Hatco 120 User manual

HATO 120 / 200 SECTIONAL DOOR OPERATOR USER’S
MANUAL
2
HATO 120/200
SECTIONAL DOOR OPERATOR
USER’S MANUAL

HATO 120 / 200 SECTIONAL DOOR OPERATOR USER’S
MANUAL
3
OUTLINE
1. Safety instructions................................................4
2. Description and features.....................................4
3. Technical specifications.....................................4
4. Check.................................................................5
5. Installation and adjustment.................................5
6. Programming..................................................... 9
7. External terminal connection.............................12
8. Maintenance..................................................... 13
9. Troubleshooting.................................................13

HATO 120 / 200 SECTIONAL DOOR OPERATOR USER’S
MANUAL
4
1.Safety instructions
Carefully read and follow all safety precaution, warnings before attempting to install and use
this sectional door operator, incorrect installation can lead to severe injury.
•The installation should be carried out by a qualified technician.
•Toavoid electrical shock, disconnect the power cord from the mains power outlet before
doing any repairs or removing the cover.
•Before installing, make sure that the door is in good mechanical condition, the door must
be well balanced. Check that the door operates smoothly and easily.
•Before installing the operator, remove all unnecessary ropes and disable equipment, such
as locks etc..
•The garage door should only be used when in full view of the door.
•No one or vehicle is allowed to enter or leave the garage while the remoter is being
installed, do not allow children to play near the door.
•Locate any fixed control: within sight of door but away from all moving parts of the door
and at a height of more than 1.5m above the ground to avoid children reaching it.
•Install and adjust the manual release so that the handle hangs less than 1.8m above the
floor.
Failure to comply with the instructions above may result in personal injury or property
damage. Our company does not accept responsibility for damage or injury resulting from
installing this operator.
2. Description and features
•The garage door operator is designed for residential overhead sectional and tilt doors. It
operates on 240V AC.
•The operator memorizes the limit positions and unique braking system that slows the unit
down at the end of its travel.
•Smart controller and encoder system. Rolling code transmitter.
•The operator is equipped with a manual release lever which allows manual operation of
the door in case of power failure.
•The controller has a security LOCK function which prevents operation of the door from
transmitter.
3. Technical specifications
Model
HATO 120 / 200
Motor
24V DC 100W / 120W
Open & close force
600/1000N

HATO 120 / 200 SECTIONAL DOOR OPERATOR USER’S
MANUAL
5
Max. door size
8m2 / 12m2
Power Input
220V~240VAC±10% 50Hz
Courtesy light time
3 minutes
Working temperature
-20°C ~ 50°C
Radio frequency
433.92MHz
Transmitter type
Rolling code
Transmitter battery
23A 12V Battery
Bulb
220V~240V 25 watt E14 bulb
4. Check
After receiving the product, you should make an unpack-inspection, in which you should
check whether the product was damaged. If you have any problem please contact dealer.
Note: If the operator is equipped with steel rail, two pieces of connecting brackets are not included.
Fig.1
5. Installation and adjustment
Step1
•Check the door is in good working condition, manually open and close the door to make
sure the door operates smoothly and freely.
•The door must be well balanced.
•Check to see if there is a solid frame in the wall above the center of the door.
•Close the door.
•Mark the centerline of the door using a pencil, and extend the line down to the door
surface, then up the wall above the door.
•Check the installation height of the operator. Slowly open garage door and observe the
highest point of door while moving. Close the door again and mark this highest point on
the wall, mark a horizontal line across the vertical centerline around 40mm above the
Connecting bracket (x2)
Foraluminiumrailonly
Powerhead
bracket (x2)
Wallbracket(x1) Doorbracket(x1)
Aluminiumrailassembly(x1)orSteelrailassembly(x1)
Transmitter (x2)
Larm(x1)
Straightarm(x1)
Powerhead (x1)

HATO 120 / 200 SECTIONAL DOOR OPERATOR USER’S
MANUAL
6
highest point. (Note: there should be 80mm space between this horizontal line to the ceiling.
If there is not enough space, please use the max. height possible to allow the header
bracket to be fitted properly. )
•Fit the header bracket to the wall above the door, the centerline of the door should align with
the centerline of the bracket, The bottom edge of the bracket should align with the horizontal
line. Then fix the header bracket with screws.
Fig.2
Fig.3
Fig.4
Highest point
Highest point
Sectional door
Tilt door
Garage door
Centerline
Horizontal line
Hightest point of
garage door
40mm
40mm

