
Connecting a P e-made Cable
Step 1: St ip away all of the cable and shielding so
you have 1/2" of the cente conducto exposed as
shown in the pictu e.
Step 2: Then st ip away the black oute jacket so
you have 1/4" of the shielding exposed. Do not
The cables a e labeled with a yellow w ap detailing the came a end
It s very mportant that you dent fy these ends
you have 1/4" of the shielding exposed. Do not
allow any of the coppe shielding to touch the
cente conducto .
Step 3: Inse t the cable into the fitting and gently
find the hole fo the cente conducto befo e you
It s very mportant that you dent fy these ends
before nstall ng the cable so that you have the correct ends at the
correct locat on.
find the hole fo the cente conducto befo e you
p ess the fitting onto the wi e. Now just twist the
fitting onto the wi e while fi mly p essing down
until the fitting is fi mly on the cable.
Installing a powe wi e pigtail
Step 1: At the came a location, take the powe
cable and st ip away the oute sheathing to
expose the inne two wi es (black & ed). Then
st ip away about 1/4" of the wi es jacket to
expose the coppe wi e. Do the same to the
powe wi e pigtail which connects to the came a
www.ezwatch-secu ity-came as.com
powe wi e pigtail which connects to the came a
powe connection as shown. Note: Do not st ip o
cut the powe lead coming di ectly f om the
came a. You should st ip the "pigtail" powe
cable which came with you kit. You should have
one "pigtail" fo each came a.
Inte national 001-801-4783980
Step 2: Now take the ed powe cable lead and
twist it togethe with the black & white lead f om
the powe pigtail. Now take the black lead f om
the powe cable and twist it togethe with the all
black lead f om the pigtail. Use the g ay wi e nuts
p ovided with you system and twist them onto
Main Office/Mailing Address
p ovided with you system and twist them onto
the wi es until they a e fi mly secu ed.