10
SPACE DISTRIBUTION UNIT, EXTERNAL ABSORPTION (SDU-E)
Rise, throw and spread (SDU-E)
As steam is discharged from the humidifier, it
quickly cools and turns to a visible fog that is lighter
than air. As this fog is carried away from the
humidifier by the airstream, it tends to rise toward
the ceiling. If this fog contacts solid surfaces
(columns, beams, ceiling, pipes, etc.) before it
disappears, it could collect and drip as water. The
greater the space relative humidity, the more the
fog will rise, throw and spread before disappearing.
The distances the fog travels before it disappears
are given in Table 10-1.
Table 10-1: SDU-E Visible vapor travel
Table 10-1 notes:
Table 10-1 states the vertical (rise), horizontal
(throw) and width (spread) dimensions that can be
expected with the HUMIDI-TECH with SDU-E.
Surfaces cooler than ambient temperature, or
objects directly in the path of visible vapor dis-
charge, may cause condensation and dripping.
Rise: Maximum height visible vapor rises above the
steam outlet grill of the SDU-E.
Throw: Maximum horizontal distance visible vapor
travels from the steam outlet of the SDU-E.
Spread: Maximum width visible vapor spreads out
from the steam outlet of the SDU-E.
Model
40% RH@ 21°C 50% RH@ 21°C 60% RH@ 21°C
Rise
(m)
Throw
(m)
Spread
(m)
Rise
(m)
Throw
(m)
Spread
(m)
Rise
(m)
Throw
(m)
Spread
(m)
VM-4 0.30 1.5 0.30 0.50 2.0 0.50 .80 2.3 0.80
VM-6 0.30 1.5 0.30 0.50 2.0 0.50 .80 2.3 0.80
VM-8 0.30 1.7 0.30 0.50 2.0 0.50 .80 2.3 0.80
VM-10 0.50 1.8 0.50 0.60 2.1 0.60 1.0 2.5 1.0
VM-12 0.50 1.8 0.50 0.60 2.1 0.60 1.0 2.5 1.0
VM-16 0.60 2.1 0.60 0.60 2.1 0.60 1.0 2.7 1.0
VM-21 0.60 2.3 0.60 0.60 3.0 0.60 1.0 3.7 1.0
VM-25 0.60 2.5 0.60 0.80 3.2 0.80 1.1 3.8 1.1
VM-30 0.60 2.5 0.60 0.80 3.2 0.80 1.1 3.8 1.1
VM-34 0.60 2.5 0.60 0.80 3.2 0.80 1.1 3.8 1.1
Table 10-1 lists the recommended minimum vertical
(rise), horizontal (throw) and width (spread) clear-
ances for SDU-E area-type humidifiers at 40%, 50%
and 60% RH in the space.
The SDU-E contains a 926 cmh blower
(m3/h) and an airflow proving switch field wired to the
HUMIDI-TECH humidifier electrical panel. A wiring
diagram of the SDU-E is included with the unit.
On a call for humidity, the humidifier will begin
producing steam and the start relay will energize the
SDU blower. Time-delay is controlled by the
VAPOR-LOGIC®
3microprocessor.
VM99-C-0400-M-0801.pdf 10 11/19/2009 9:51:54 AM