Fast 8295RT User manual

FAST TRACK TANK GEN 4B
INSTALLATION AND PARTS MANUAL
8295RT, 8320RT, 8345RT
8310RT, 8335RT, 8360RT
8320RT, 8345RT, 8370RT
Fast Global Solutions
4130 Commerce Boulevard
Windom, MN 56101

2
General Information
All rights, especially copying and distribution rights are reserved. No part of this publication may be reproduced in any
form or by any means, electronic or mechanical, including photocopying, without express written permission from Fast
Distributing, Inc.
Parts information in this manual represents components installed when product was manufactured based upon the best
available information. Modications made subsequent to initial delivery are not included. Always verify the parts and color
required with Fast Distributing, Inc at 1-800-772-9279.
If you have any questions, please contact your dealer or our Parts and Service Department.

3
Contents
General Information................................................................................................ 2
Remove Hydraulic Filter Cover, Step Assembly And Tool Box .......................... 4
Remove Center Link Bracket And Radar.............................................................. 5
Install Rear Tank Supports..................................................................................... 5
Install Receiver Mounting Brackets ...................................................................... 6
Install Setscrews..................................................................................................... 6
Install Radar ............................................................................................................ 7
Install Tanks ............................................................................................................ 8
Install Straps And Nylon Protector ..................................................................... 10
Install Windshield Washer Reservoir And DEF Fill Bracket ............................. 10
Install Step Assembly............................................................................................11
Tanks And Hardware ............................................................................................ 12
Plumbing................................................................................................................ 14

4
Remove Hydraulic Filter Cover, Step
Assembly And Tool Box
1. Remove hydraulic lter cover (1) and set aside. Cover
will not be re-installed with tanks installed on tractor.
2. Remove hardware from windshield reservoir (2),
mounting bracket and railing so reservoir can be moved
out of the way. Save all hardware to be reused.
3. Tractor with DEF Fill only, Remove hardware from DEF
ll bracket and save for reuse.
^WARNING
Step assembly weighs approximately 300 lbs.
Use an appropriate lifting device to prevent
injury.
4. Attach lifting device to step assembly.
5. Remove nuts, washers and carriage bolts (4), (5) and
(6). Save nuts, washers and carriage bolts (5) for reuse.
6. Remove step assembly.
7. Remove step bracket (7).

5
7. Remove tool box (8) from bracket. Tool box bracket does
not need to be removed.
Remove Center Link Bracket And
Radar
1. Remove center link (1) and mounting bracket from right-
hand side of tractor.
2. Disconnect radar harness from radar (2). Remove radar
from mounting bracket (3). Save hardware for reuse.
Remove radar mounting bracket (3).
3. Remove mounting bracket (3) from tractor. Mounting
bracket will not be reused.
Install Rear Tank Supports
1. Install right hand tank mount (1) with three M16 x 40mm
GR8.8 bolts and three M16 at washers. Repeat on left
side using left hand tank mount, three M16 x 40mm
GR8.8 bolts and three M16 at washers.
2. Install tank support (3) with two ½ X 1-½'' bolts (4),
½'' washers and ½'' nylock nuts. Do not fully tighten
as bracket will need to be adjusted when tanks are
installed later.
3. Install rubber isolator (5) with three ½ x 1-½' bolts (6)
and three ½'' centerlock nuts. Snug bolts to slightly
compress rubber. Repeat procedure for left hand side.
Note: For Ultra Wide Gauge tractor, brackets (1) and (3)
are reversed.

6
Install Receiver Mounting Brackets
^WARNING
Receiver mounting bracket weighs
approximately 105 lbs. Use an appropriate
lifting device to prevent injury.
1. Install left-side mounting bracket (1) to tractor with M20 x
60mm GR 10.9 bolts (2) and M20 at washers. Refer to
torque charts in this instruction for bolt torque values.
2. Install right-side mounting bracket (3) to tractor with M20
x 60mm GR 10.9 bolts (2) and M20 at washers. Refer to
torque charts in this instruction for bolt torque values.
3. Place rubber isolators (4) on top and bottom of bracket.
4. Place plate (5) on top of isolator and insert four ¾ x 9''
GR5 bolts (6) through plate and both isolators.
5. Repeat steps 3 and 4 for left-hand side receiver mounting
bracket.
^WARNING
Receiver mounting tube weighs approximately
105 lbs. Use an appropriate lifting device to
prevent injury.
6. Raise receiver mounting tube (7) into position with radar
bracket facing forward and install eight ¾'' centerlock
nuts. Tighten all eight bolts equally so some bulge is seen
on the rubber isolators.
Install Setscrews
1. Install four setscrews (1) in receiver tube. Verify setscrews
do not extend inside tubes.

