02/2008 - Art. Nr. 13 017 117C 3
General information
Contents
Guarantee, safety
Main statutory instruments
Contents
General information
Guarantee, safety............................... 3
Main statutory instruments ................. 3
Burner description, packaging............ 4
Technical data
See technical data Nr 13015263
Installation
Assembly............................................ 5
Fuel-oil connection ............................. 6
Electrical connection .......................... 6
Pre-start-up checks ............................ 6
Start-up
Checking and setting
combustion components,
secondary air...................................... 7
Setting nozzles................................... 7
Description and settings
Combustion air ................................... 8
Safety units characteristics............... 10
Safety units diagrams....................... 11
Options of connection....................... 12
Electric connection box ...............13-14
Description and settings,
fuel-oil pump..................................... 15
Firing ................................................ 16
Setting and checking the safety
devices ............................................. 16
Maintenance.................................... 17
Troubleshooting ............................. 18
Guarantee
Installation and start up must be
performed in accordance with current
accepted practices by a technician.
Current regulations, as well as the
following instructions must be complied
with. Any failure, however minor, to
observe these provisions shall absolve
the manufacturer from any liability.
Also see:
- guarantee enclosed with burner,
- conditions of sale.
Safety
The burner is designed for installation on
a generator connected to correctly
functioning exhaust flues.
It should be used in an area where there
is an adequate supply of combustion air
and where polluted products can be
properly evacuated.
Flue size and design must be
appropriate to the fuel in compliance
with the current regulations and
standards.
The control and safety unit and the
cut-outs used require a power supply of
230 VAC % 50Hz
±1%
with an earthed
neutral wire.
It must be possible to isolate the burner
from the network by means of a
multipole switch complying with the
current standards.
Maintenance staff should always act
with extreme caution and in particular
avoid direct contact with electrical
circuits and with parts not fitted with heat
insulation.
Avoid splashing water on the electrical
components of the burner.
In the event of flood, fire, fuel leak or
abnormal operation (suspicious smell,
or noise, etc.) switch off the burner, turn
off the power and fuel supplies and call
in a qualified specialist.
It is essential that all furnaces and
accessories, waste gas ducts and
connection pipes are serviced, cleaned
and swept once a year and before
burner start-up. See the applicable
regulations in force.
Main statutory instruments “FR”
Dwellings :
- French Order dated 2nd August 1977
and later modifying / supplementary
orders: Technical and safety
regulations governing combustible
gas and liquified hydrocarbon
installations located inside dwellings
and their outbuildings.
- DTU Standard P 45-204: Gas
installations (formely DTU n° 61-1 -
Gas installations - April 1982 + later
addendums).
- DTU Standard 65.4 - Boiler house
technical provisions.
- French NF Standard C15-100 - Low
voltage electrical installation
regulations.
- French Departmental health
regulations.
Public Buildings :
- Public building fire and panic
prevention safety regulations:
General provisions :
- GZ sections (combustible gas and
liquified hydrocarbons);
- CH sections (heating, ventilation,
cooling, air conditioning and steam
and domestic hot water production);
Provisions specific to each type of public
building.
Outside “FR”
Refer to local regulations.
+