
Fig. 2
Fig. 5
Fig. 6
Fig. 3 Fig. 4
3. With the lower frame pole and and the four
leg poles (now with rubber feet attached),
assemble them together via the inlets located
at the bottom of the frame pole. Secure them
in place with the supplied bolts and allen key.
See Figure 2.
4. Then stand the bottom frame up. If needed,
please rotate the rubber feet so that the non-
slip grip is touching the floor first.
5. Then, insert the upper frame pole to the
lower frame pole. Secure in place using
the supplied bolts. You will need a 15mm
spanner to secure the bolt. See Figure 3 & 4.
6. Once the frame has been assembled, it is
time to unfold and set up the rattan basket.
Get the rattan basket, then unfold it so that
it fully expands (Figure 5). Secure one of the
Allen bolts and 10mm nuts in place onto the
bolt plate situated on the top of the basket
(Figure 6). You will need a 10mm spanner
and the supplied Allen key to secure in place.
Please do not fully tighten the bolt in place.
Only loosely secure the bolt.
IMPORTANT: When securing the bolt, please
ensure the threaded end is pointing outwards,
away from the basket as illustrated in Figure 6.
WARNING: Take extra care when unfolding the
rattan basket. Risk of fingers getting trapped.
7. Then, with two people, expand the basket
fully so that the other hole that you need to
bolt on is fully aligned. Once aligned, please
bolt into place using the method described in
step 4.
WARNING: You will need TWO people involved
when expanding the basket and aligning the
bolts. Do NOT fully tighten the bolts once the
basket has fully assembled.
8. Secure the bolts at the bottom of the basket.
Again, two people will be required to ensure
the holes are properly aligned.
9. Once assembled, tighten the bolts using a
10mm spanner and the supplied Allen key.