el Kit de Chimenea:
1-de acero inoxidable de chimenea con manual de
instrucciones
1-4 pies chimenea enfriado por aire
1-Polvo Negro tapa de terminación de cubierta
1-Galvanizado intermitente para la tapa de la chime-
nea completa
2-Dinteles de hormigón armado de 48”x4”x 6”
4-Dinteles de hormigón armado de 32”x4”x 6”
3-Hoja plástico de calza para nivelar dinteles o blo-
quear cuando sea necesario
6-6”x 6” Granito pulido importado
3-Cubos de Olde Inglés ladrillos
1-Manual de instalación para la plataforma de con-
creto y ladrillos Olde Inglés
Material Necesario:
¾” piedra limpia (aprox. 1 tonelada)
Concreto (aprox. 17 bolsas de 80 libras)
Cambridge adhesivo (aprox. 6-29 oz. o 17-10.3 oz.
tubos)
(4 piezas) de 2”x 4” x 8’de madera
2 ½” tornillos para madera
½” barra de refuerzo (aprox. 14’)
Silicona para el flasheo
*Las horas de trabajo estimadas para la construc-
cion de la chimenea seran 5 a 8 horas con (2, 3, o 4)
hombres con experiencia mederada.

2015
5
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Fireplace Concrete Pad Construction:
Call 811 for information on underground utility marking. Select desired location and excavate 52” L x
65 3/4” W x 12 3/4” D area for concrete pad. Fill excavated area with approximately 6” of ¾” clean
gravel, compacting every 3”. Frame remaining 4” with 2” x 4” lumber to create a level pad. (Be sure 2”
x 4” wood frame is perfectly level, front to back and side to side) See attached drawing for details of
steel reinforcement rod placement. Fill 2” x 4” wood frame with a 4,000 psi strong concrete mix.
*Allow pad to cure for minimum of 48 hours.
*Note: (Wood Box Additions) If you are going to add fire wood box extensions, either a single unit or a
set, it will be necessary to construct an additional concrete pad for each unit added.
Construccion concreta del cojín de la chimenea:
Llamada 811 para la información sobre la marca para uso general subterráneo. Seleccione deseó la local
-ización y excavan 52” L x 65 3/4” W x 12 3/4” D áreas para el cojín concreto. Instale cuatro 8” tubos
concretos del diámetro a la helada-línea según código local. Llene el área excavada de aproximada-
mente 6” de ¾” grava limpia, compactando cada 3”. Capítulo 4” restantes con madera de construcción
de 2” x 4” para crear un cojín nivel. (Sea sure el marco de madera 2” x 4” es perfectamente nivel, frente
ha atrás y lado a lado) vea el dibujo atado para los detalles de la colocación de acero de la barra del re-
fuerzo. Llene el marco de madera de los tubos concretos y de 2” x 4” de una mezcla de hormigón fuerte
de 4,000 PSI.
*Permita que el cojín cure para el mínimo de 48 horas.
*Note: (Adiciones para la caja de lena) Si usted va a agregar las extensiones de madera de la caja del
fuego, una sola unidad o un sistema será necesario construir los cojines concretos adicionales para cada
unidad agregada.

2015
6
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Fireplace Concrete Pad Detail-Cross Section Drawing /Concreta del cojín de la
chimenea detail-Dibujo Seccionado Transversalmente
A. 1/2” steel reinforcing rod / Barra de refuerzo de 1/2”
B. 4” concrete slab / Bloque de cemento de 4”
C. 6” of ¾ clean stone / 6” de ¾ grave limpia
Top View-Footing Detail / Vision Superior-Detaile De Pie
10”
6”
4”
A B C
52”
65 3/4”

2015
7
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Stones Included In The Kit:
48” Lintel (1 Piece)
40” Lintel (1 Piece)
32” Lintel (4 Pieces) 4”x4” Cut Stone (1 Piece)
Large (157 Pieces) Large to remove 3 ½” x 5 ½” (2 Pieces) Large to remove 3” x 8” (2 Pieces)
4”x4”

2015
8
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
5 1/2”x4 1/4” Small (2 Pieces) Small to remove 1”x1 1/2” (1 Piece) 1 1/2”x6 13/16”Small (1 Piece)
8 1/4”x5 1/2” Medium (7 Pieces) Cut Medium to remove 1 1/2”x1 1/2” (2 Pieces) Small (247 Pieces)
8 1/4”x8 1/4” Large (1 Piece) Medium (82 Pieces) 6 3/4”x6 3/4” Medium (1 Pieces)
Large to remove 3”x4” (1 Piece) Large to remove 3”x3” (1 Piece) 8 13/16”x8 13/16” Large (2 Pieces)

