Hanover 9820001-1 User manual

Requires two people and takes urs for lnstallation.
Size:L5 x W10.3 x H6.7 Feet
9820001-1
Metal Garden Shed
OWNER'S MANUAL
Instructions for Assembly
Requires two people and takes 2-3 hours for lnstallation.
Quick & Easy Assembly
Ridge Reinforced Walls
-1-
Metal Garden Shed
OWNER'S MANUAL
Instructions for Assembly
Quick & Easy Assembly
Ridge Reinforced Walls
-1-
9820001-2
Size:L152 x W309 x H203cm
4-5

-2-
BEFORE YOU START
Owner's Manual
Prior to installation, it is important that you contact your local government authority to
determine if building approval is required. Study and understand this owner's manual.
Important information and helpful tips will make your construction easier and more
enjoyable.
Assembly instructions
Instructions are supplied in this manual and contain all appropriate information for your
building model. Review all instructions before you begin. During assembly, follow the
step sequence carefully for correct results .Please be aware: this unit takes two people
about one full day to complete.
Parts
Check to be sure that you have all the necessary parts for the building.
Familiarize
yourself
with
the
hardware
and
fasteners
for
easier
use
during
construction. These are packaged within the carton. Note that extra fasteners have been
supplied for your convenience.
TOOLS MAY REQUIRED
Use heavy duty gloves when handling steel sheets and flashing
PLAN AHEAD
Site Selection
lAvoid overhanging trees as much as possible as leaves will make regular cleaning
necessary and broken branches are a potential hazard.
lSmall trees,bushes or fences nearby can be helpful,acting as a wind break.
Site Preparation
The site must be prepared so that the base of the shed is level all round and checking
with a spirit level is required.
The base can be constructed by treated timber or concrete,in order to stop the moisture
getting into the shed.The shed is not designed to be built onto lawn directly.Also the
ground will get muddy during rainy days.
If a concrete pad is made,it is important that this slopes towards the edges to prevent
water ingress.
Time must be allowed for any concrete or cement to dry before building the shed on top.
Bases can also be constructed from bricks,blocks,or mounted on a concrete pad.
The bricks or blocks should be cemented onto firm and level concrete footings and the
greenhouse frame drilled and screwed to the base.
IMPORTANT NOTES:
lFind someone to help you:it is much easier with someone to hold parts,pass tools
ect.Also some steps require two people to lift structures together.This is not very
heavy work so would suit most able-bodied people.
lAllow plenty of time:rushing often causes errors and the re-doing of incorrect
assemblies.If you have never built a shed before,it can take most of a day to carefully
complete the construction.
lHave the right tools to hand.
lSafety clothing as recommended in the 'Tools' section.
lIdeally lat out the parts and check that all are present before commencing
construction.Lay on cloths or plastic sheets if there is any risk of scratching the parts.
lTighten all nuts carefully,being sure not to miss any.Check the frame is square and
using a spirit level to check that it is upright.
PLAN AHEAD
Watch the weather:
Please be sure the day you select for installation is dry and calm.
DO NOT attempt to assemble your shed in windy weather
because of risk of damage to panels, or personal injury. Be careful
of wet or muddy ground.
Teamwork:
Whenever possible, two or more people should work together to
assemble the building. One person can position parts or panels
while the other is able to handle the fasteners and the tools.
-2-
BEFORE YOU START
Owner's Manual
Prior to installation, it is important that you contact your local government authority to
determine if building approval is required. Study and understand this owner's manual.
Important information and helpful tips will make your construction easier and more
enjoyable.
Assembly instructions
Instructions are supplied in this manual and contain all appropriate information for your
building model. Review all instructions before you begin. During assembly, follow the
step sequence carefully for correct results .Please be aware: this unit takes two people
about one full day to complete.
Parts
Check to be sure that you have all the necessary parts for the building.
Familiarize
yourself
with
the
hardware
and
fasteners
for
easier
use
during
construction. These are packaged within the carton. Note that extra fasteners have been
supplied for your convenience.
TOOLS MAY REQUIRED
Use heavy duty gloves when handling steel sheets and flashing
PLAN AHEAD
Site Selection
lAvoid overhanging trees as much as possible as leaves will make regular cleaning
necessary and broken branches are a potential hazard.
lSmall trees,bushes or fences nearby can be helpful,acting as a wind break.
Site Preparation
The site must be prepared so that the base of the shed is level all round and checking
with a spirit level is required.
The base can be constructed by treated timber or concrete,in order to stop the moisture
getting into the shed.The shed is not designed to be built onto lawn directly.Also the
ground will get muddy during rainy days.
If a concrete pad is made,it is important that this slopes towards the edges to prevent
water ingress.
Time must be allowed for any concrete or cement to dry before building the shed on top.
Bases can also be constructed from bricks,blocks,or mounted on a concrete pad.
The bricks or blocks should be cemented onto firm and level concrete footings and the
greenhouse frame drilled and screwed to the base.
IMPORTANT NOTES:
lFind someone to help you:it is much easier with someone to hold parts,pass tools
ect.Also some steps require two people to lift structures together.This is not very
heavy work so would suit most able-bodied people.
lAllow plenty of time:rushing often causes errors and the re-doing of incorrect
assemblies.If you have never built a shed before,it can take most of a day to carefully
complete the construction.
lHave the right tools to hand.
lSafety clothing as recommended in the 'Tools' section.
lIdeally lat out the parts and check that all are present before commencing
construction.Lay on cloths or plastic sheets if there is any risk of scratching the parts.
lTighten all nuts carefully,being sure not to miss any.Check the frame is square and
using a spirit level to check that it is upright.
PLAN AHEAD
Watch the weather:
Please be sure the day you select for installation is dry and calm.
DO NOT attempt to assemble your shed in windy weather
because of risk of damage to panels, or personal injury. Be careful
of wet or muddy ground.
Teamwork:
Whenever possible, two or more people should work together to
assemble the building. One person can position parts or panels
while the other is able to handle the fasteners and the tools.
sharp edges
3M
1/10"
1/5"
5/16" when assembling or performing.
wear work gloves, long sleeves and eye glasses,
Pay attention to the sharp edges. Please

