
E93.9950EN CB Cascade manual 3
Table of Contents
1. INTRODUCTION........................................................................................................................................4
2. INSTALLATION PROCEDURE CASCADE CONFIGURATION..............................................................5
3. DETERMINE POWER REQUIRED FOR THE CASCADE CONFIGURATION........................................6
4. CALCULATE DIMENSIONS AND SPACE OF CASCADE CONFIGURATION ......................................8
5. EXPLANATION OF PARTS AND GROUPS ..........................................................................................11
6. CONNECTING SETS ..............................................................................................................................12
7. HYDRAULIC AND GAS HEADER GROUP............................................................................................13
7.1 Headers...........................................................................................................................................13
7.2 Support beam and support brackets...............................................................................................13
7.3 Headers and connecting sets..........................................................................................................14
8. MOUNTING THE FRAME .......................................................................................................................15
8.1 Frame elements ..............................................................................................................................15
8.2 Procedure for mounting the frame ..................................................................................................16
9. MOUNTING THE GAS HEADER............................................................................................................17
10. MOUNTING THE BOILERS ON THE FRAME........................................................................................18
11. MOUNTING THE HYDRAULIC GROUP AND THE CONNECTING SETS............................................19
12. MOUNTING THE LOW LOSS HEADERS ..............................................................................................20
13. DETERMINE MANAGING AND DEPENDING BOILERS ......................................................................21
14. COMPLETE THE MECHANICAL INSTALLATION................................................................................21
15. MOUNT THE FLUE GAS AND AIR SUPPLY SYSTEMS.......................................................................22
15.1 Individual flue systems....................................................................................................................22
15.2 Common flue system.......................................................................................................................22
16. SET PARAMETERS................................................................................................................................23
17. COMMISSIONING THE CASCADE CONFIGURATION ........................................................................23
18. ACCESSORIES.......................................................................................................................................24
19. REFERENCES.........................................................................................................................................24
19.1 List of figures...................................................................................................................................24
19.2 List of tables ....................................................................................................................................24
20. APPENDIX A – CASCADE PARTS........................................................................................................25