INTRODUCTION OF THE AIR EXCHANGE SYSTEM
BEFORE OPERATING YOUR AIR EXCHANGE SYSTEM,
MAKE SURE THAT:
- There are no loose objects within the unit or the air impeller;
- The coverings of construction-time are removed from
the outlet- and exhaust air holes;
- All isolations and steam barriers are in order;
- The heat transfer and fans are in their places;
- The condensing water outlet is installed and the water
is drained out;
- The air impellers and their adjusters are in working order;
- Afterheating is regulated and working.
USAGE DURING INSTALLING
The air exchange unit should be started as soon as
installation permits.
Efficient air exchange promotes drying of the constructions
and prevents damage.
In case channelling has not been completed, fans and adjustments
are missing,filter paper must be used in place of fans to keep
the channels clean andprovide sufficient counterpressure for
preventing overload. The unit must be used with full power and
check the drainage of the condensing water.
The appliance, filters and heat exchangers m ust be cleaned
and the systemadjusted after the construction works are
completed.
BASIC ADJUSTMENT OF AIRFLOW
The unit alone can not produce good interior ear in case
the channels and fans are installed carelessly and main
adjustments are not made.
Regulate the inlet and outlet fans to the planned positions
and start the unit
at design power speed. Measure the airflow in outside- and
exhaust air channels.
The outlet must be 5-10% higher than inlet. Check the
pressure level of thechannels by checking from the fans and
adjust it accordingly to obtain the pressure levels
for vents; adjust and lock the pattern.Draw measuring- and
adjustment records!
USAGE AND CORRECT LEVEL OF AIR EXCHANGE
The air exchange level is regulated by changing the
working speed of the air impeller from the operating panel.
Airflow of different adjustable positions can be seen
from table 2.
Adjustable position 1 is for basic air exchange for an empty house.
Adjustable position 2 and 3 are normal working positions.
Adjustable position 4 and 5 are efficiency positions (i.e. for saunas).
The correct usage positions will be found by experience;
observing the purity of the air or sultriness when coming in
from outside, observing moisture on the windows or drying
of the sauna.
AFTERHEATING AND SUMMER BYPASS OF INLET AIR
The unit is equipped with 500 W electrical battery operated
by the means of triac-adjuster operated by the operating device
for afterheating the heat recovered inlet air.
The temperature of inlet air is usually regulated to +17C.
The temperature may be adjusted to higher during winter so there
would be no draught like feeling. In case of severe frost and
efficiency mode the heating power might turn out insufficient –
in such circumstances, the air exchange should be reduced.
The overheating protection launched during malfunctioning
must be annulled manually.
During summertime, the bypass plate will be opened so the extract air will
not warm up the inlet air.
CONDENSING WATER AND FREEZING PREVENTION
Exhaust air heat exchanger cools the moisture exchanger condenses
into water, Which flows the condensation water in the pool and from
there through a hose through a water trap open sewer.
In freezing temperatures the water to Prevent freezing of the exchanger
-acting blocking That first frost the preheater is switched on
and the temperature rises over the set value switched off.
If the preheater resistor power It is not enough, and the exhaust air
temperature drops less than a "waste of cold air" limit-value power
supply fan stepwise dropped until the threshold is reached.
SERVICE MENU
INTRODUCTION OF THE AHU CONTROL PANEL
Settings are applied via the service menu
SETTINGS
NOTE! SWIPE RIGHT AT THE TOP OF THE SCREEN
Touch screen buttons:
Boosting
Fireplace switch
(pressure compensation)
Out-of-house mode
Fan speed adjustment 1....5
The button can be used to browse
the menu upwards and change settings.
The button can be used to browse
the menu downwards and change setting value.
Return to the previous or main menu.
THE SUMMER BYPASS OF THE HEAT RECOVERY UNIT MUST BE IN THE WINTER POSITION WHEN THE
AIRFLOWS ARE BEING ADJUSTED.