HATO 120 / 200 SECTIONAL DOOR OPERATOR USER’S
MANUAL
7
Step 2
•Aluminium rail (see Fig.5): insert the shuttle into the groove at the end of the rail. Be sure
the release lever on the shuttle faces towards the powerhead. Slide the shuttle along the rail
until it locks into the chain connector.
•Steel rail: the shuttle has been fixed into the rail before delivery.
Fig.5 Aluminium rail
Step 3
•Place the powerhead on the floor, add cardboard packing to protect the powerhead from
scratching by the floor. Attach the powerhead unit to the rail, make sure the spindle is
inserted into the chain drive, then fix the two brackets (see Fig.6 and Fig.7).
Fig.6 Aluminium rail
Fig.7 Steel rail
Step 4
•Close the door.
•Place the operator in the center of the floor. Lift the front end of the rail up to the header
bracket, and fix it to the bracket with pivot pin and R pin.
Shuttle
Powerhead bracket
Aluminium rail
Drive gear
Powerhead unit
Powerhead bracket
Steel rail
Powerhead unit

HATO 120 / 200 SECTIONAL DOOR OPERATOR USER’S
MANUAL
8
Raise and support the powerhead with a ladder and line up the tube with the centerline
marked on the door. The rail must be level.
Fig.8
Step 5
Aluminium rail (See Fig.9): Locate two pieces of connecting brackets and make sure that the
rail is level, then fix the aluminium rail to ceiling with supplied connecting brackets. If
necessary, you also can add two pieces of brackets (not included in accessories) to fasten the
operator firmly. Check the door does not touch any part of the rail by opening or closing it
manually.
Steel rail (See Fig.10): fix the steel rail to ceiling with two pieces of brackets (not included in
accessories).
Connecting bracket
(Suitable foraluminium rail only.)
If necessary, add two pieces
of brackets.
(Not included in accessories.)
Fig.9 Aluminium rail
Pivot pin and R pin
Bracket
(Not included in accessories.)

HATO 120 / 200 SECTIONAL DOOR OPERATOR USER’S
MANUAL
9
Fig.10 Steel rail
Step 6
Fix the door bracket on the top edge of the door with bolts. Link the L arm to the door bracket
with pin and R pin. Link the straight arm to the shuttle with pin and R pin, ensure the door arm
can be moved freely.
Fig.11
Manual operation
If the door has to be operated manually due to a power cut or malfunction of the automated
system, pull the release rope, open and close the door manually. Toreconnect the door, move
the door by hand until it engages into the chain shuttle.
6. Programming
SET button: Mode set and Confirm function
LEARN button: Transmitter set and clear function
UP button: Up limit
DOWN button: Down limit
Fig.12
Adding extra transmitter (learn)
1. Press and hold LEARN, a dot is indicated on the LED display.
2. Press the transmitter button which you want to use (button 1, 2, 4), then press the same
button again.
3. The dot on the LED display will flash then turn off.
Straight arm
L arm
Door bracket

HATO 120 / 200 SECTIONAL DOOR OPERATOR USER’S
MANUAL
10
4. ’||’ is indicated on the LED display, then the learning process is finished.
Up to 20 transmitters may be used.
Fig.13
Erase transmitter
Press and hold LEARN until ’C’ flashes on the LED display. This indicates that all the
transmitters have been erased completely.
Fig.14
Set open and close positions
1. Press and hold SET until number ’1’ is indicated on the LED display.
2. Press and hold UP to set open position, release the button until the door has reached the
desired position. (You also can press DOWN to move the door downward, UP and DOWN
can be used to fine adjust the door position.)
3. Press the SET to confirm the open position, now number ’2’ is indicated on the LED
display.
4. Press and hold DOWN to set close position, release the button until the door has reached
the desired position. (You also can press UP to move the door upward, UP and DOWN
can be used to fine adjust the door position.)
5. Press the SET to confirm the close position.
6. The door will do a complete open and close cycle.

