Eiri KY PIK-20 E User manual

PIK-20
E
Service
manual
SERVICE
MANUAL
for
SEL
LAUNCHING
SAILPLANE
PIK-20
E
V
EIRI
KY
J
Kisällinkatu
8
S
15170
Lahti
17


PIK-20
E
Service
manual
SERVICE
MANUAL
for
SEL
LAUNCHING
SAILPLANE
PIK-20
E
SERIAL
NO:
REGISTRATION:
This
sailplane
must
be
serviced
in
compliance
ith
this
Manual.
Approved
by
National
Board
of
Aviation,
Finland
V
eiri
ky
--------------------------
Kisällinkatu
8
S -15170
Lahti
17
page
i
EDITION
2
JANUARY
80
ENGLISH

PIK-20
E
Service
manual
A
LOG
OF
REVISIONS
Any
revision
of
the
present
Manual
must
be
recorded
in
the
follo ing
table.
The
ne
amended
text
in
the
revised
page
ill
be
indicated
by
a
Dlack
vertical
line
in
the
left
hand
margin
and
the
Revision
No.
and
date
ill
be
sho n
on
the
bottom
of
the
page.
Rev
No.
Revised
Pages
Description
of
Revision
Date
Signed
Edition
2
All
pages
Ne
Edition
(Replaces
previous
edition
dated
Nov.
1978)
Rev
1
II
8,
11
-9
Ne
fuel
tank.
S/N:s
20215,
20221
and
up
Jan
80
EIRI
Rev
2
II-7
Assembly
of
starter
emergency
relay
S/N:s
20213,
20214,
20217
and
up
Jan
80
EIRI
Rev
3
11-10
Change
in
ater
tank
volyme
S/N:s
20247
and
up
Jan
80
EIRI
Rev
4
11-31
Revised
control
surfaces
balancing
instructions.
S/N:s
20257
and
up.
Mar
80
EIRI
EIRI
KY
----------
------------------------------
V
Kisällinkatu
8
S -15170
Lahti
17
page
n

PIK-20
E
Service
manual
>v
II
SERVICE
MANUAL
Page
TABLE
OF
CONTENTS
1.
ASSEMBLY
AND
DISASSEMBLY
11-1
1.1
Preparation
II-
1
1.2
Wing
assembly
II-
3
1.3
Tailplane
assembly
II-
3
1.4
Disassembly
II-
4
2.
SYSTEM
DESCRIPTION
II-
5
2.1
Po erplant
II-
5
2.2
Electrical
system
II-
6
2.3
Fuel
system
II-
8
2.4
Water
ballast
11-10
3.
DAILY
CHECK
11-11
4.
CARE
AND
MAINTENANCE
IM2
4.1
General
care
H-12
4.2
Po erplant
maintenance
11-13
4.3 Sailplane
maintenance
h-26
4.4
After
gear-up
landing
and
after
rough
landing
II-30
4.5
Balancing
of
control
surfaces
H-30
5.
WEIGHT
AND
BALANCE
II-32
5.1
General
H-32
5.2
Weighing
procedure
H-32
5.3
Calculations
for
actual
empty
eight
and
moment
II-35
5.4
Calculations
for
minimum
and
maximum
pilot
eight
II-35
5.5
Sample
Problem:
Actual
empty
eight
and
moment
of
the
sailplane
II-36
6.
TRANSPORTATION
OF
THE
SAILPLANE
AND
HANDLING
ON
THE
GROUND
II-38
6.1
Transportation
II-38
6.2
Handling
on
the
ground
II-38
EIRI
KY
---------------------------------------------------------
'
Kisällinkatu
8
S -15170
Lahti
17
page
iii

PIK-20
E
Service
manual
7.
EQUIPMENT
11-39
V
eiri
ky
y
Kisällinkatu
8
SM5170
Lahti
17
page
iv

PIK-20
E
Service
manual
1.
ASSEMBLY
AND
DISASSEMBLY
1.1
Preparation
Three
or
even
t o
persons
can
easily
assemble
and
disassemble
the
PIK-20
E.
Before
assembly
prepare
the
ing
assembly
tool,
clean
clot
hes,
grease
of
mineral
or
synthetic
basis.
Clean
and
grease
all
fitting
sur
faces,
bolts,
pins
and
control
system
connections.
EIRI
KY
Kisällinkatu
8
S -15170
Lahti
17
page
11-1

PIK-20
E
Service
manual
-\
Fig
2
EIRI
KY
J
Kisällinkatu
8
S -15170
Lahti
17
page
II-2

