Growatt GroBoost User manual

SHENZHEN GROWATT NEW ENERGY TECHNOLOGY CO.,LTD
GroBoost quick installation guide

Catalog
一、Overview..................................................................................................... 1
二、Installation................................................................................................... 6
三、Multiple Work Modes................................................................................. 11
四、Device parameters.................................................................................... 21
五、Common Problem..................................................................................... 22
六、APP Register ............................................................................................ 23
七、GroBoost Setting the Groboost via Shinephone APP................................ 25

1
一、Overview
◆Package List
Open the package, take out all the accessories, and check the quantity of all
the components in the box according to the package list, As shown in Figure
1-1 and Table 1-1.
Figure 1-1
Cod
e
Accessories
Number
A
GroBoost whole machine
1
B
PT1000 temperature sensor
1
C
Antenna
1
D
Quick installation guide
1
E
Wall-mounted bracket Screws
3
F
Seal bottom cover screw
4+2(More than)
G
3 PIN large load terminal
4
H
5 PIN AC input large terminal
1

2
I
6 PIN PT1000 small terminal
1
J
3 Pin RS485 and 12VDC small terminal block
2
Table 1-1
◆Product description
ShineLink adopts a device-gateway-server-client architecture model, which
uses gateways and servers to link household energy equipment with
homeowners to realize the entire function of monitoring, analysis, and
scheduling. Among them, GroBoost could control the temperature of the water
heater, and work automatically when the solar system has surplus power
exporting to the grid to maximize solar self-consumption.
Figure 1-2
GroBoost is a power regulator to adjust its power output automatically
based on resistive loads through wireless commands. With the ShineLink
system, it communicates with ShineLanBox through RF signal, accepts
commands to adjust power output, and realizes system energy distribution and
scheduling. The diagram of one of its application scenario is shown in Figure

3
1-2, in which the Inverter is communicated with the meter through RS485, and
communicate with the LanBox through ShineRFStick.
This application scenario is suitable for the Growatt new generation
inverter, like MIN, MID, MOD, SPH and SPA series, which could support to
upload the energy meter date to the server.
Figure 1-3
The diagram of another application scenario is shown in Figure 1-3, the smart
meter data is transmitted wirelessly to the LanBox through RailLog, which is
suitable for the -s series inverter which can’t upload the energy meter data to
the server.
◆ GroBoost Interface
As shown in Figure 1-4, the device has four indicator lights, four function
buttons and three waterproof connector, corresponding to different wiring input.
The functions and definitions are shown in Table 1-2.

4
Figure 1-4
No
Description
No
Name
Description
A
Indicator lights
1
LED1
Indicator lights for phase
L1
B
Buttons
2
LED2
Indicator lights for phase
L2
C
电源线接线头
3
LED3
Indicator lights for phase
L3,and for the RF
communication status
D
负载线接线头
4
LED4
Power indicator
E
信号线接线头
5
L1
Phase L1 control button
6
L2
Phase L2 control button

5
7
L3
Phase L3 control button
8
Home
RF pairing / Reset /
Factory Reset
Table 1-2
The following figure 1-5 is the wiring interface of GroBoost, and its functions and
definitions are detailed in Table 1-3.
Figure 1-5
NO
Description
NO
Description
1
Relay A input port
13
Input PE earth wire
2
Relay B output port
14
Input N zero line
3
Relay C output port
15
Enter L1 FireWire
4
TP1000—L1
16
Enter L2 FireWire
5
TP1000—L2
17
Enter L3 FireWire
6
TP1000—L3
18
Output PE earth wire
7
12V DC-DC
19
Output N zero line
8
12V DC-DC
20
Output L3 FireWire
9
GND (12V DC)
21
Output PE earth wire
10
RS485+ (D+)
22
Output N zero line
11
EARTH
23
Output L2 live wire

6
12
RS485- (D-)
24
Output PE earth wire
25
Output N zero line
26
Output L1 live wire
Table 1-3
二、Installation
Notice:
⚫Make sure to read the instructions to understand product information and
safety precautions before installation;
⚫The installer must use insulated tools and wear safety equipment during
the installation procedure;
⚫Construct sun and rain shelters to avoid GroBoost directly exposed to
sunlight and rain.
Figure 2-1
◆Installation Process
⚫Fix the wall-mounted bracket hanging on the wall with screws, drill holes in
the wall after positioning the four screw holes, put the plastic expansion

