1. Connect the Tubes:
In the Package Box 1 and 2 you nd 45x45mm Tubes
6 x 150 cm = 4ft 11in = Label E
6 x 125 cm = 4ft 1in = Label A
2 x 120,5 = 3ft 11in = Label B
2 x 111 cm = 3ft 7in= Label C
2 x 130 cm = 4ft 3in = Label D
also you have
7 Flat Prole Steel connectors to connect the Tubes together.
You rst connect this Tubes with the Tube Connectors!
So you have tubes of the below sizes ready to install.
You can see on the Sketch on Sketch Pages later in this docuiment where the Tubes are Finaly
located
3 x 300 cm / 9ft 10in = 150 cm + 150 cm Tubes = Use Tube E+E
2 x 250 cm / 8ft 2in = 125 cm + 125 cm Tubes = Use Tube A + A
2 x 245,5 cm / 8ft 1in = 125 x 120,5 cm Tubes = Use Tube A + B
2 x 130 cm / 4ft 3in = 130 cm Tube = Tube D
2 x 111 cm / 3ft 7in = 111 cm Tube = Tube C
Now you are ready to build the GSK Golf Box.

E + E
3 x 300 cm
9ft 10in
A + A
2 x 250 cm
8ft 2in
A + B
2 x 245,5 cm
8ft 1in
D
2 x 130 cm
4ft 3in
C
2 x 111 cm
3ft 7in

2. Sidewall Setup:
Build this 2 Times for 2 Sidewalls:
Build the Sidewalls as shown with the 90° Angle connec-
tors attached in each corner, as shown in the picture.
Reference on the Sketch Side View, how it nally should
look.
It does not matter how you install the 90° Angle Connec-
tors, inside or outside facing.
The distance on the top side to side is 120 cm / 3ft 11in
The distance on the ooor side to side is 130 cm / 4ft 3in
You need following Tubes:
1 x 250 cm = 8ft 2in
1 x 245,5 cm = 8ft 1in
1 x 111 cm = 3ft 7in
1 x 130 cm = 4ft 3in
4 x 90° Connectors plus Screws
Please see the pictures and Sketch how to connect the 2
Sidewalls Bars to each other.
111 cm
130 cm
Velcro for 120 cm
125 cm 125 cm
120,5 cm
Tube Connector 4 Screws
Looking Inside the Construction
125 cm
4,5 cm
Side View
Velcro both sides for 250 cm
Velcro centered approx 90 cm
B
C
D
A
A
A

Please use now the delivered Velcro Tape and stick it as in the picure on the Sidewalls please see
the Sketch and the Pictures for your Reference.

Now lift the sidewalls and connect with one 300 cm / 9ft 10in Tube on the Floor with both Side-
walls as Shown in the 3 D Sketch Plan, and connect it with the 2 Angle Connector, the Angle
Connectors should mounted parallel to the Floor, as in the Picture below.
The Sides with the Velcro must face inside the Box
The Sidewalls should now stand themselves.

TOP Tubes Mount:
Put 2 x 300 cm / 9ft 10in Tube on the Top of the Box and Connect this as well with Angle Con-
nectors to the side walls.
See the Pictures and the Sketch 3D for Reference how the Tubes should be mounted.
Put Velcro Tape on the Top Tubes
Both Top Tubes Facing inside = Down to the Floor for 291 cm with Velcro
Back Tube where the Screen is mounted - Side Facing to ceiling for 300 cm with Velcro

Fabric Install
Sidewalls:
There are 2 Sidewalls, each dedicated to its own side.
Use the Velcro to put the Fabric on to the Sidewalls, start from the top and then stretch it out
downwards.
The “Flausch” Velcro facing inside the Box has to be on the side where the Screen is mounted.
Repeat that on the second side as well.