PIK-20
E
Service
manual
'X
1.2.
Wing
assembly
( igure
2)
—
Insert
the
right-hand
ing
ensuring
that
the
ing
bevel
pins
(1)
and
(2)
are
in
the
seats
(4)
and
(5)
in
the
fuselage.
—
Insert
the
left-hand
ing
in
the
same
ay
and
atch
that
the
bevel
pins
(6)
and
(7)
go
correctly
into
their
seats.
Dra
the
ings
together
ith
the
ing
assembly
tool
and
install
the
main
ing
pin
and
secure
it
using
a
Fokker-pin.
It
is
necessary
to
lift
the
ing
tips
hen
using
the
assembly
tool.
—
Connect
the
flap
and
airbrake
control
rods
ith
quick
release
locks
and
secure
them
ith
Fokker
pins.
—
Connect
the
ater
ballast
hoses
to
the
fuselage.
—
Install
the
venturi
tube.
1.3.
Tailplane
assembly
( ig
3)
EIRI
KY
------------------------
Kisällinkatu
8
S -15170
Lahti
17
page
II-3

PIK-20
E
Service
manual
A
—
Insert
the
horizontal
stabilizer
by
moving
the
trim
and
flap
lever
to
the
foremost
position
and
by
lifting
the
leading
edge
up
a
little
and
by
pushing
the
ball
bearings
(1)
and
(2)
on
to
the
pins
(3)
and
(4)
on
the
vertical
stabilizer.
—
Pull
out
the
locking
pin
(5)
ith
a
tool
(Fokker-pin
of
the
ing
bolt)
and
push
the
leading
edge
into
place.
Remove
the
tool
and
push
the
locking
pin
in.
Ensure
that
the
front
fitting
is
engaged
and
secure
the
pin
using
a
Fokker-pin.
—
Deflect
the
elevator
up ards
and
connect
the
elevator
control
rod
(6)
and
secure
it
using
a
Fokker-pin.
1.4.
Disassembly
—
The
ings
and
horizontal
stabilizer
are
removed
in
the
reverse
sequence
to
assembly.
EIRI
KY
y
Kisällinkatu
8
S -15170
Lahti
17
page
II-4

PIK-20
E
Service
manual
A
2.
SYSTEM
DESCRIPTION
2.1
Powerplant
Engine
description:
Type:
Rotax
501
T o-cylinders
in
line
t o-cycles
Otto
engine
Air
cooled
Oil
mixed
to
fuel
lubrication
Single
magneto
ignition
Propeller
driven
ith
a
toothed
belt
reduction
2:1
Electric
starter
Alternator
Fuel
pump
ith
impulse
drive
Engine
technical
data:
Bore
2
x
72
mm
Stroke
61
mm
Displacement
496.7
cm
3
Compression
ratio
10.8
(10.3-11.3)
Ignition
system
Bosch-Magneto-Generator,
SCP2,
12
V,
140
Watt
alternator
Contact
breaker
gap
0.35
—
0.45
mm
Ignition
timing
2.07
mm
±
0.25,
19°
BTC
Spark
plugs
NGK
B8ES,
Champion
N3
Spark
plug
gap
0.4
—
0.6
mm
Carburettors
Tillotson
Membrane
carburettor
HR
Main
nozzle
Gr.
0.046
Direction
of
rotation
Counter
clock ise
facing
the
engine
drive
shaft
Starter
Geared
starter
Fuel
Min
96
octane
(RON)
Super
gasoline
or
Aviation
gasoline
100LL,
t ostroke
mix
Lubrication
Oil
mixed
to
fuel
lubrication,
mixing
ratio
1:40
ith
Super
t ostroke
oil
Weight
With
muffler
and
electric
starter
33,5
kg
EIRI
KY
-------
■
•
Kisällinkatu
8
S -15170
Lahti
17
page
II-5