7
tube, and screw into the wall, to fix the wall hanging.
Figure 2-2
⚫There are four screws on the bottom cover of the whole machine,
please use a screwdriver to dismantle the screws.
Figure 2-3
⚫Remove the lower cover and start to wire it.
Figure 2-4
Loosen these screws

8
⚫The wire harness passes through the corresponding three terminals and
screwed themon the terminals. A 5 pin three-phase power input terminal is
for power input line, 3 pin power output terminals is for loads, and the 3 pin
RS485 and 12Vdc terminals are for the communication of the future
application.
Figure 2-5
⚫Screw the wire on the male terminal, connect it to the corresponding
female socket of the device, and fix screws on both sides of the terminal to
fix the terminals.
Figure 2-6
⚫Adjust wiring distance and screw the four screws fixing the sealing lower
cover to fix the lower cover.

9
Figure 2-7
⚫Adjust the length of the power and load lines, screw the covers, adjust the
wiring head to reduce the space, and make the sealing degree higher.
Figure 2-8
⚫Fix the GroBoost on the wall, and tighten the screws on the side.

10
Figure 2-9
GroBoost Notice for wiring:
⚫Remove the lower cover of GroBoost, and you need to pass the wire
harness through the corresponding three terminals to prevent the wire
harness from being twisted.
⚫Use a no less than 4mm2 copper core wire for the power line, ground line,
and load line. After stripping the wire, make sure that the wire is not too
long, generally 10mm.For 485 communication lines please use shielded
twisted wire.
⚫Put the stripped wire into the terminal and use a flat-blade screwdriver to

11
fix the wire,and then connect it to the device.
⚫The antenna needs to be led out of the device to prevent signal shielding.
三、Multiple Work Modes
◆Load Wiring
The diverse load situation corresponds to different wiring ways. In addition, if
the immersion heater doesn’t have a temperature sensor, and the GroBoost
needs to use the temperature sensors (Pt1000). The following table 3-1 shows
the wiring diagram of a diverse load situation.The following figure is the overall
detailed wiring diagram.
No
Load
Wiring ways
Diagram
1
a singlephase
load
The power input line is for phase L1 input
terminals, loads are for phase L1 output
terminals, PT 1000 is for the T1 terminal, which
is linked with the load in the phase L1
Figure
3-1
2
Two
singlephase
loads
Three-phase power line input, and two
single-phase loads are connected separately to
phase L1/L2 output terminals. Phase L1 is
linked with the PT1000 of the T1 terminal,
Phase L2 is linked with the PT1000 of the T2
terminal
Figure
3-2
3
Three
singephase
loads
Three-phase power line input, and three
single-phase loads are connected separately to
phase L1/L2/L3 output terminals. Phase
L1/L2/L3 is linked with the PT1000 of the
T1/T2/T3 terminal
Figure
3-3
4
A threephase
load
Three-phase power line input, and a
three-phase loads are connected to phase
L1/L2/L3 output terminals. Three-phase load is
linked with the PT1000 of the T2 terminal
Figure
3-4
5
A
singlephase
load and a
threephase
load
Three-phase power line input, L1 output
connected relay input, a single-phase load is
connected to the Relay OUT2 .Single-phase
load is linked with the PT1000 of the T1
terminal. Three-phase load is connected to the
Figure
3-5

12
Relay OUT1, and L2/L3 phase power output,
Three-phase load is linked with the PT1000 of
the T2 terminal.
Table 3-1
The following figure is the overall detailed wiring diagram:
Load situation one: A single-phase resistive load, such as the immersion
heater for water heater.
⚫Single-phase power input, a single-phase L1 adjustable power
output mode, with a PT1000 temperature sensor.

