Exinda 4062 Series Manual

www.exinda.com 1-877-439-4632 Follow us @exinda
Hardware Installation Guide
Exinda Network Orchestrator
Network Orchestrator
4062 Series

Network Orchestrator 4062 Series Hardware Installation Guide 2
Section 1 Safety Notice and Warnings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Section 2 Ratings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Section 3 Electrical and General Safety Guidelines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
Section 4 Site Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
Section 5 Unpacking the Appliance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
Section 6A Installing the Appliance in a 4-Post Rack . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
Section 6B Installing the Appliance in a 2-Post Rack . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
Section 7 Rear Panel Connections and Cabling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
Section 8 Front Panel Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
Table of Contents

Network Orchestrator 4062 Series Hardware Installation Guide 3
1. Safety Notice and Warnings
2. Ratings
FCC Notice
This device complies with part 15 of the FCC Rules. Operation is subject to the following two conditions:
1. This device may not cause harmful interference.
2. This device must accept any interference received, including interference that may cause undesired operation.
No Telecommunications Network Voltage (TNV)-connected PCBs shall be installed.
CAN ICES-3 (A)/NMB-3(A)
CE Mark Warning
This is a Class A product. In a domestic environment, this product may cause radio interference, in which case
the user may be required to take adequate measures.
VCCI Warning
This is a product of VCCI Class A Compliance.
Environmental Warning
Perchlorate Material - special handling may apply. See www.dtsc.ca.gov/hazardouswaste/perchlorate.
This notice is required by California Code of Regulations, Title 22, Division 4.5, Chapter 33: Best Management
Practices for Perchlorate Materials. This product/part includes a battery that contains perchlorate material.
V: 100 - 240 VAC (auto-range)
Hz: 50 - 60
A: 2.6 Max

Network Orchestrator 4062 Series Hardware Installation Guide 4
3. Electrical and General Safety Guidelines
CAUTION
This appliance is intended for installation in restricted areas only. Initial setup and maintenance
should be performed by qualied personnel.
CAUTION
Power down the appliance following the operating system’s proper power down procedure using the
power button on the front panel. Unplug the AC power cord before servicing.
CAUTION
To avoid electrical shock, check the power cords as follows:
• This product is to be installed in Restricted Access Location only.
•Use the exact type of power cords required.
•Use power cord(s) that came with safety certications.
•Power cord(s) must comply with AC voltage requirements in your region.
•The power cord plug cap must have an electrical current rating that is at least 125% of the electrical
current rating of this product.
•The power cord plug cap that plugs into the AC receptacle on the power supply must be an IEC 320,
sheet C13,type female connector.
•Plug the power cord(s) into a socket that is properly grounded before turning on the power.
CAUTION
Required operating conditions for the appliance are -
•Temperature: 10 to 35oC (50 to 95oF).
•Humidity, non-condensing: 8 to 90%.
DISPOSING OF BATTERY BACKUP UNITS -IF APPLICABLE
WARNING
If the BBU is damaged in any way, toxic chemicals may be released.
The material in the battery pack contains heavy metals that can contaminate the environment. Federal, state,
and local regulations prohibit the disposal of rechargeable batteries in public landlls. Be sure to recycle the
old battery packs properly. Comply with all applicable battery disposal and hazardous material handling laws
and regulations in the country or other jurisdiction where you are using the BBU.
WARNING
Risk of explosion if the battery is installed upside down or is replaced by an incorrect type.
Replace it only with the same or equivalent type recommended by the manufacturer. Dispose of used
batteries according to the instructions.