Impact Screen NEW Version 2020 (within the EU from July 2019)
VELCRO on the LEFT and RIGHT POLE - facing away from the Player on the Back the Vel-
cro Hookband to the Alumium
So you can x the Sides of the Impact Screen to the Frame
Top / Upper Side:
Use the Hammerscrews approx 25mm Long, and 8 mm NUT, for the Fixed mount of the Impact
Screen on the Top Bar. Hammerscrew through the Eyelet and mounting with the Nut.
The Postion of the Screen is direclty full width of the Box, as you see in the Picture Below.
Stretch then the screen and screw it on the Top Bar, so it is on Top as Flat as Possible.
Left / Right Sides:
Now velcro the Sides to the left and right Poles that already have the Loop Velcro on the Alumini-
um Tubes. Start from the Top and End up at the Bottom to have perfect Flat Screen.
Lower Latch:
Now Connect with the Black Fast Fix and through the Eyelets - the Screen and the Sidewalls so
the Lower Latch of the Screen stays in Place. (Pic 1 on this page)
Pic 1.

Roof
Now Install the Roof, the Latch must face towards the Impact Screen.
The Latch must be velcroed to the Roof before Putting it on the Poles.
See the pictures for an detailed install of the screen.
The Roof latches should prevent high Shots from hitting the top post and/or leaving the box itself.

GSK Home Golf Box
2 x Sidewall Setup
Dimensions refer to an GSK Home Standard Box
111 cm
130 cm
Velcro for 120 cm
125 cm
125 cm
125 cm
125 cm
125 cm
125 cm
120,5 cm
Tube Connector 4 Screws
Looking Inside the Construction
125 cm
4,5 cm
Front View
Side View
Roof Install
Screen Side
Roof
Velcro the Roof to the Top Bars
Roof Latches are at Screen Side
The Latches Protect Ball from Hitting
Top Bar and bouncing Back from the
Wall
Velcro both sides for 250 cm
Velcro centered approx 90 cm
Tube Connector 4 Screws
Looking Inside the Construction
Side Wall Fabric
on Velcro on Inner Sidewall
10 cm supernatant latch at Screen Side
Side Wall Fabric
on Velcro on Inner Sidewall
10 cm supernatant latch at Screen Side
A
A
A
A
A
A
B
C
C
D
D
ÊÊ
A
A
B
A
A
A

GSK Home Golf Box
Roof Setup
Back View
150 cm 150 cm
150 cm 150 cm
Front Top Tube
Screen Top Tube
Screen Top Post
Back Floor Tube
Back Floor Post
Top View
125 cm
120,5 cm
120 cm
130 cm
125 cm
120,5 cm
Tube Connector 4 Screws
Looking Inside the Construction
Side Wall Fabric
on Velcro on Inner Sidewall
10 cm supernatant latch at Screen Side
Side Wall Fabric
on Velcro on Inner Sidewall
10 cm supernatant latch at Screen Side
EE
E+E
E+E
E+E
B
A
Velcro for 291cm
Facing Down on Front and Screen Top Tube
B
A
EE
E
C
E
C

GSK Golf Box
Impact Screen Setup
Impact Screen Mounting Sketch Back View
Screen will be screwed xed to Top Bar with Hammerscrews and Screw Nut
On the left and Right POSTS use VELCRO HOOKBAND to x the Screen to the Sides.
Position the Screen (width of Box - 2 cm) centered full width of the Box .
5 cm
5 cm
Screw through Eylets
BLUE >> VELCRO on BACK POST FOR IMPACT SCREEN FIXING
SCREEN
25 cm
Side View
Impact Screen
Front
Side
Back
Side
GSK Home Golf Box
Impact Screen Mount
3D Sketch GSK Impact Box
Impact Screen Mounting Sketch Back View
A+B
A+B
E+E
E+E
E+E
C
DD
C
A+A
A+A
254 cm
130 cm
120 cm
300 cm
Position the Screen (291 cm width) exactly inside of the Box Side Tubes 4,5 cm from Border.
4,5cm
4,5cmScrew through Eylets
1 3/4 inch
1 3/4 inch

GSK 2020
HOME GOLF
IMPACT BOX
Youtube Setup Video
Link:
https://www.youtube.com/watch?v=-zOYIr6YxFc
Version 1.30 - Y2010
Golfsport Company KG
Am Kanal 2a/5
A-2482 Muenchendorf
Austria
E-Mail Contact / Setup Assistance:
Table of contents
Other Golfsport Video Gaming Accessories manuals