
IMO83B1 – April 2011
4
2. INSTALLATION INSTRUCTIONS
PRE-INSTALLATION OF THE TEPPANYAKI
1. Check that there is sufficient clearance between doors and passageways
to move equipment into the cooking area.
2. Remove banding and cardboard outer.
3. Lift off wooden base.
4. Push in legs and tap in with a hammer into tubes (If required mount on
stand (OPTIONAL)
INSTALLATION
(FOR AUTHORISED TECHNICIANS ONLY)
Note: AFTER ANY MAINTENANCE OR ADJUSTING OF GAS CONNECTED
COMPONENTS, A GAS LEAK TEST MUST BE CARRIED OUT, TO ENSURE
THERE ARE NO GAS LEAKING HAZARDS
Adequate ventilation must be provided by a hood with vent and exhaust fan.
Never make a direct connection between the unit and vent flue. Check there is
sufficient room between doors and other units to allow equipment to be moved
into position.
Check the data plate to ensure that the appliance is suitable for the gas supply to
which it is to be connected and for information relative to gas input. Etc.
Follow these instructions carefully.
1. Set unit in correct position (ENSURE THERE IS A MIN 25mm REAR
WALL CLEARANCE FROM COMBUSTIBLE MATERIALS AND THAT
THE UNIT IS PLACED ON A FIRE PROOF BASE) and adjust feet using a
spirit level, checking from back to front and side to side.
2 Have a licensed gas fitter or our local gas company connect the appliance
to the mains pressure supply.
NOTE:
The appliance must be installed by an authorised person and in accordance with
the regulations of the local Gas Authority, AS5601/AG601 and any other
authority having jurisdiction. The appliance has been tested and preset before
leaving our factory, but small adjustments may be necessary to suit local
conditions. Correct operation of the appliance must be tested as part of the
installation procedure.
The governor supplied must be installed on the gas inlet to the appliance. This is
supplied as a loose item. Licensed Gasfitter should make connection to main gas
line. Install a manual shut-off valve in gas line to the appliance manifold and
union.
NOTE: Models operating on LP Gas will be supplied with a regulator as from
(1
st
January 2005) as new standard (AS4563/AG300).