1
PART
NO. Qty. PART
NO. Qty.
2
1
1
1
1
1
1
1
2
2
2
1
2
6
1
1
2
2
-3-
2
3L
3R
4L
4R
5
6
7L
9
10
12
16
17
18
19
20
21L
21R
PART
NO. Qty.
1372mm/54.01"
1800mm/70.86"
574mm/22.59"
830mm/32.67"
876mm/34.48"
1360mm/53.54"
1516mm/59.68"
356mm/14.01"
1365mm/53.74"
960mm/37.79"
456mm/17.95"
1516mm/59.68"
1754mm/69.05"
22 4
23 1
1728mm/68.03"
35
36
37
1
4
2
1
882mm/34.72"
1728mm/68.03"
7R 1
4
2
2
13
14L
14R
1728mm/68.03"
248mm/9.76"
2
26
1580mm/62.2"
1
1360mm/53.54"
27
1
677mm/26.65"
1
29L
29R
3
34
2
33
1614mm/63.54"
24 2
516mm/20.31"
48
1300mm/51.18"
1
9
1
10
1360mm
1516mm/59.68"
1
1
25L
25R
1
28
2
597mm/23.5"
30
1
31
1516mm/59.68"
2
32
470mm/18.5"
1300mm/51.18"
4
38
574mm/22.59"
1728mm/68.03"
882mm/34.72"
248mm/9.76"
1728mm/68.03"
677mm/26.65"
1372mm/54.01"
1728mm/68.03"
1728mm/68.03"
1728mm/68.03"
1360mm/53.54"
1360mm/53.54"

PART
NO. Qty.
G2
-4-
4
2
GF
GD
GB
GC
GE
4
4
8
2
GS 6
F1
F2
F3
S3
PART
NO. Qty.
P1
P4
P5
P6
8
1
1
1
450
8
45
396
1314mm/51.73"
986mm/38.81"
F4 10
S2 400
P9 8
P2 8
S4
833mm/32.79"
358mm/14.09"
P7 1
PART
NO. Qty.
D2 1
D1 1
P11
P12
P13
1
1
1
1642mm64.64"
P14 1
4
P10 6
458mm/18.03"
P16 1
P17 1
P18 1
PART
NO. Qty.
P15 1
598mm/23.54"
W1
W2
W3
W4
796mm/31.33"
1335mm/52.55"
2
2
4
3
925mm/36.41"
W5
408mm/16.06" 4
#8AB-18x2/13
#8-32x2/13
#8-32x2/13
986mm/38.81"
986mm/38.81"
986mm/38.81"
1642mm64.64"
1642mm64.64"
1642mm64.64"
598mm/23.54"
598mm/23.54"
598mm/23.54"
925mm/36.41"
#10-24x2/13

