manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. GRUP ARGE
  6. •
  7. Relay
  8. •
  9. GRUP ARGE KKNT-2.5 Programming manual

GRUP ARGE KKNT-2.5 Programming manual

This manual suits for next models

2

Other GRUP ARGE Relay manuals

GRUP ARGE RKR Series User manual

GRUP ARGE

GRUP ARGE RKR Series User manual

GRUP ARGE SMART S12 User manual

GRUP ARGE

GRUP ARGE SMART S12 User manual

GRUP ARGE ZMN32 User manual

GRUP ARGE

GRUP ARGE ZMN32 User manual

GRUP ARGE RKR NT-S12 User manual

GRUP ARGE

GRUP ARGE RKR NT-S12 User manual

GRUP ARGE SMART 12 User manual

GRUP ARGE

GRUP ARGE SMART 12 User manual

Popular Relay manuals by other brands

Woodward BU1-DC2 manual

Woodward

Woodward BU1-DC2 manual

ABB SSR32 product manual

ABB

ABB SSR32 product manual

Siemens SIRIUS 3UG4633 operating instructions

Siemens

Siemens SIRIUS 3UG4633 operating instructions

Siemens SIRIUS 3TK2824 A.20 Series Original operating instructions

Siemens

Siemens SIRIUS 3TK2824 A.20 Series Original operating instructions

Shelly Pro Series user manual

Shelly

Shelly Pro Series user manual

GE MVAX 11 Technical manual

GE

GE MVAX 11 Technical manual

ABB RELION REF615R manual

ABB

ABB RELION REF615R manual

Kemo Electronic B197 quick guide

Kemo Electronic

Kemo Electronic B197 quick guide

Seg MRM3 manual

Seg

Seg MRM3 manual

Basler BE1-700C manual

Basler

Basler BE1-700C manual

CD Automation REVEX 2PH 280A user manual

CD Automation

CD Automation REVEX 2PH 280A user manual

ABB SPAJ 142 C User manual and technical description

ABB

ABB SPAJ 142 C User manual and technical description

Ruelco 1S04 Operation manual

Ruelco

Ruelco 1S04 Operation manual

Basler V3E Z1P B2C1F instruction manual

Basler

Basler V3E Z1P B2C1F instruction manual

GE DGP instruction manual

GE

GE DGP instruction manual

Kyongbo Electronics GDR-D01 user manual

Kyongbo Electronics

Kyongbo Electronics GDR-D01 user manual

Eaton easyE4 series Application note

Eaton

Eaton easyE4 series Application note

Siemens BD2-AK03X/FS Series installation instructions

Siemens

Siemens BD2-AK03X/FS Series installation instructions

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.


S

G
GRUPARGE
Dimensions

RAIL MOUNT 35mm
(DIN 50022)
Installation Types
.
the maximum allowable peak current "Ip" must be less than

100 times the rms current of the switched capacitor.
WARNING: DANGEROUS VOLTAGE VALUES MAY CAUSE SHOCK
AND BURNING. In THESE CIRCUMSTANCES, ALWAYS DISABLE
POWER BEFORE INTERVENTION.
DO NOT INTERFERE WITH CONTRACTORS AND DO NOT PRESS THE
POSITION INDICATOR WHEN ENERGY IS IN THE SYSTEM AND THE LOAD IS
LOCKED FUNCTION TEST WITHOUT CONDENSATOR DESARGATION NO
FUNCTION TEST WITHOUT DESARGING.
VERY IMPORTANT NOTE:
For single compensation air coils or 3-phase reactors (coils with magnetic core
and air gap) are not necessary.
When the contactor is used for group (central) compensation we recommend to
use appropriate 3-phase filter circuit reactors (coils with magnetic core and air
gap).
At single compensation the power of selected contactor is according to
capacitors rated power.
At group and central compensation the power of selected contactor has to be
one step higher than-capacftor's rated power (if you don't use reactors).
During exploitation, current value must not exceed the declared values. Use
only HRC fuses gG type for each step for short circuit protection.
Use only halogen free connection wires.
CHANGING THE COIL
C
ABLE SELE
C
TION        
S

