CONTENTS
Product Features and Specifications ......................................................1
Installation Requirement
……………………………………………………………………………….2
Steps of Installation …..........................................................................3
Exploded View ..................................................................................25
Test Run ………....................................................................................30
Operation Instruction .........................................................................31
Maintenance .....................................................................................31
Trouble Shooting ...............................................................................32
Classic CL3500P
Parking Lift

Parts List ..........................................................................................33
I. PRODUCT FEATURES AND SPECIFICATIONS
· Single point manual safety release.
· Four mechanical locking devices, each equipped with both primary and secondly safety
locks.
· Powerside column can be installed at both side, front or rear.
· Non-skid diamond platforms and adjustable safety lock ladders.
· Optional kits: Sliding jack with hand pump, caster kits, Jack tray, plastic oil tray.

2
CL3500P
SPECIFICATIONS
Model
Lifting Capacity
Lifting Height
Lifting
Time
Overall Length (Inc.
Ramps)
Overall Width
Width
Between
Columns
Gross
Weight
Motor
CL3500P
3.5T
(8,000 lbs)
1872mm
(73 3/4”)
80S
/40S
5257mm
(207”)
2784mm
(109 5/8”)
2438mm
(96”)
820Kg 1810
lbs
110V,1.5HP
/220, 3.0HP

3
II. INSTALLATION REQUIREMENT
A. TOOLS REQUIRED
Tape Measure (7.5m) Carpenter’s Chalk
Hammer Screw Sets
Level Bar
Pliers
(12") Lock Wrench
English Spanner
Wrench set Socket Head Wrench
(12#, 13#, 14#, 15#, 17#, 19#, 24#, 30#) (3#, 5#, 6#, 8#)
Fig. 2

4
B. SPECIFICATIONS OF CONCRETE
(See Fig. 3)
Specifications of concrete must be adhered to the specification as following. Failure to do so may result in
lift and/or vehicle falling.
1. Concrete must be thickness 100mm minimum and without reinforcing steel bars, and must be dried
completely before the installation.
2. Concrete must be in good condition and must be of test strength 3,000psi (210kg/cm²) minimum.
3. Floors must be level and no cracks.
C. POWER SUPPLY
The electrical source must be 2.2KW minimum. The source cable size must be
2.5mm² and in good condition of contacting with floor.
III. STEPS OF INSTALLATION
A. Check the parts before assembly
1. Packaged lift and Hydraulic Power Unit
(See Fig. 4)
.
Optional Plastic oil tray
Fig. 4
2. Open the outer packing carefully, check the parts according to the shipment list.
(See Fig. 5)
.

5
3. Take off the drive-thru ramps and columns
(See Fig.6)
.
Fig. 6
4. Loose the screws of the upper package stand, take off the offside platform, take out the parts inside the
powerside platform, then remove the package stand.
5.
Move aside the parts and check the parts according to the shipment parts list
6. Open the carton of parts and check the parts according to the parts box list
(See Fig. 8)
.
62

6
Fig. 8
7. Check the parts of the parts bag according to the parts bag list
(See Fig. 9)
.
B. Use a carpenter’s chalk line to establish installation layout as per Table 1
Make sure the size is right and base is flat
(see Fig. 10).
Note: Reserve space front and behind the installation site.
MODEL
A
B
C
REMARK
CL3500P
4400mm
173 1/4”
2784mm
109 5/8”
5207mm
205”

7
C. Install cross beams
(See Fig.11, Fig.12)
.
D. Install the Safety Ladders.
1. Take off the pulley safety cover and unscrew a nut of the safety ladders, and then adjust the four lower
nuts to be at the same position. Then install the safety ladder
6

8
2. Install Safety
Ladders
(See Fig.
14).
18
Safety ladder pass through the hole of
the top plate, then
tighten the two nuts
This height should be
the same for four
safety ladders
Fig. 14
E. Put the cross beams at the same height and lock on the safety ladder
(See
Fig. 15).

9
Fig. 15
F. Install power side platform.
1. Install the power side platform on the cross beams by a fork lift or manual, offset the cross beams to the
outside till the pulleys of both platforms can rest into the cross beams’ slots
(See Fig.15)
, Install the power
side platform and screw up the bolts.

10
2. Install tire stop plate with bolts and washer on the platform: Tighten the platform on cross beam B with
bolts, tighten the tire stop plate on cross beam A with bolts
Note: The bolts for the side with tire stop plate is longer, pay attention when
choosing the bolts
(See Fig.17)
Instruction: 1). This lift is designed in both side (cross beam A and cross beam B) car in direction, user can
install the lift according to the location. Below is the installation for the side of cross beam B car in direction.
If choosing the side of cross beam A car in direction, then install the tire stop plate to the other side.

11
2). Powerside column can be installed at any position on customers’ requirement, but the power unit must be
installed near the side with the safety lock release handle.
G. Install offside platform and plastic block, then install the bolts for the platform strengthen plate, check the
plumbness of columns with level and adjusting with the
24
26
25

12
limit slide blocks. Loosen 1/4 lap after tightening.
Fig. 18
H. Illustration for cable installation
1. Pass through the cables from the platform to the columns according to the number of
33
10
32
29
30
31
34

13
Fig. 19
2. The cable goes through the cross beam to top plate of columns and be screwed with
35
37
38

14
17

15
3. Illustration for platform cables
(See Fig. 21).
Limit slider
4
2
2
1
4
3
1
2
4
2
3
39
4
2

16
Fig. 21
I. Install release handle assy. See Fig.22
Noted: Power unit must be installed near the safety release handle.
from the safety lock rotated device
handle and the safety lock connecting assy. with
assy. of cross beam A/B
M8*35 bolts and
washers on cross beam A.
44
22
45

17
According to the above diagram, fix safety lock
Install
extend lock release handle and
connecting bar and safety lock connecting
plastic ball
assy. by M8*35 bolts and washers
on cross
beam B.
J. Install power unit and connecting tube
(See Fig. 23)
.
Noted: Power unit must be installed near the safety release handle. 1.Install Power unit on the
cross beam A
10
46
47
201

18
2.
Install Power unit on the cross beam B
(See Fig. 24)
.

19
Table of contents
Popular Lifting System manuals by other brands

ALMAC
ALMAC ATHENA 850-BL EVO TRANSLATION OF ORIGINAL INSTRUCTIONS

OMCR
OMCR B01.35 Use and maintenance manual

Rotary
Rotary 100 Series Operation and maintenance manual

Bishamon
Bishamon NSA3500N Operation and service manual

PFlow Industries
PFlow Industries B Series Owner's, Installation and Maintenance Manual

Tractel
Tractel tirak L 500 P Series Original Operation and Installation Manual