7
2. Install two setscrews (1) in each receiver on left and right-
hand tanks. Verify setscrews do not extend inside tubes.
Install Radar
1. Attach radar (1) to mounting bracket (2) with existing
hardware.

8
Install Tanks
^WARNING
Each tank weighs approximately 1100 lbs.
Use an appropriate lifting device to prevent
injury.
1. Connect an appropriate lifting device to left-hand tank.
Tank will balance when strap is 77” from center.
2. Connect an appropriate lifting device to right-hand tank.
Tank will balance when strap is 77” from center.
Typical Lifting Device
3. Raise tank and guide into position on rear support
bracket (1).
4. Align tank receiver with front receiver and insert tube (2)
through tank and into front receiver.

9
5. Verify that tube (2) does not extend past front receiver
on right-hand side of tractor.
6. Install right-hand side tank using steps 1 and 2.
7. With right-hand tank (3) aligned with front receiver,
push tube (2) through right-hand tank.
8. Push both tanks inward against front receiver and
tighten eight setscrews (4) on front receiver and outside
of both tanks. Refer to torque charts in this instruction
for bolt torque values.
9. Disconnect lifting devices.

10
Install Windshield Washer Reservoir
And DEF Fill Bracket
1. Install windshield washer reservoir with supplied
hardware, remount windshied washer reservoir bracket
and mount reservoir with hardware removed earlier.
2. Bolt DEF Support bracket in place using two 592
carriage bolt 3/8 x 1 and two 769 3/8” nylock nuts.
Reinstall DEF Fill with hardware removed earlier.
Install Straps And Nylon Protector
1. Position strap (1) into place and insert nylon web (2)
between strap and tank. Insert studs on straps through
holes in tank supports. Place two ½'' washers and two
nylock nuts on studs and tighten only enough to keep
nylon web in place and tank from moving side to side.
Now tighten the bolts (see Page 5, step 2) that hold the
tank support to the tank mounts. Repeat procedure on
left side.

11
Install Step Assembly
1. Install top step bracket (1) with four 5/8 x 1.5'' carriage
bolts (2) and (3), and ange nuts. Refer to torque charts
in this instruction for bolt torque values.
2. Remove six bolts (4) and existing top step. Install new top
step and attach with six bolts previously removed. Refer
to torque charts in this instruction for bolt torque values.
3. Install step support tube (6) as shown into receiver on
left-hand tank. Do not tighten setscrews at this time.
^WARNING
Step assembly weighs approximately 300 lbs.
Use an appropriate lifting device to remove
step assembly.
4. Attach lifting device to step assembly.
5. Raise step assembly into position and attach to top
bracket (1) with 5/8 x 1.5'' carriage bolts (7) and 5/8'' lock
washers and nuts.
6. Attach to support tube with existing carriage bolts (8) and
ange nuts.
7. Adjust step and tighten all step hardware and setscrews.
Refer to torque charts in this instruction for bolt torque
values.

12
Tanks And Hardware
1
3
5
2
4
6
7
8
9
10
11
12 13 14 15 16 17 18
19 20 23 24
21 22 25 26 27 28 3029 31
40
41
32 33 34
35
36
37
38
39
42
43
44
45
46
47
48
495051
5253
54
5556
57

