
Mounts can be bolted to the top or sides of the tunnel.
Before installing, place your bag onto your machine in position that’s best for your
gear. Draw the webbing straps down to the ideal anchoring position and mark
position for drilling, if there is no existing bolt hole present.
After locating a suitable position for an anchor point, drill a 10mm hole, and attach
your GL Mount using the anchor bolt, washers and lock nut as shown.
Pull the webbing
thru the GL Mount,
and thread thru
the eyelet as
shown.
Pass the webbing
back thru the GL
Mount, and thread
thru the buckle as
shown.
Pull tight,
securing eyelet
snug against
your GL Mount,
ensuring a
carefree ride.
1018
See giantloopmoto.com/warranty for complete warranty details.
L
I
M
I
T
E
D
L
I
F
E
T
I
M
E
WARRANTY
NOTE: Failure to follow recommended
mounting instructions voids warranty.
Manufacturer is not liable for any
damage, injury or death that results
from improper use and installation of
products. By installing these products,
user accepts all liabilities, terms and
conditions outlined in the Liability &
Warranty statement:
http://giantloopmoto.com/warranty/
www.giantloopsnow.com | 888-358-8347 | Bend, Oregon USA
GO LIGHT. GO FAST. GO FAR.
CAUTION: Before drilling, ensure bolt holes do not damage heat exchangers or other
components. Keep webbing straps away from hot exhaust. Reposition if necessary.
INSTALLING YOUR GIANT LOOP QUICKMOUNTS