2015
9
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Additional Cut Stones
Large notch cut 1 1/2” x 1 1/2”
offset by 4”
(13 Pieces)
Large notch cut 1 1/2” x 1 1/2”
(15 Pieces)

2015
10
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Pad:
Mark a line 4” in on all sides on the concrete pad
to mark the outside perimeter of the fireplace.
Apply concrete adhesive and install per photo.
Capa 1:
Marque una línea 4” de todo los lados del cojín de
concreto a marca el perímetro exterior de la chi-
menea.
Aplique el pegamento concreto e instálelo por la
foto.

2015
11
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Layer 1-A:
Firebox Placement: Install firebox in the center
of the pad. Attach 4ft air-cooled chimney per
manufactures instructions enclosed in the fire-
box.
Capa 1-A:
Colocacion de la caja de fuegos:
Instale el unidad de la caja de fuegos 8 ¼” de la
del frente de la capa 1 y 9” adentro en lado
izquierdo y derecho. Ate la chimenea refrigerada
de 4 pies por fabrica la instruccion.

2015
12
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Layer 1-B:
Remove firebox top support with a Phillips
screwdriver. Take the 8 screws out removing the
firebox top face support. This will not be needed
for the install. See photo for details.
Capa 1-B:
Quite la ayuda de tapa del lugar de la caja de fue-
gos con un destornillador de Philips. Tome los 8
tornillos hacia fuera que quitan la caja de fuegos
ayuda de cara superior. Esto no será necesario
para la instalaci n. Vea la foto para los detalles.

2015
13
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Layer 1:
Piece Count = (2) Small, (3) Medium, (8) Large,
(1) Large notch cut 1 1/2” x 1 1/2”,
(1) Large notch cut 1 1/2” x 1 1/2” offset by 4”
Apply concrete adhesive and install per photo.
Capa 1:
Numero de piezas = (2) Pequeño, (3) Mediano,
(8) Grande, (1) Grande 1 1/2“x1 1/2“,
(1) Grande 1 1/2“x 1 1/2“ offset 4“
Aplique el pegamento concreto e instálelo por la
foto.
Large notch
cut 1 1/2” x
1 1/2”
Large notch
cut 1 1/2” x
1 1/2” offset
by 4”

2015
14
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Layer 2:
Piece Count = (2) Small, (3) Medium, (8) Large,
(1) Large notch cut 1 1/2” x 1 1/2”,
(1) Large notch cut 1 1/2” x 1 1/2” offset by 4”
Apply concrete adhesive and install per photo.
Capa 2:
Numero de piezas = (2) Pequeño, (3) Mediano,
(8) Grande,
Aplique el pegamento concreto e instálelo por la
foto.
Large notch
cut 1 1/2” x
1 1/2”
Large notch
cut 1 1/2” x
1 1/2” offset
by 4”

2015
15
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Layer 3: Hearth Layer
Piece Count = (2) Small, (3) Medium, (12) Large,
(1) Large notch cut 1 1/2” x 1 1/2”
Hearth will overhang 5 ¾” past layer 3 in the
front of the fireplace.
Apply concrete adhesive and install per photo.
Capa 3 Capa del Hogar
Numero de piezas = (2) Pequeño, (3) Mediano, (12)
Grande , (1) Grande 1 1/2”x 1 1/2”
El hogar sobresaldrá por capa 3 del pasado de 5
¾” en el frente de la chimenea.
Aplique el pegamento concreto e instálelo por la
foto.
Large notch cut
1 1/2” x 1 1/2”

2015
16
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Layer 4:
Piece Count = (2) Small, (2) Medium, (6) Large,
(1) Large notch cut 1 1/2” x 1 1/2”,
(1) Large notch cut 1 1/2” x 1 1/2” offset by 4”
(1) Medium Cut 8 ¼” x 5 ½”
Apply concrete adhesive and install per photo.
Capa 4:
Numero de piezas = (2) Pequeño, (2) Mediano, (6)
Grande, (1) Grande 1 1/2”x 1 1/2”, (1) Grande 1
1/2”x 1 1/2” offset 4”
Corte (1) Mediano 8 ¼” x 5 ½”
Aplique el pegamento concreto e instálelo por la
foto.
8 1/2”
5 1/2”
Large notch
cut 1 1/2” x
1 1/2” offset
by 4”
Large notch cut
1 1/2” x 1 1/2”