13
Item Vendor Part # Fast Part # Description Quantity
1 239 Nut Centerlock 1½" Zp 4
2 260 Washer ½" Zp 6
3153 Bolt Hex Head ½ X 1-½Zp Gr5 6
4237 Nut Centerlock 3/8 ½" Zp 6
5M100G 530068 Gasket Manifold 1" 4
6 FC100 540000 Clamp Manifold 1" 4
7 M100PLG 530070 Plug Manifold 1" 2
8 19900 Tank Track JD Right 4B 1
9 239 Nut Centerlock ½" Zp 4
10 260 Washer ½Zp 4
11 19937 Strap Tie Down SS 1
12 19340 Web Nylon 4" Anti-Wear 2
13 129 Bolt Hex Head 3/8 X 1-½Zp Gr5 6
14 14894 Isolator Rubber 4G 1
15 19337R Tank Support Right Rear 4G 1
16 28170 Tank Mount Rear Right 4G 1
17 547 Bolt Hex Head 16mm X 40mm Gr. 8.8 6
18 551 Washer Lock 16mm 6
19 28171 Tank Mount Rear Left 4G 1
20 19337L Tank Support Left Rear 4G 1
21 14894 Isolator Rubber 4G 1
22 10216 Riser Assembly 2
23 540002 Clamp Manifold 2" Full Port 2
24 530019 Gasket Manifold 2" Full Port 2
25 19337
26 19901 Tank Track JD Left 4B 1
27 128 Bolt Hex Head 3/8 X 1 Gr5 Zp 2
28 19934 Bracket Windshield Washer Reservoir 1
29 769 Nut, Flange 3/8 Zp 2
30 779 Setscrew ½ X 1-½Zp 2
31 223 Nut Hex , Jam ½Zp 2
32 14932 Hand Rail 1
33 14935 Step Insert 1
34 590092 Bolt Carraige 5/8 X 1-½Zp 3
35 772 Nut Whizlock 5/8" 3
36 14578 Jd Top Step 1
37 14547 Isolator Rubber Step 1
38 19918 Bracket Step 1
39 10206 Mount Quick Fill 1
40 592 Bolt Carriage 3/8 X 1 2
41 19920 Mount Def Fill 1
42 769 Nut, Flange 3/8 Zp 2
43 5333 Isolator Rubber Receiver Cross Tube 4
44 14898L Mount Front Left 4G 1
45 5288 Plate Rubber Isolator
46 14899 Receiver Cross Tube 1
47 14898R Mount Front Right 4G 1
48 14554 Receiver Cross Tube 1
49 653 Nut Centerlock 3/4" Zp 8
50 590147 Bolt Hex Head 3/4 X 9 Zp Gr5 8
51 M100075BRB90 530060 1 Inch Manifold X 3/4 Inch Elbow 2
52 FC100 540000 Manifold Clamp 1" 2
53 100G 530068 Manifold Gasket 2
54 HB100-075 530043 Hose Barb 1" Npt X 3/4 HB 4
55 64012H 540013 Clamp Hose 3/4" 6
56 15007008 510006 Hose Vinyl 3/4" X Specify Feet 2
57 590165 Setscrew 5/8 X 1-½" ZP 14

14
Plumbing

15
Item Vendor Part # Fast Part # Description Quantity
1 M100MPT 530069 1'' Manifold x 1'' MPT 2
2 HB100 530041 1’’ MPT x 1’’ Hose Barb 2
3UV100FP 500009 Valve, 1'' 2
464016H 540014 Clamp, 1'' 6
5HBT100 530056 1'' Hose Barb Tee 1
6 1BH200 510016 1'' Hose, Cut To Fit 1
7 300CAP 530017 Cap, 2'' 1
8 200G 530019 Gasket (Part of 530017)
9 HN-79-12 530179 Cable Lanyard 1
10 MVSF220FP 530128 Manifold Valve 2'' Full Port x Male Adapter 1
11 200G 530019 Gasket, 2'' 11
12 FC220 540002 Clamp, 2'' 11
13 M220200BRB 530103 Flanged Hose Barb, 2'' 5
14 TC-231 540007 T-Bolt Clamp 2'' Hose 8
15 10206 Mount, Quick Fill Valve 1
16 MV220FP 500006 Valve, 2'' 2
17 M220BRB90 530104 Flanged Hose Barb 90°, 2'' 2
18 12012800 510002 2'' Hose, Cut To Fit
19 M220CR 530107 Full Port Flanged Cross, 2'' 1
20 M100G 530068 Gasket 1'' 4
21 HB100-90 530044 1'' MPT x 1'' Hose Barb 90 2
22 TEE100 530157 1'' Poly Tee 2
23 1870290 500014 3/4'' Check Valve 2
24 RN150-100 530149 Poly Reducing Nipple 2
25 102107 JD Riser Assembly 13'' Tube 2
26 RN200-150 530249 2'' x 1-½'' Reducing Nipple 2
27 M220FPT 530243 2'' FP Manifold x 2'' FPT 2
28 FC100 540000 Clamp 1'' 2
29 M220CPG45 530105 2'' x 2'' 45° Full Port Coupling 2
30 SL100-90 530152 1'' Street Elbow 2
31 510006 Hose Vinyl 1'' x 48'' 2

