73500I - PARALLEL OPERATION KITASSEMBLY AND OPERATION
2
ASSEMBLY AND OPERATION
This kit is intended for use on Champion Power Equipment 2000
Watt Inverter Generators. Please refer to your Inverter Owner’s
Manual for safety rules, start up and shut down procedures,
specifications and troubleshooting.
Setup and Operation
1. The two generators may be stacked one on top of the
other by aligning the lower pads and upper pockets at each
corner of the generators.
2. Disconnect or turn off all electrical loads from both
generators.
3. The economy switch must be in the same position on both
generators.
4. Remove caps from the power leads
5. Plug one pair of power leads (B), communication cable (A),
and ground wire (C) to inverter #1.
A
C
B
6. Plug the other pair of power leads (B), communication
cable (A), and ground wire (C) to inverter #2.
7. Align pins of the communication cable when connecting
(A).
8. Start engines of both inverters according to your Inverter
Operator’s Manual. Observe the green output indicator light
on both generator panels – The light will blink during start
up. When the light is steady you may connect devices.
9. Connect devices to parallel panel or generator panel
receptacles. Loads up to 25 amps may be connected to
the parallel kit receptacles. Individual loads connected
to generator panels must be less than the 20 amp panel
receptacle rating.
10. The total electrical load must not exceed 30 amps (3600
watts).
11. Follow the instructions in your Inverter Owner’s Manual for
turning off the generators.
12. Pull “sleeve” of communication cable to disconnect.