HATO 120 / 200 SECTIONAL DOOR OPERATOR USER’S
MANUAL
11
Fig.15
Automatic close (0~9 minutes adjustable)
1. Press and hold UP until ’─’ is indicated on the LED display.
2. Press UP to increase the auto close time, press DOWN to decrease time.
3. Set timer to ’0’, the automatic close function will disable.
4. Press SET to confirm the setting.
NOTE: Automatic close function is available only when the door is in fully opened
position.
Fig.16
Setting obstruction force
If the door meet an obstruction during closing, it will stop and reverse about 15cm~20cm.
1. Press and hold SET. The LED will display number from ’1’ to ’4’, when the number ’3’
appears on the LED display, release the SET.
2. Press UP to increase the obstruction force, the maximum force is level 9. Press DOWN to
decrease force, the minimum force is level 1.
3. Press SET to confirm.
Fig.17

HATO 120 / 200 SECTIONAL DOOR OPERATOR USER’S
MANUAL
12
LOCK function
•Press and hold SET. The LED will display number from ’1’ to ’4’, when the number ’4’
appears on the LED display, release SET.
•Press UP, number ’1’ will be indicated on LED display, LOCK function enable.
•Press DOWN, number ’0’ will be indicated on LED display, LOCK functiondisable.
•Press SET to confirm.
NOTE: LOCK function is available only when the door is in fully closed position.
After setting LOCK function, the door locked, you need press button 3 of transmitter to
unlock, then press the other buttons to operate the door.
Fig.18
Infrared photocell
•Press and hold DOWN until ’─’ is indicated on the LED display.
•Press UP, ’H’ is indicated on the LED display, infrared photocell is enable.
•Press DOWN, ’||’ is indicated on the LED display, infrared photocell is disable.
•Press SET to confirm.
Fig.19
7. External terminal connection
PB: Wall switch (N.O.)
GND: Ground
PE: Photocell (N.C.)
+24V: 24V DC power output

HATO 120 / 200 SECTIONAL DOOR OPERATOR USER’S
MANUAL
13
Fig.20
8. Maintenance
•Check the door once a month. The door should be carefully checked for balance. The
door must be in good working order.
•The auto-reverse function should be regularly inspected, and adjusted if necessary. For
service, call an experienced serviceman.
•We suggest for safety reasons, photocells be used on all doors.
•Disconnect from mains supply before replacing bulb.
•Be sure to read the entire manual before attempting to perform any installation or service
to the door operator.
•Our company reserves the right to change the design and specification without prior
notification.
9. Troubleshooting
Trouble
Possible causes
Solutions
The door fails to open
and close. LED display
does not light.
1. Power is OFF
2. Fuse blown
1. Make sure that power is ON.
2. Replace fuse.
The door can open, fails
to close.
1. Infrared beam is obstructed.
2.Infrared photocell function is
enable, but the photocell has not
been installed.
1. Remove obstructions.
2.Make sure the infrared
photocell function is disable.
Remote control does not
work.
1. Battery level may be low,
2. Transmitter
1. Replace the battery inside
the transmitter.
2. Re-program the transmitter.
The transmitter operating
distance is too short.
Battery level may be low.
Replace battery.
CONFORMITY DECLARATION:
It’s in accordance with Machine Directive 2006/42/WE and following modify.
It’s in accordance with the following directive CE:
Electromagnetic compatibility Directive 2014/30/UE and following modify.
Low tension Directive 2014/35/UE and following modify.
Radio directive RED 2014/53/UE
Have been applied the following harmonized norms:
EN ISO 12100:2012; EN 60204-1:2010; EN 60335-2-95:2015, EN 301 489-3 V1.4.1:2006; UNI EN 12453:2002,
where applicable EN 12445:2002
Current declaration are available on website
+24V PE GND PB
Phocell receiver
Phocell transmitter
+24V
PE
GND
PB
Wall switch

HATO 120 / 200 SECTIONAL DOOR OPERATOR USER’S
MANUAL
14
DISTRIBUTOR/SALESMAN
Hato Polska S.C
Tomasz Słodkowski – Harmeet Singh
ul. Tunelowa 57
40-676 Katowice
POLAND
Warehouse/sales/service
ul. Żeromskiego 1
41-205 Sosnowiec
tel. 032/ 785-25-42
www.hato.com.pl
This manual suits for next models
1
Table of contents
Popular Door Opening System manuals by other brands

Dormakaba
Dormakaba ORACODE 480 Series installation instructions

Cal-Royal
Cal-Royal 22-3PT installation instructions

Dormakaba
Dormakaba KTV operating & maintenance manual

HAUTAU
HAUTAU ATRIUM comfort close Mounting instructions

Assa Abloy
Assa Abloy Norton 5700 Series installation instructions

D+H
D+H VCD 203 Original instructions

Assa Abloy
Assa Abloy Norton 5630 Series Installation and instruction manual

hawa
hawa Aperto 60/GL Mounting

eku
eku COMBINO 60 H Vorfront Mounting instructions

tau
tau BRINK Series installation manual

SUGATSUNE
SUGATSUNE Zwei L ZL-2402 Installation instruction

Rixson
Rixson ASSA ABLOY 328 installation instructions