G
GRUPARGE 
Dimensions

RAIL MOUNT 35mm
(DIN 50022)
CHANGING THE COIL
       .
the maximum allowable peak current "Ip" must be less than

100 times the rms current of the switched capacitor.
WARNING: DANGEROUS VOLTAGE VALUES MAY CAUSE SHOCK
AND BURNING. In THESE CIRCUMSTANCES, ALWAYS DISABLE
POWER BEFORE INTERVENTION.
DO NOT INTERFERE WITH CONTRACTORS AND DO NOT PRESS THE
POSITION INDICATOR WHEN ENERGY IS IN THE SYSTEM AND THE LOAD IS
LOCKED FUNCTION TEST WITHOUT CONDENSATOR DESARGATION NO
FUNCTION TEST WITHOUT DESARGING.
VERY IMPORTANT NOTE:
For single compensation air coils or 3-phase reactors (coils with magnetic core
and air gap) are not necessary.
When the contactor is used for group (central) compensation we recommend to
use appropriate 3-phase filter circuit reactors (coils with magnetic core and air
gap).
At single compensation the power of selected contactor is according to
capacitors rated power.
At group and central compensation the power of selected contactor has to be
one step higher than-capacftor's rated power (if you don't use reactors).
During exploitation, current value must not exceed the declared values. Use
only HRC fuses gG type for each step for short circuit protection.
Use only halogen free connection wires.
Contactor installation, step: A and B
Contactor removal, step: 1, 2 and 3
Contactor installation, step: A and B
Contactor removal, step: 1, 2 and 3
C
ABLE SELE
C
TION
Installation Types
AUXILIARY CONTACT BLOG ASSEMBLY

AUXILIARY CONTACT BLOG ASSEMBLY

sse

bly

S

ep

sse

bly

S

ep

sse

bly

S

ep

sse

bly

S

ep

sse

bly

S

ep

sse

bly

S

ep

sse

bly

S

ep

sse

bly

S

ep
-
Always cut off the power
before intervening.
- The fuses supplying the contactor must be between 1.6 times and 1.8 times the rated current le(A)/AC-6b.
GR Up AR GE RECYCLABLE C
AUXILIARY CONTACT BLOG ASSEMBLY

sse

bly

S

ep

sse

bly

S

ep

sse

bly

S

ep

sse

bly

S

ep

sse

bly

S

ep

sse

bly

S

ep

sse

bly

S

ep

sse

bly

S

ep

Always cut off the power
before intervening.
-The fuses supplying the contactor must be between 1.6 times and 1.8 times the rated current le(A)/AC-6b..
GR Up AR GE RECYCLABLE
ADDRESS: İkitelli OSB Mah. Environment 14th Block Street. Telas Blok
Exterior Door No: 1 Floor: 1-2 Başakşehir/Istanbul
Telephone: +90 212 438 80 24 (PBX)
Fax +90 212 438 80 25
Technical Support: +90 212 438 61 17
Web: www.gruparge.com; www.enerjitakibi.com
ADDRESS: İkitelli OSB Mah. Environment 14th Block Street. Telas Blok
Exterior Door No: 1 Floor: 1-2 Başakşehir/Istanbul
Telephone: +90 212 438 80 24 (PBX)
Fax +90 212 438 80 25
Technical Support: +90 212 438 61 17
Web: www.gruparge.com; www.enerjitakibi.com
AUXILIARY CONTACT BLOG ASSEMBLY

Follow steps A and B for installation of the upper auxiliary contact block. Follow steps A and B for installation of the upper auxiliary contact block.
Follow steps 1,2 and 3 as shown to remove the upper
auxiliary contact block.
Follow steps 1,2 and 3 as shown to remove the upper
auxiliary contact block.
Follow steps A/A1, B/B1 and C for the
installation of the side auxiliary contact block. Follow steps A/A1, B/B1 and C for the
installation of the side auxiliary contact block.
Follow steps 1,2 and 3 to remove the
auxiliary side contact.
Follow steps 1,2 and 3 to remove the
auxiliary side contact.
Details: C Details: C