PIK-20
E
Service
manual
A
Engine
operational
data:
Takeoff
po er
Max
continuous
po er
75
%
max
cont.
po er
75
%
max
cont.
po er
Max
continuous
rotational
speed
Max
rotational
speed
31.7
kW/43
hp/6200
rpm/100
km/h
29.4
kW/40
hp/6000
rpm/100
km/h
22.1
kW/30
hp/5500
rpm/100
km/h
22.1
kW/30
hp/6000
rpm/135km/h
6000
rpm
6800
rpm
appr.
2000
rpm
Idling
rotational
speed
Cylinder
head
temperature
Thermoring
under
spark
plug,
max
250°C
allo ed
100
%
po er:
appr.
22,4
l/h
75
%
po er:
appr.
17,2
l/h
Fuel
consumption
Propeller:
Propeller
model
Propeller
diameter
Propeller
type
1.
HO
11
#
127B
87
2.
EP
P127/87
1270
mm
T o-blade,
ooden,
fixed
pitch
2.2
Electrical
system
The
12-volt
electrical
system
includes
a
12-volt
battery
for
starting
and
use
during
soaring.
The
engine
has
an
alternator
in
connection
ith
the
magneto.
The
current
is
rectified
and
regulated
by
a
Tympanium-type
rectifier,
attached
to
the
propeller
axle.
The
electric
starter
has
0.4
hp
and
is
geared
type.
The
electric
fuel
pump
is
a
solid
state
type.
Electrical
s itches
are
located
on
the
left
side
of
the
instrument
panel
and
the
fuses
are
belo
the
s itches.
The
main
s itch
operates
the
main
contactor
hich
is
located
near
the
battery
in
the
engine
com
partment
or
belo
the
instrument
panel.
The
starter
knob
operates
the
starter
contactor,
hich
is
situated
be
side
the
main
contactor.
The
ground
terminals
of
the
electric
fuel
pump
and
the
starter
contac
tor
are
connected
to
the
ground
over
a
micros itch.
The
engine
positi
on
operates
the
micros itch
and
the
s itch
is
connected
only
hen
the
engine
is
fully
extended.
EIRI
KY
---------
-------
-----------------------------------
y
Kisällinkatu
8
S
15170
Lahti
17
page
11-6

/
-PIK-20
E
Service
manual
FIG
2.1:
ELECTRICAL
SYSTEM
V.
EIRI
KY
-------
Kisällinkatu
8
S -15170
Lahti
17
page
II-7
Revision
2.21.8.-79

PIK-20
E
Service
manual
The
engine
hourmeter
and
an
optional
barograph
are
operated
directly
by
the
alternator.
They
cannot
be
s itched
off
and
are
only
operating
hen
the
engine
is
running.
The
ignition
s itch
is
a
dual
s itch
and
beside
of
the
function
as
an
ignition
shut
off,
it
operates
the
tachometer
and
the
fuel
quantity
gau
ge.
The
ignition
line
is
also
connected
to
the
micros itch
and
the
ignition
is
shut
off
hen
the
engine
is
not
fully
extended.
The
condition
of
the
batte
r
y
and
the
function
of
the
alternator
can
be
checked
by
the
voltage
meter.
The
line
bet een
the
red
and
black
area
corresponds
to
12
volts.
2.3
uel
system
|
The
fuel
capacity
is
29
litres,
of
hich
28
litres
are
usable.
The
fuel
tank
is
situated
behind
the
backrest.
Filler
opening
is
on
the
fuselage
bet een
the
canopy
frame
and
the
ing:
The
fuel
valve
is
situated
on
the
tank.
The
fuel
quantity
can
be
checked
from
the
electrical
quantity
gauge.
The
fuel
tank
vent,
in
the
cap,
should
be
inspected
daily
prior
to
first
flight
that
it
is
free
from
obstruction.
To
avoid
accumulation
of
the
a
ter
and
sediment,
the
fuel
in
the
tank
should
be
examined
daily
prior
to
first
flight
and
after
refueling,
by
using
the
sampler
cup
provided
to
drain
fuel
from
the
tank.
The
drain
valve
is
situated
on
the
left
fuselage
side.
The
fuel
filter
is
an
inline
paper
filter
type
ith
16
#jm
filtration
(0.6
microin)
and
nominal
capacity
60
l/h
(e.g.
Purolator
00610).
The
filter
is
in
the
baggage
compartment
after
the
fuel
cock.
The
filter
should
be
changed
every
25
hours
or
yearly.
The
auxiliary
electric
fuel
pump
is
a
solid
state
type
and
situated
do n
in
the
engine
compartment.
The
primary
pump
is
an
engine
driven
impulse
type.
The
carburettors
are
provided
ith
a
return
line
to
avoid
airbubbles
in
the
fuel
feed.
Inspect
and
clean
the
tank
carefully
every
year.
EIRI
KY
-
Kisällinkatu
8
S -15170
Lahti
17
page
II-8
Revision
1.21.8-79

PIK-20
E
Service
manual
A
FIG
2.2:
FUEL
SYSTEM
Carburettors
Fuel
return
line
Engine
fuel
pump
Fuel
pump
Fuel
filter
Fuel
cock
sps
Filler
opening
ith
vent
cap
Fuel
quantity
gauge
Fuel
feed
line
Fuel
tank
Electric
fuel
pump
f
Finger
strainer
EIRI
KY
y
Kisällinkatu
8
S
15170
Lahti
17
page
II-9
Revision
1.21.8-79

