manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. ekwb
  6. •
  7. Cooling Box
  8. •
  9. ekwb EK-FB R3Gene Manual

ekwb EK-FB R3Gene Manual

Other ekwb Cooling Box manuals

ekwb EK-Supreme HF Cu Manual

ekwb

ekwb EK-Supreme HF Cu Manual

ekwb EK-PRO GPU RTX A6000 User manual

ekwb

ekwb EK-PRO GPU RTX A6000 User manual

Popular Cooling Box manuals by other brands

Quest Leisure Products Lakeland Coniston instructions

Quest Leisure Products

Quest Leisure Products Lakeland Coniston instructions

Keter COOL STOOL user manual

Keter

Keter COOL STOOL user manual

Dometic MOBILE COOLING TROPICOOL TC07 operating manual

Dometic

Dometic MOBILE COOLING TROPICOOL TC07 operating manual

GLAM haus GH2201E manual

GLAM haus

GLAM haus GH2201E manual

Mobicool MCG15 operating manual

Mobicool

Mobicool MCG15 operating manual

REMKO KNGcooling module installation instructions

REMKO

REMKO KNGcooling module installation instructions

Seifert 46122001 manual

Seifert

Seifert 46122001 manual

BOMANN KB 7245 instruction manual

BOMANN

BOMANN KB 7245 instruction manual

AEG KK 14 manual

AEG

AEG KK 14 manual

Crivit Outdoor E24-96288 translation of original operation manual

Crivit Outdoor

Crivit Outdoor E24-96288 translation of original operation manual

Waeco Cooly CX-18-12 instruction manual

Waeco

Waeco Cooly CX-18-12 instruction manual

Carrier TRANSICOLD CITIMAX 280 operating instructions

Carrier TRANSICOLD

Carrier TRANSICOLD CITIMAX 280 operating instructions

MESTIC Coolerbox MCC-35 Instructions for use

MESTIC

MESTIC Coolerbox MCC-35 Instructions for use

Orbit ArizonaMist quick start guide

Orbit

Orbit ArizonaMist quick start guide

Huawei NetCol8000-A Series Maintenance and troubleshooting

Huawei

Huawei NetCol8000-A Series Maintenance and troubleshooting

Black & Decker BDC24L-LA instruction manual

Black & Decker

Black & Decker BDC24L-LA instruction manual

HeroCamper C9 user manual

HeroCamper

HeroCamper C9 user manual

Dometic GROUP Waeco TropiCool TC-14FL-AC instruction manual

Dometic GROUP

Dometic GROUP Waeco TropiCool TC-14FL-AC instruction manual

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.

This product is intended for installation only by expert users. Please consult with a qualified technician for installation. Improper installation may result in damage to your equipment. EK Water Blocks assumes no liability
whatsoever, expressed or implied, for the use of these products, nor their installation. The following instructions are subject to change without notice. Please visit our web site at www.ekwaterblocks.com for updates.
Before installation of this product please read important notice, disclosure and warranty conditions printed on the back of the box or in manual..
The barb hose fittings require only a small amount of force to screw them in; otherwise the high flow fittings might break. These fittings do not need to be tightened with much force because the
liquid seal is made using o-rings.
STEP 1: GENERAL INFORMATION Sam
p
le
p
hoto of ASUS RAMPAGE III GENE PCB desi
g
n
STEP 2: PREPARING YOUR MOTHERBOARD
1. REMOVING STOCK COOLER. Remove all encircled screws. All stock
cooler assembly screws should be removed. There are 2 screws on the back of
the motherboard and 2 on top of mosfet stock cooler.
2. CLEANING THE PCB. Carefully detach the original stock cooler after removing all screws
securing it to the board. Wipe off the remains (by using non–abrasive cloth or qtip, as shown
on sample photo) of the original thermal compound until the components and circuit board are
completely clean. EKWB does not recommend using any liquids for removing paste.
3. APPLYING THERMAL COMPOUND
Apply thermal compound: put a small drop of thermal compound on the
Northbridge. For example Céramique™ thermal compound. Follow this link
http://www.arctic-
cooling.com/catalog/product_info.php?cPath=39_&mID=127&language=en for
detailed instructions. EKWB recommends non-conductive MX-2, which should
be applied in cross form for best performance (see sample picture).
4. CUTTING THERMAL PADS. One thermal pads (90x15x1 mm) and one thermal pad
(60x25x0,5 mm) are enclosed with your water block. (WARNING: DIMENSIONS ON PICTURES
BELLOW ARE SCALED!)
5. PLACING THERMAL PADS ON MOTHERBOARD. Place thermal pads you cut on PCB as shown on picture bellow.
(PLEASE REMOVE FOIL OF THERMAL PADS PRIOR TO INSTALLATION.)
Installation and mounting manual for EK-FB R3Gene water block:
Alldisclosures,noticesandwarrantyconditionsarebeingwrittenonthebackofthebox. Releasedon28thofSeptember,2010.
Northbridge
Mosfets
CPUsocket
Place thermal pads (1mm thick) here and
make sure all mosfet chips are covered.
Southbridge
Apply small amount of thermal grease
here.
STEP 3: PREPARING YOUR WATER BLOCK
1. ATTACHING STANDOFFS. Apply small amount of thermal grease around mounting
holes and place acetal standoffs (thickness 2,5 mm) so the holes are concentric.
Thermal paste provides enough adhesive force for standoffs to stay in a place.
2. PLACING BLOCK OVER GPU. Place the motherboard on the inverted water block or
vice versa and attach it with enclosed screws as shown in step 4. Make sure that
mounting holes are aligned.
STEP 4: ATTACHING BLOCK TO MOTHERBOARD STEP 5: ATTACHING BACKPLATE TO MOTHERBOARD
1. MOUNTING THE BLOCK.
Tightening the screws beginning around northbridge (please use
washers). Do not use too much pressure
on screws, because
motherboard might
bend and either cause bad contact with water
block, or break a connection on the board. Afterwards attach two
standoffs (2,1mm thick) around mosfet area and place thermal pads on
chips.
Use M3x12 DIN965 screws in order to attach backplate to motherboard. Screws go
into full board block. Backplate provides better contact along mosfet chips, thus block
performs better.

6. POSITIONING FITTINGS AND CONNECTING TO WATER CIRCUIT
Attach the liquid cooling tubes and connect the water-block(s) into the cooling circuit. EKWB recommends using high flow fittings with the EK-FB R3Gene series water blocks. To
ensure that the tubes are securely attached to the barb/fittings, please use hose clamps or an appropriate substitute. The use of an algaecide is always recommended for any
liquid cooling system.
You can use any hole as an inlet/outlet hole.
STEP 7: CHECKING FOR CONTACTS
Temporarily r
emove the water block to check for uniform surface contact between the block and the components. Note the pattern of contact on a piece of paper. Then repeat
steps 3 and 5 to reattach the block applying more or less pressure to the areas where you have found it necessary. Also please note that warranty label on copper side of
block doesn’t void warranty on material if removed. It is simply a proof that block has been leak tested.
Nonetheless EKWB highly recommends 24 hour leak test prior powering up system!
REQUIRED TOOLS AND MOUNTING SCREWS:
scissors philips screwdriver 2 screws M3x8 DIN7985 2 screws M3x12 DIN965 
M3x12 DIN965
Place thermal pad (0,5mm thick) in
order to cover all marked chips.
Alldisclosures,noticesandwarrantyconditionsarebeingwrittenonthebackofthebox. Releasedon28thofSeptember,2010.
2,1 mm standoffs
M3x8 screw
Washer
Fitting/barb