
SWAY BRACE
1/4 -20 X 5/8"
HEAD BOLTS,
HEX NUT
FIGURE 6
USE #14 X 5/8
HEX HEAD S.M.S.
FIGURE 7
FIGURE 8
FIGURE 9
Back-to-Back Units
1B.
Assemble post and side sway braces
for (2) units as per step 1. Add post combination
clips as per step 3. Add shelves as per step 2.
Stand units and push together so that post
connectors are in aligment. Bolt back sway braces
to post connector making sure the sway brace is
between post connectors. Figure 6.
2B
. Add additional shleves.
3B
. Add adjoining units as per step 1A & 1B.
Individual & Starting Units
Closed Type
1C
. Assemble (2) post sections by
attaching side panels to post with hex
head S.M.S. on 12" centers. keep panel
1/8" from end of post at the bottom,
Figure 7.
NOTE:
For units over 3'3", multiple side
panels are required. For appearance
sake, place the smallest panel at top.
Place the larger side panel over upper
panel.
2C
. Attach back panel connecting strips to
post with #14 x 5/8 hex head S.M.S. Figure 8.
NOTE:
For 8'3" use (1) and (1) 3' connecting
strips and overlap so that bottom strip is on
top of upper strip.
3C.
Bolt base strip to bottom shelf, Figure 9.
Use (2) 1/4-20 x 1-1/4 truss head bolts and nuts.
NOTE:
Base strips may not be included in every
application.
4C.
Place back panels inside connecting strips
and bolt back panel to connecting strips. Use
1/4-20 x 1/2 truss head bolts and nuts.
NOTE:
Units over 3'3", multiple back panels may be required. Always place
shortest back panel at top and inside lower back panel.
PG. 3