PIK-20
E
Service
manual
2.4
Water
ballast
The
ater
ballast
is
a
four
meter
long
nylon
reinforced
plastic
bag
in
both
ings,
fore
of
the
main
spar.
The
capacity
of
one
bag
is
40
litres
gi
ving
a
total
capacity
of
80
litres.
The
tanks
are
filled
through
the
drai
ning
hole
on
the
underside
of
fuselage.
The
ater
ballast
valve
is
opera
ted
by
a
cable.
The
operating
knob
is
on
the
left
side
auxiliary
panel
in
the
cockpit.
Filling
instructions:
1.
Install
the
2
—
4
m
long
filling
tube
ith
threaded
filling
connector
into
the
outlet
hole.
2.
Keep
the
ing
in
level.
Open
the
ballast
valve
and
fill
the
system
through
a
funnel.
Note
1:
1
m
is
the
maximum
filling
height
(distance
from
the
funnel
to
the
ing).
Higher
pressure
than
this,
0.1
BAR
(0.1
kp/cm
2
),
can
cause
serious
damages
to
the
ing.
No
pressurized
filling
system
is
allo ed.
3.
When
filled,
check
the
equal
amounts
( ings
stay
level).
4.
If
the
amounts
are
not
equal,
then
keep
the
valve
open
and
lift
the
heavier
ing
and
ait
for
the
ater
to
flo .
Check,
if
the
ings
are
not
yet
in
balance,
then
shake
the
ing,
having
the
lightest
tip
do n.
5.
If
the
balance
is
not
achieved
then
you
have
to
put
the
lightest
tip
do n
and
let
the
ater
flo
out
through
the
filling
hose.
6.
When
the
amounts
are
equal,
shut
the
valve
and
remove
the
filling
hose.
Note
2:
When
maximum
amount
of
ater
is
needed
it
is
recommen
ded
before
filling
to
suck
all
the
air
from
the
system
through
the
fil
ling
hose
(e.g.
ith
a
vacuum
cleaner).
EIRI
KY
y
Kisällinkatu
8
S -15170
Lahti
17
Revision
3.21.1-80
page
11-10

PIK-20
E
Service
manual
3.
DAILY
CHECK
After
the
sailplane
has
been
rigged
and
before
the
first
flight
of
the
day
the
daily
check
must
be
done.
The
check
list
and
checking
procedures
are
given
in
the
Flight
Manual:
Normal
procedures
(5.1,
5.51.
It
is
important
that
the
daily
check
is
properly
done.
It
is
possible
that
some
defect
has
not
been
noticed
during
the
monthly
check
or
some
thing
has
appered
during
the
previous
flights.
Especially
after
rigging
it
is
important
to
check
that
all
quick
release
locks
are
properly
connected
and
secured.
It
is
best
to
sign
the
assemb
ly
in
the
log
book.
Cracks
in
paint
may
be
marks
of
defects
in
the
structure
and
all
at
tachments
should
be
checked
carefully.
The
po erplant
ith
retracting
mechanisms
should
also
be
checked
for
cracks
and
loose
bolts
and
ear.
EIRI
KY
J
Kisällinkatu
8
S -15170
Lahti
17
page
11-11

PIK-20
E
Service
manual
4.
CARE
AND
MAINTENANCE
4.1
General
care
The
outside
of
the
sailplane
can
be
kept
bright
and
smooth
simply
by
ashing
ith
ater
and
mild
soap.
Avoid
abrasive
or
harsh
detergents.
Rinse
ith
clean
ater
and
dry
ith
terry-cloth
to els
or
a
chamois.
It
is
al ays
best
to
keep
a
good
ax
layer
on
the
paint
to
protect
the
surface
from
humidity
and
dirt
and
also
to
minimize
the
"bug"
building
on
the
leading
edges
during
flight.
A
hole
plane
polish
once
a
year
is
recommended
ith
car
polishing
agent
or
solid
polishing
ax
for
acrylic
or
plastic
ith
polishing
machine
(be
careful
of
overheating
the
surface).
When
gliding
in
rain
the
performance
of
the
sailplane
is
better
if
ax
is
removed.
The
ax
can
be
removed
ith
axremover
(car
motor
de
tergent)
or
by
sanding
paper
number
600,
until
the
glossy
finish
of
the
ings
is
removed.
Surface
tension
lo ering
agents
as
dish
ashing
detergent
can
be
used
on
the
ing
surfaces.
Use
thin
layer
and
polish
it
ith
dry
cloth.
The
canopy
surface
may
be
cleaned
according
to
the
follo ing
inst
ructions:
1.
Use
plenty
of
ater
to
rinse
the
canopy
surface.
2.
Wash
the
acrylic
sheet
ith
dish
ashing
detergent
or
mild
soap
a
ter.
Use
a
sponge
in
spreading
the
soap ater.
Do
not
rub
because
dirt
scratches
the
acrylic
sheet.
3.
Grease
and
oil
spots
can
be
removed
ith
kerosene
and
a
soft
cloth.
4.
Never
clean
ith
a
dry
cloth.
Note:
Never
use
gasoline,
benzine,
alcohol,
acetone,
carbon
tetrachlori
de,
lacquer
thinner
of
glass
cleaner
to
clean
the
plexiglass.
EIRI
ky
---------
-
-----------------
J
Kisällinkatu
8
S -15170
Lahti
17
page
11-12

