
THE CONICAL FERMENTER
PRO CONTROLLER
CONNECTING THE GLYCOL CHILLER
OR COOLING PUMP KIT
)KWWTQVOKWVVMK\QWVSQ\Q[QVKT]LML_Q\PJW\P
\PM/TaKWT+PQTTMZIVL+WWTQVO8]UX3Q\<PQ[
KWV[Q[\[WNJZI[[KW]XTMZ[[MIT[IVLPW[M[
<WKWVVMK\\PMKW]XTMZ[\W\PMNMZUMV\MZXTIKM
the white seal inside the threaded hole on the
[QLMWN\PMNMZUMV\MZ
3. Take the threaded section of the coupler and
[KZM_Q\WV\W\PM[IUM[QLMWN\PMNMZUMV\MZ
_PMZMaW]XTIKML\PM[MIT-V[]ZM\PI\Q\¼[
[KZM_MLWV\QOP\Ta=[MI[XIVVMZQNVMKM[[IZa
but do not over tighten.
4. Connect the other end of the coupler to the
[MK\QWVaW]R][\I[[MUJTMLJaX][PQVO\PM
[XZQVOTWILML[TMM^MJIKSIVL[TQLQVOQ\W^MZ
5. Repeat these steps on the other side of
\PMNMZUMV\MZ-V[]ZM\PI\\PMPW\ZML
hose is connected via the higher point on
\PMNMZUMV\MZIVL\PMKWTLJT]MPW[MQ[
connected via the lower position.
6
CONNECTION SETUP
?PMVaW]ÅZ[\\]ZVWV\PMKWV\ZWTTMZaW]_QTT
be greeted with the connection setup screen.
8ZM[[»[M\¼\WOW\W\PMUIQVLMNI]T\[KZMMV
MAIN DEFAULT
<PMUIQVLMNI]T\[KZMMV[PW_[\PMK]ZZMV\
IVL\IZOM\\MUXMZI\]ZM[]VQ\[aUJWT+MT[Q][
WZ.IPZMVPMQ\K]ZZMV\\MUXMZI\]ZMKWV\ZWT
[\I\][PMI\QVOKWWTQVO\ZIKSQVOIVLQN\PMZM
Q[INMZUMV\I\QWVZ]VVQVO][QVOUIVIOML
UWLMQ\LQ[XTIa[ITT\PMQVNWZUI\QWVNZWU
the current session.
=[M\PM]XLW_VJ]\\WV[\WKPIVOM\PM\IZOM\
\MUXMZI\]ZM0WTL\PM»[M\¼J]\\WV\WXI][MWZZM[]UM
\PMKWWTQVOIVLWZPMI\QVO[QOVIT<PQ[UIaJM][MN]T
_PMV\ZIV[NMZZQVOaW]ZJMMZW]\WN\PMNMZUMV\MZ<W
MV\MZ\PMKWV\ZWTTMZ[M\\QVO[XZM[[\PM»[M\¼J]\\WV
\PMVVI^QOI\M][QVO\PM]XLW_VJ]\\WV[IVLXZM[[
\PM»[M\¼J]\\WV\W[MTMK\IVWX\QWV
NOTE"AW]KIVUMI[]ZMIVLK]\\PMPW[M[\W
UISM\PMU[PWZ\MZQNVMMLML<PQ[_QTTIT[W
QVKZMI[MUI`QU]UKWWTQVOMЅKQMVKa-V[]ZM
\PI\aW]][MIUQVQU]UWN4_PMVX]UXQVO
liquid through the cooling sleeve.