
p/n 003-914, Issue 1
STANDARD RECOMMENDED PROCEDURE 003-914 | ISSUE 1 | MARCH 2012 | PAGE 1 OF 3
| PRETERMINATED SYSTEMS | CABLES | CONNECTORS | CABLE ASSEMBLIES | HARDWARE | TOOL KITS AND ACCESSORIES | TEST EQUIPMENT | SPLICE EQUIPMENT | FAN-OUT KITS | TRAINING
Eclipse®Interbay Storage
Unit
1. COMPONENTS
1.1. Major Components
1.2. Kit Contents:
• Rearmountingbrackets(2)
• 12-24screws(16)
• Galvanizedhexbolt(1)
• Galvanizedhexnut(1)
• 10-32nylonhexnut(1)
• 1/4lockwasher(1)
• #10atwasher(12)
2. TOOLS AND EQUIPMENT
Inadditiontothenormalsupplyoftools,a9/16wrench
willbenecessary.
3. PLANNING
Beforeyoubeginyourinstallation,makesureyou
understandhowtheunitistobeinstalled,wheretheunit
willbeplaced,andhowthejumperswillberouted.
4. INSTALLATION
4.1. Foot Cap Installation
Theunitcomeswithallroutinghubsandtroughsalready
assembled.Theonlyassemblyrequiredisattachingthe
unittotheframe.
Step 1: ThefootextensionthatcomeswiththeIBD
istobeinstalledrst.Todoso,removethe
twoscrewsonthefrontoftheframefootcap
toremovethecover.
Step 2: RemovethefootcapcoverfortheIBDby
removingthescrewsinthefrontandthe
back.
TPA-4096
Routing Hubs
Feed-through
Ports
TPA-4098