Network Orchestrator 4062 Series Hardware Installation Guide 5
3. Electrical and General Safety Guidelines (continued)
WARNING
Disconnect the power supply at the circuit breaker before accessing any components. Turning othe system
power supply switch does not reduce the risk of electrical shock from the power supply terminal block.
CAUTION
•To prevent the unit from overheating, never install the appliance in an enclosed area that is not properly
ventilated or cooled. For proper airow, keep the front and back sides of the appliance clear of obstructions
and away from the exhaust of other equipment.
•Be aware of the locations of the power switches on the chassis and in the room, so you can disconnect
the power supply if an accident occurs.
•Take extra precautionary measures when working with high voltage components. Do not work alone.
•Before removing or installing main system components, be sure to disconnect the power rst. Turn o
the system before you disconnect the power supply.
•Use only one hand when working with powered-on electrical equipment to avoid possible electrical shock.
•Use rubber mats specically designed as electrical insulators when working with computer systems.
•The power supply or power cord must include a grounding plug and must be plugged into grounded outlets.
CAUTION
Electric Static Discharge (ESD) can damage electronic components. To prevent damage to your system board,
it is important to handle it very carefully. The following measures can prevent ESD damage to critical components.
•Use a grounded wrist strap designed to prevent static discharge.
•Keep all components and printed circuit boards (PCBs) in their antistatic bags until ready for use.
•Touch a grounded metal object before removing the board from the antistatic bag.
•Do not let components or PCBs come into contact with your clothing, which may retain a charge even if
you are wearing a wrist strap.
•Handle a board by its edges only; do not touch its components, peripheral chips, memory modules or contacts.
•When handling chips or modules, avoid touching their pins.
•Put the motherboard and peripherals back into their antistatic bags when not in use.
•For grounding purposes, make sure your computer chassis provides excellent conductivity between
the power supply, the case, the mounting fasteners and the motherboard.

Network Orchestrator 4062 Series Hardware Installation Guide 6
Before you begin:
Verify that the ship kit includes a power cord, the screws and the rack clips (shown below) that you will need
to install the appliance in your rack.
5. Unpacking the Appliance
NOTE: Use the hardware supplied with your specic rack if dierent from the hardware supplied in this kit.
Setup location, rack and appliance precautions
•Elevated Operating Ambient Temperature - If installed in a closed or multi-unit rack assembly, the operating
ambient temperature of the rack environment may be greater than room ambient temperature. Therefore, consideration
should be given to installing the equipment in an environment compatible with the maximum ambient temperature
(Tma) specied by the manufacturer.
Always keep the rack’s front door and all panels and components on the appliances closed when not servicing to
maintain proper cooling.
•Reduced Air Flow - Installation of the equipment in a rack should be such that the amount of air ow required for
safe operation of the equipment is not compromised. Leave enough clearance, approximately 25 inches in the front,
and 30 inches in the back of the rack to enable you to access appliance components and allow for sucient air ow.
•Mechanical Loading - Mounting of the equipment in the rack should be such that a hazardous condition is not
achieved due to uneven mechanical loading.
ALL RACKS MUST BE MOUNTED SECURELY. Ensure that all leveling jacks or stabilizers are properly attached to the
rack. If installing multiple appliances in a rack, make sure the overall loading for each branch circuit does not exceed
the rated capacity.
Do not slide more than one appliance out from the rack at a time. Extending more than one appliance at a time may
result in the rack becoming unstable. Install your appliance in the lower part of the rack because of its weight and
also for ease in accessing appliance components.
•Circuit Overloading - Consideration should be given to the connection of the equipment to the supply circuit and
the eect that overloading of the circuits might have on overcurrent protection and supply wiring. Appropriate
consideration of equipment nameplate ratings should be used when addressing this concern.
•Reliable Earthing - Reliable earthing of rack-mounted equipment should be maintained. Particular attention should
be given to supply connections other than direct connections to the branch circuit (e.g. use of power strips).
Install near appropriate AC outlets, and Ethernet hubs or individual jacks. Be sure to install an AC Power Disconnect
for the entire rack assembly. The Power Disconnect must be clearly marked. Ground the rack assembly properly to
avoid electrical shock.
4. Site Preparation
Front view Side view Front view Side view Rear view
Four (4) M6 x 16 mm
Phillips Pan Head Screws
4-POST RACK
Front view Side view Cone washer
2-POST RACK
Four (4) M5 x 12 Phillips Flat Head Screws
and Four (4) M5 x 12 Cone Washers
Four (4) Rack Clips

Network Orchestrator 4062 Series Hardware Installation Guide 7
Install two
rack clips in
the top and
bottom of
three holes
Leave
middle hole
empty
4-Post Rack
4-Post Rack
Two (2) M6 x 16 pan head screws
on each side*
Network Orchestrator
4062 Series
on each side
Two (2) M6 x 16 pan head screws
4-Post Rack
on each side
*
*
ead screws
eries
S
26
40
orchestrat
k Oror
w
Net
6A. Installing the Appliance in a 4-Post Rack
Step 1
•Install two rack clips into the top and
bottom of three holes on each side in
the rack as shown. The tabs on each
should be on the top and bottom to
help stabilize them in the holes. No
tools are needed to install the clips,
rmly press them into place
•Make sure the clips are level in height
on the left and right sides for proper
alignment to allow accurate appliance
installation.
Step 2
•Install the appliance in the rack as
shown. Insert one M6 x 16 screw*
through the top and bottom holes
in the ears into the rack clips on each
side of the rack.
•Tighten each screw to secure the
appliance in the rack.
NOTE: When installing (or removing)
the appliance from the rack make sure to
support the unit at all times.
*NOTE: Refer to your rack’s mounting
hardware for the proper size and type of
screws to secure the appliance in the rack.