16
seulaVnoisneT-euqroTEAS
eziStloB 2edarG 5edarG 8edarG
yrD
-bl
tf
)m•N(
L
detacirbu
-bl
tf
)m•N(
yrD
-bl
tf
)m•N(
L
detacirbu
-bl
tf
)m•N(
yrD
-bl
tf
)m•N(
L
detacirbu
-bl
tf
)m•N(
82-4/1 )9(6 )6(5 )31(01 )01(7 )91(41 )41(01
02-4/1 )8(6 )6(4 )11(8 )9(6 )61(21 )21(9
42-61/5 )71(31 )31(9 )32(91 )02(41 )73(72 )82(02
81-61/5 )51(11 )11(8 )42(71 )81(21 )33(52 )52(81
42-8/3 )13(32 )32(71 )84(53 )63(62 )95(94 )44(73
61-8/3 )72(02 )02(51 )24(13 )13(32 )95(44 )44(23
02-61/7 )84(63 )63(72 )57(55 )65(14 )601(87 )97(85
41-61/7 )34(23 )33(42 )76(94 )05(73 )59(07 )17(25
02-2/1 )57(55 )65(14 )511(58 )68(46 )361(021 )221(09
31-2/1 )66(94 )05(73 )201(57 )77(75 )441(601 )801(08
81-61/9 )601(87 )08(95 )461(121 )321(19 )232(171 )471(821
21-61/9 )59(07 )27(35 )841(901 )111(28 )902(451 )651(511
81-8/5 )941(011 )111(28 )132(071 )271(721 )623(042 )442(081
11-8/5 )231(79 )99(37 )402(051 )351(311 )882(212 )612(951
61-4/3 )162(291 )591(441 )304(792 )303(322 )075(024 )724(513
01-4/3 )332(271 )571(921 )563(962 )372(102 )015(673 )383(282
21-1 -- -- )559(407 )617(825 )0531(599 )2101(647
8-1 -- -- )478(446 )556(384 )332
1(909 )429(186

17
seulaVnoisneT-euqroTcirteM
tloB
eziS 8.4ssalC 8.8ssalC 9.01ssalC 9.21ssalC
yrD
)m•N(tf-bl
detacirbuL
)m•N(tf-bl
yrD
)m•N(tf-bl
detacirbuL
)m•N(tf-bl
yrD
)m•N(tf-bl
detacirbuL
)m•N(tf-bl
yrD
)m•N(tf-bl
detacirbuL
)m•N(tf-bl
6M )5.3(7.4 )5.4(6 )5.6(9.8 )5.8(3.11 )5.9(31 )21(5.61 )5.11(5.51 )5.41(5.91
8M )5.8(5.11 )5.01(5.41 )61(22 )02(5.72 )5.32(23 )5.92(04 )5.72(73 )53(74
01M )71(32 )12(92 )23(34 )04(55 )64(36 )95(08 )55(57 )07(59
21M )5.92(04 )73(05 )55(57 )07(59 )08(011 )501(041 )59(031 )021(561
41M )64(36 )95(08 )88(021 )011(051 )031(571 )561(022 )051(502 )091(062
61M )47(001 )29(521 )041(091 )571(042 )002(572 )552(053 )532(023 )003(004
81M )001(531 )521(071 )591(562 )54
2(033 )572(573 )053(574 )523(044 )014(065
02M )041(091 )081(542 )572(573 )053(574 )093(035 )005(576 )064(526 )085(097
22M )591(562 )542(033 )573(015 )084(056 )535(527 )086(029 )526(058 )008(0801
42M )542(033 )513(524 )084(056 )006(028 )086(029 )058(0511 )008(0801 )0001(0531

18
Fast Global Solutions
4130 Commerce Boulevard
Windom, MN 56101
1-800-772-9279 Toll Free
1-507-427-3861 Voice
1-507-427-3030 Fax
Part Number 984 Fast Track Tank 8294,8320,8345RT Released 10/1/2010
rt Number 989 R
Pa ev CFast Track Tank Gen 4B 12-10-2018
This manual suits for next models
5
Table of contents