2015
17
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Layer 5:
Piece Count = (2) Small, (2) Medium, (6) Large,
(1) Large notch cut 1 1/2” x 1 1/2”,
(1) Large notch cut 1 1/2” x 1 1/2” offset by 4”,
(1) Medium Cut 8 ¼” x 5 ½”
Apply concrete adhesive and install per photo.
Capa 5:
Numero de Piezas = (2) Pequeño, (2) Mediano,
(6) Grande Corte, (1) Mediano 8 ¼” x 5 ½”, (1)
Grande 1 1/2”x 1 1/2”, (1) Grande 1 1/2”x 1 1/2”
offset 4”
Aplique el pegamento concreto e instálelo por la
foto.
Large notch
cut 1 1/2” x
1 1/2” offset
by 4”
Large notch cut
1 1/2” x 1 1/2”
8 1/2”
5 1/2”

2015
18
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Layer 6:
Piece Count = (2) Small, (2) Medium, (6) Large,
(1) Large notch cut 1 1/2” x 1 1/2”,
(1) Large notch cut 1 1/2” x 1 1/2” offset by 4”
(1) Medium Cut 8 ¼” x 5 ½”
Apply concrete adhesive and install per photo.
Capa 6:
Numero de piezas = (2) Pequeño, (2) Mediano,
(6) Grande, (1) Grande 1 1/2”x 1 1/2”, (1) Grande
1 1/2” x 1 1/2” offset 4”
Corte (1) Mediano 8 ¼” x 5 ½”
Aplique el pegamento concreto e instálelo por la
foto.
8 1/2”
5 1/2”
Large notch
cut 1 1/2” x
1 1/2” offset
by 4”
Large notch cut
1 1/2” x 1 1/2”

2015
19
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Layer 7:
Piece Count = (2) Small, (2) Medium, (6) Large,
(1) Large notch cut 1 1/2” x 1 1/2”,
(1) Large notch cut 1 1/2” x 1 1/2” offset by 4”
(1) Medium Cut 8 ¼” x 5 ½”
Apply concrete adhesive and install per photo.
Large notch
cut 1 1/2” x
1 1/2” offset
by 4”
Large notch cut
1 1/2” x 1 1/2”
8 1/2”
5 1/2”
Capa 7:
Numero de piezas = (2) Pequeño, (2) Mediano,
(6) Grande, (1) Grande 1 1/2”x 1 1/2”, (1) Grande
1 1/2” x 1 1/2” offset 4”
Corte (1) Mediano 8 ¼” x 5 ½”
Aplique el pegamento concreto e instálelo por la
foto.

2015
20
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit
Layer 8:
Piece Count = (2) Small, (2) Medium, (6) Large,
(1) Large notch cut 1 1/2” x 1 1/2”,
(1) Large notch cut 1 1/2” x 1 1/2” offset by 4”
(1) Medium Cut 8 ¼” x 5 ½”
Apply concrete adhesive and install per photo.
8 1/2”
5 1/2”
Large notch
cut 1 1/2” x
1 1/2” offset
by 4”
Large notch cut
1 1/2” x 1 1/2”
Capa 8:
Numero de piezas = (2) Pequeño, (2) Mediano,
(6) Grande, (1) Grande 1 1/2”x 1 1/2”, (1) Grande
1 1/2” x 1 1/2” offset 4”
Corte (1) Mediano 8 ¼” x 5 ½”
Aplique el pegamento concreto e instálelo por la
foto.
Table of contents
Other CAMBRIDGE Outdoor Fireplace manuals
Popular Outdoor Fireplace manuals by other brands

domi
domi LTCF5206 Assembly manual

Superior Fireplaces
Superior Fireplaces VRE6036RS manual

General Shale
General Shale Serenity 150 Assembly instructions

La Hacienda
La Hacienda 56177 User instructions

ELEMENTI
ELEMENTI Easton owner's manual

Masterbuilt
Masterbuilt GRANDMAC GMFP20S Assembly and operating instructions

Sunjoy
Sunjoy Vail L-FT769PST owner's manual

ELEMENTI
ELEMENTI OFG201 owner's manual

Flash Furniture
Flash Furniture YL-230-GG Assembly instructions

Gibraltar Built
Gibraltar Built Flare Premier Metro installation guide

pleasant hearth
pleasant hearth OFW530S-1 manual

Fireside Outdoor
Fireside Outdoor POP-UP PIT Customer's manual