
Step 3. Using a ” bolt, attach an SB Bar to the bottom of the S Vertical
Bar (Figure ).
Step 4. Connect an SL and an SR Vertical Bar to the ends of the SB
(Figure ). Important: Insert the bolt through the large hole in the
vertical bar first, then the small hole, then the nut, so that your
screwdriver is inside the bar when tightening. The head of the bolt
will be flush against the inside wall of the SL and SR Bars when
tightened. Attach the ST between the SL and SR (Figure ). You
have just finished the first Side Frame.
Step 5. Repeat Steps through to assemble the second side frame,
then firmly tighten all bolts on both Side Frames, making sure the
bars are flush with one another.
Important: Assemble both sides before proceeding.
Step 6. Connect the ends of an A Bar between the top ST Bars (Figure
). The open track of the A Bar should face toward the ground. Insert
the bolts through the predrilled holes in the ST bars, then screw the
bolts into the ends of the A Bar on both ends (Figure ). Connect the
remaining A Bar(s) to the S Vertical Bars at each tier. Note: Figure
shows the -Tier Compact SunLite
®
Garden only.
• -Tier Compact SunLite
®
Garden has two A Bars.
• -Tier Compact SunLite
®
Garden has three A Bars.
Step 7. Connect the A Shelf Bars to the SL and SR
Vertical Bars at each tier (Figure ). Each A Shelf Bar
is box-shaped with a thin flange. Make sure the wide
flat side of the flange is flush with the outside of the
S Bars on each side and pointing toward the top of
the unit. The box-shaped portion of the Shelf Bars
are positioned inside to hold the Poly Trays (Figure
). Note: Figure shows the -Tier Compact SunLite
Garden only.
• -Tier Compact SunLite
®
Garden has four A Shelf
Bars.
• -Tier Compact SunLite
®
Garden has six A Shelf
Bars.
Step 8. You may now tighten all bolts on the frame,
holding the bars in place as you tighten. With the frame
upright, make sure all outside edges of the bars are
flush and secure. Adjust, as necessary.
Step 9. Gently lay the entire frame on its side. Place a
Caster Insert into the bottom of all four S Vertical Bars.
Firmly push a Caster into each insert until it clicks into
place (Figure ). Use a mallet, if needed.
Step 10. Stand the unit upright. Cover all the bolt holes
with Bolt Caps (Figures and ). Place Poly Trays on
the A Shelf Bars. The frame assembly is finished.
2" Bolt
Bolt Cap 2" Bolt
Figure 2
S3B
Bottom of S1 bars
have 4 bolt holes
Side Frame Assembly — Bottom
Note:
Larger
hole
faces
outside
of frame.
Figure 3
Caster Insert
Caster
S3T
S3T
S3B
S3B
Box side of A4 Shelf Bars
face inside and the thin
flanges are positioned up
and flush with the outside of
the frame.
Note: Illustration shows 2-Tier
SunLite. The 3-Tier has an additional
set of A3 and A4 parts and bolts.
Shelf Bar
Bolt Cap