13
Figure 3-1
Load situation two: two single-phase resistive loads, such as two
immersion heaters for each water heater.
⚫Three-phase power input, a single-phase L1 adjustable power output
mode and a singlephase L2 fixed power output mode. Two PT1000
temperature sensors for loads of each phase.
Figure 3-2
Load situation three: three single-phase resistive loads, such as one
immersion heater for water heater and two heating spaces.
⚫Three-phase power input, a single-phase L1 adjustable power output
mode and two single-phase fixed power output mode(L2/L3). Three
PT1000 temperature sensors for loads of each phase.

14
Figure 3-3
Load situation four: a three-phase resistive load.
⚫Three-phase power input, among three-phase L1/L2/L3, the power of
phase L1 is adjustable while that of L2/L3 is fixed, and one PT1000

15
temperature sensor for threephase load.
Figure 3-4
Load situation five: a three-phase resistive load and a single-phase
resistive load(automatically switchover between two loads through dry
contact relay)
⚫Three-phase power input, among three-phase L1/L2/L3, the power of
phase L1 is adjustable while that of L2/L3 is fixed. The power of the
single-phase load in phase L1 is adjustable. Two PT1000 temperature
sensor for each load.

16
Figure 3-5
注意
⚫Phase L1 has an adjustable power output mode while phase L2/L3 is a
fixed power output mode. The adjustable power output mode is used for
the PV linkage application,the power output will be adjusted for the
resistive load according to the surplus solar power.
⚫Three temperature sensors are related to the phase L1/L2/L3 separately.
The T1 terminal is related to phase L1, the T2 terminal is related to phase
L2 and the three-phase load, T3 terminal is related to phase L3.

17
◆Installation Check
After the wiring is completed, corresponding inspections are required to ensure
that the equipment will not be damaged due to incorrect wiring, or cause
leakage and endanger personal safety. The following table 3-2 is what needs
to be checked:
No
Inspection
No
Inspection
1
Check L, N positive and negative
connection and in and out direction
4
whether each part of the GroBoost
works well normally after power on
2
Whether the grounding wire is
connected
5
Whether the GroBoost is fixed
well
3
Whether the RS485 D+ and D-
wires are connected reversely
Table 3-2
◆Work Mode
GroBoost has two main working modes:
Smart mode and PV linkage mode. In addition, the mandatory mode can
be triggered by pressing the key.
Smart mode:
The GroBoost will accord to the timing period and the temperature being
set to work, which has 5 groups of settable time periods. During the smart
mode, the device will work based on its rated power, however, the power
output of the phase L1 is a settable.

18
PV linkage mode:
GroBoost can get a real-time power flow through the ShineLink system.By
setting the execution strategy, the GroBoost will automatically work and adjust
its output power when there is a certain power exporting to or importing from
the grid, to make full use of the solar energy and maximize the solar
self-consumption. In addition,there is also a thermal protection function to
guarantee the water temperature during the time period and temperature point
being set when the offline happens or solar energy is insufficient.
Mandatory mode:
Triggered by manual button, and it could enable the GroBoost to work
forcedly, and stop until it reaches the maximum temperature (default
temperature is 65 °C), often being used in an emergency situation. For security,
the maximum duration of mandatory mode is 2 hours by default.
◆Display and Setting
GroBoost has four LED lights and four function buttons, which work with
multiple devices at the same time. The operation condition and mode of the
devices can be monitored and set by the ShineSever or ShinePhone platform,
and can also be achieved through the basic indicator lights and buttons. Each
LED light and button correspond to a load, and the status of LED light will
indicate different working status, as shown in Table 3-3:
Indicator light
Features
Led1
Led1 light is on means the load of phase L1 is working
Led1 light is off means the load of phase L1 is stand
by
Led2
Led2 light is on means the load of phase L2 is working
Led2 light is off means the load of phase L2 is stand
by
Table of contents
Popular Controllers manuals by other brands

Inter-m
Inter-m PMC-6208 Operation manual

Bosch
Bosch MPC 2000 A Product description/Installation manual

ABB
ABB Relion 670 series installation manual

Samson
Samson 5827 Mounting and operating instructions

Hanna Instruments
Hanna Instruments HI 21 Series instruction manual

ProMinent
ProMinent DULCOMETER PH-501 Assembly and operating instructions