INSTALLATION INSTRUCTION
ecopower®EP900 Hybrid Ventilator
PRIOR TO INSTALLATION
• Checkallcomponentsareinthecarton.
• Itisadvisabletotesttheecopwerturbine,thiscanbedonebyconnectingittoapowersupply.
NOTE: A qualified electrician must do this.
METAL ROOF (CORRUGATED, KLIPLOCK, TRIM DECK, ETC) UNDER RIDGE INSTALLATION
CONTENTS OF PACKAGES - COMPLETE UNIT WITH VARIPITCH AND FLASHING
Turbine Varipitch Throat Flashing
Also:
Warranty
InstallationInstructions
NOTE: Theecopowerdoes
notincludeacontroldevice.
Fi g 2
Insert
screwinto
Varipitch
clip
Infill
Ridgeorapex
Bestpositionfor
weatherproofing
Fi g 3
Trimmers
Step 1
Selecttheappropriatepositionontheroofasreferredtoin(Fig2),ensuringtheventilatorwill
notbeshelteredfromthewind.Placethebaseflashingundertheridgecap.
Note:Whenselectingthepositionofthevent,themeansofweatherproofingneedstobe
takenintoaccount;themostefficientmeansistolocatetheflashingundertheridgecap.
Step 2
Ensurethattheflashingcoversthecorrugationsorribsequally,thenmarkacircleusingthe
flashingasatemplate.Cuthole.Oncetheholehasbeencut,turnupthecorrugationsorpans.
Note:Ifthepurlinspacingisgreaterthan1000mm,trimmersmayberequired.Installthe
trimmersbetweenthepurlinsoneithersideoftheopening(Fig2).Donotcovertheopening
(Fig3).
Securetheflashingtotheroof(fornumberoffastenersseeTable1).Iftrimmersareused
ensuretheflashingissecuredtothetrimmers.Itisrecommendedthataninfillbeusedonthe
lowsideoftheflashing.Coatallfastenerswithsiliconetoensuretheyareweatherproof.
Step 3
WhenaVaripitchthroatisbeingused,sittheVaripitchontheflashingandrotatethetopand
bottomhalvesuntilthetopoftheVaripitchislevel(horizontal);itisrecommendedthatalevel
beused(Fig3).FixtheVaripitchtotheflashing(fornumberoffastenersseeTable1).
Handling
DuetotheweightoftheturbineitisrecommendedthattheecopowerEP900turbineisalways
liftedby2people.
Lifting
TheecopowerEP900turbineisfittedwithaliftpointlocatedunderthebracketassemblythat
allowstheunittobeliftedupsidedown(Fig1).Tolifttheecopowerusingacraneorsimilar
device,carefullyturntheturbineover*,attachthecranehookorslingtotheliftingpointand
carefullylifttheecopowerturbineintoposition.
*Caution: The dome can be easily scratched or dented.
WARNING: THE ECOPOWER EP900 TURBINE WEIGHS 30KG.
Fi g 1
WARNING: DO NOT ATTEMPT TO INSTALL UNIT WHEN POWER IS CONNECTED.
THE TURBINE WILL SPIN.