PIK-20
E
Service
manual
"\
In
hot
sunshine
it
is
recommended
that
the
sailplane
is
protected
ith
a
light
coloured
covering.
Prior
to
hangaring,
ater
drain
holes,
sho n
in
Figure
6,
should
be
inspected
for
free
outlets
and
cleaned
if
necessary.
When
storing
the
sailplane
in
a
trailer
it
is
important
to
see
that
there
is
no
ater
laying
in
the
trailer.
Felt
on
fuselage
and
ing
holders
should
be
dry.
There
must
be
ventilation
holes
in
the
trailer.
When
storing
the
sailplane
for
longer
periods,
it
is
good
to
use
silica-
gel
in
the
trailer
and
tape
the
trailer
airtight
to
keep
the
air
dry.
It
should
also
be
checked
that
there
is
no
ater
in
the
ing.
The
ater
bags
should
be
drained
carefully
and
the
sealings
should
be
removed
from
the
ing
rib
to
get
the
air
to
circulate.
All
bare
metal
parts
should
be
protected
ith
grease.
4.2
Powerplant
maintenance
4.2.1
General
The
inspection
and
maintenance
of
the
po erplant
and
po erplant
sys
tem
depend
on
the
engine
hours.
Safe
operation
can
be
achieved
only
by
follo ing
the
maintenance
instructions
given
in
this
Manual.
Mainte
nance
periods
are
25
and
50
hours
(see
4.2.2:
Po erplant
Maintenance
and
Inspection
Lists).
The
spark
plugs
must
be
changed
t ice
during
the
25
hours
mainte
nance
period.
The
maximum
allo ed
spark
plug
life
is
15
hours.
If
the
engine
use
is
little,
at
least
the
50
hours
maintenance
must
be
done
yearly.
Major
overhaul
period
is
300
hours.
This
overhaul
is
made
by
the
engi
ne
manufacturer
or
by
a
manufacturer
authorized
orkshop.
In
connection
ith
an
engine
maintenance
at
least
the
monthly
check
is
recommended
to
be
done
to
the
sailplane.
The
maintenance
must
be
done
by
a
person
ho
at
least
has
sufficient
experience
of
automobile
or
t o-stroke
engine
maintenance
ork.
EIRI
KY
V
Kisällinkatu
8
S -15170
Lahti
17
page
11-13

PIK-20
E
Service
manual
A
4.2.2
Inspection
guide
lines
a)
MOVABLE
PARTS
for
lubrication,
servicing,
security
of
attachment,
binding,
exessive
ear,
safetying,
proper
operation,
proper
adjust
ment,
correct
travel,
cracked
fittings,
security
of
hinges,
defective
bearings,
cleanliness,
corrosion,
deformation,
sealing
and
tension.
b)
FLUID
LINES
AND
HOSES
for:
leaks,
cracks,
dents,
kinks,
chafing,
proper
radius,
security,
corrosion,
deterioration,
obstruction
and
fo
reign
matter.
c)
METAL
PARTS
for:
security
of
attachment,
cracks,
metal
distortion,
broken
spot elds,
corrosion,
condition
of
paint
and
any
other
appa
rent
damage.
d)
WIRING
for:
security,
chafing,
burning,
defective
insulation,
loose
or
broken
terminals,
heat
deterioration
and
corroded
terminals.
e)
BOLTS
IN
CRITICAL
AREAS
for:
correct
torque
in
accordance
ith
torque
values
given
in
4.2.5,
hen
installed
or
hen
visual
inspection
indicates
the
need
for
a
torque
check.
EIRI
KY
Kisällinkatu
8
S -15170
Lahti
17
page
II
14
Other manuals for PIK-20 E
1
Table of contents
Other Eiri KY Aircraft manuals