3R
5
3L
4R
6
7R
7L
4L
9
36
36
36
37
37
P1
P1
P1
P1
P9
P9
P9
P9
P9
P9
P9
P9
P1
P1
P1
P1
22
13
13
18
18
D2
D1
1
9
22
36
1
23
13
20
35
P2
P2
P2
P2
P2
P2
P2
P2
22
22
13
2
21L
21R
14R
14L
16
12
12
14R
14L
21R
21L
29R
29L
34
26
26
27
W5
W5
W5
W5
W4
W4
S4
S4
LEFT EXTENSION
P5
P7
P4
P6
P14
P13
P11
P12
GC
GC
GC
GC
10
10
19
GE
GE
33
17
17
33
-5-

-6-
8
8
8
8
32
32
25L
25R
38
38
24
28
GC
GC
GC
GC
GS
GS
10
30
30
P17
P15
P16
P18
P10
P10
P10
P10
P10
P10
34
34
9
31
24
W4
38
38

B
ⅠⅡⅢ
F1x12
3L x 13Rx 15 x 1
1x22x1
B
B
c
c
D
D
ⅠⅡⅢ
ⅠⅡⅢ
c
12
3R
5
3L
D
1
-7-
Base Assembly

1、When diagonal measurements are equal,the frame is
square.
2、The Floor Frame must be BOTH square AND
level or the holes will not line up properly.
53R
3L
1
1
2
-8-
Base Assembly Inspection

-9-
F4x 7S3 x7
4R x 113 x1
P9 x1P1 x1
F1 F1
4R
3R
4R
13
P9
P1
Pay attention to dumping
Need a person or a shelf to support.
Wall Panels Installation
Install the parts according below order,4R-13-P9-P1

-10-
F1x4S3 x4
22x1
P1
22
F1
22
13
13 x1
Pay attention to dumping
Need a person or a shelf to support.

-11-
F1x8 S3 x822x1
P2
Ⅲ Ⅳ
Ⅰ Ⅱ
22
23
P2
23x 1
P2 x2
Pay attention to dumping
Need a person or a shelf to support.

-12-
F1x8 S3 x8
13 x1
P1 x1
22x2
Ⅲ Ⅳ
Ⅰ Ⅱ
P1
13
22
22
Pay attention to dumping
Need a person or a shelf to support.
Pay attention to dumping
Need a person or a shelf to support.

-13-
F1x13 S3 x13
13x1
P1 x1
Ⅲ
Ⅰ Ⅱ
9
P1
P1
Ⅳ
9
9x1
13
P9
4L
4Lx1
P9 x1
Pay attention to dumping
Need a person or a shelf to support.
F1
F1

-14-
F1x96 S3 x96
P1 x5
Ⅲ
ⅠⅡ
Ⅳ
9
P1
P9
P9
P1
P1
P1
P1
P2
P2
P2
P2
P2
P2
P2 x6P9 x6
P1
9
P9
P9
P9
P9
9x1
Pay attention to dumping
Need a person or a shelf to support.
F4
F4

-15-
21L x 221R x214L x 214R x2F2x12
GF x4
12 x2
x2
x2
21L
21R
14L
14R
GF GF
12
12
B3
21L

Back Triangle Panel Installation
-16-
S3 x8
F1x8
9
20
x2
20 x1
20

-17-
S3 x10
F1x10
G2 x4
7L x17R x1
7R
7L
7L
7R
6
9
7R
x2
6
7L 7R
4R
21L 21R
6x1
G2 x2
7L&7R
Front Trigangle Panel
Installation

16 x1
16
16
F2
12
F2
12
F2x2
-18-
Crossbeam Installation

-19-
13
36
F1
4L
37
23
35
4R
37
35x136x 437x2F1x35 S3 x35
F1
F1
F1

-20-
34
29R
34
29L
29R
W5
W5
W5
W5
W4
S4
S4
W4
29R
W5
W4
W4
S4
F1
F1x8
W4 x 2W5 x 4S4 x2
34 x 1
29Lx 129Rx 1
Base of Left Storage Assembly
This manual suits for next models
2
Table of contents
Other Hanover Outdoor Storage manuals
Popular Outdoor Storage manuals by other brands

CONFORAMA
CONFORAMA AMAZONE Assembling instructions

Backyard Products
Backyard Products Yardline BRAMPTON 10 x 8 Assembly manual

Rowlinson Garden Products
Rowlinson Garden Products LOGSML1 Assembly instructions

Outsunny
Outsunny 845-426V01 Assembly & instruction manual

Yardmaster
Yardmaster 1012 WGL Assembly instructions

USP
USP DURAMAX 10.5 Ft x 13 Ft WoodBridge Plus owner's manual