Network Orchestrator 4062 Series Hardware Installation Guide 8
6B. Installing the Appliance in a 2-Post Rack
Two (2) M5 x 12 at head screws
and two cone washers on each side
2-Post Rack
*
Network Orchestrator
4062Series
and two cone washers on each side
Two (2) M5 x 12 at head screws
2
6
40
chestratk Or
or
w
wo
Net
2-Post Rack
*
Two (2) M5 x 12 at head screws
*
hside
eries
S
orchestrat
Step 1
•Install the appliance in the 2-post
rack as shown. Insert one M5 x 12
screw*and one M5 x 12 cone washer*
through the top and bottom holes
in the ears on each side into the
threaded holes in the rack.
•Tighten each screw to secure the
appliance in the rack.
*NOTE: Refer to your rack’s mounting
hardware for the proper size and type of
screws to secure the appliance in the rack.
NOTE: When installing (or removing)
the appliance from the rack make sure to
support the unit at all times.

Network Orchestrator 4062 Series Hardware Installation Guide 9
7. Rear Panel Connections and Cabling
MGT
L2
L4
L6
W2
W4
W6
A B C D E F G H
I J K L M
ABCDEFG H
AB
GT
L6W6
W4
W2
L4
L2
M
CDEFG
IJKLM
H
MGT
L2
L4
L6
W2
W4
W6
7
3
2
55
6
GT
L6
L4
L2
M
2
6
7
W6
W4
W2
35 5
Step 1: refer to the Quick Start Guide for more detailed instructions
Step 2: connect LAN port of rst bridge to the LAN side switch
Step 3: connect WAN port of the rst bridge to the WAN side router / rewall
Step 4: ensure trac ows from your LAN to your WAN while the appliance is oand the bridge is in bypass
Step 5: connect either a serial cable or a video cable and USB keyboard for system conguration
Step 6: connect the dedicated Management port to the LAN side switch
Step 7: connect the power cord and power on the device (see page 10 for power on instructions)
Step 8: congure the IP information using a laptop connected to the serial console or the keyboard and monitor
A
B
C
D
E
F
G
Power supply module fan
Power supply AC inlet
Serial console (RJ-45 connector)
Dedicated management port and IPMI interface
LAN port of the rst bridge (BR2)
LAN port of the second bridge (BR4)
LAN port of the third bridge (BR6)
H
I
J
K
L
M
PCI-E card expansion slot
USB keyboard ports
WAN port of the rst bridge (BR2)
WAN port of the second bridge (BR4)
WAN port of the third bridge (BR6)
VGA port
CAUTION
Slide rail/mounted equipment is not
to be used as a shelf or a work space.

Copyright © 2014-2015 Exinda Networks, Inc. Any rights not expressly granted herein are
reserved. All other brands, product names, trade names, trademarks and service marks used
herein are the property of their respective owners. P/N: 509-2700-00 R0E_060315
www.exinda.com 1-877-439-4632 Follow us @exinda
GLOBAL HEADQUARTERS
8 Faneuil Hall Marketplace, 3rd Floor
Boston, Massachusetts 02109
United States of America
Phone: +1 877 439 4632 (toll free), +1 617 500 0007 (local)
Fax: +1 877 219 0603
www.exinda.com
HDD LEDNIC2 LED
Power LEDOverheat
Fan Fail LED
NIC1 LED I/O Power
Button
Reset Button
Network Orchestrator
4062 Series
eriesS2640
orchestratk OrorwNet
HDD LED
NIC1 LED
ail LEDan FF
theaervO
NIC2 LED HDD LED
NIC1 LED er LEDwo P
oneset ButtR
onButt
erwoI/O P
8. Front Panel Operation
Power on the Appliance:
Press the I/O Power Button located on the far right
of the front panel.
Table of contents
Other Exinda Network Hardware manuals