
in the desired location against
supply and outlet connections.
If required consult a plumber to
Position the close-coupled pan
the wall and align with water
ensure correct xing and to
leaks after installation.
Draw a line around the base of
Also mark the location of the
These will be used as a guide
base of the pan to clearly mark
the final position.
holes on either side of the pan.
for the oor xings.
Mark the two wall xing holes
that the cistern body is still
Then move the pan carefully
inside the cistern body, ensuring
correctly aligned on the pan.
to one side.
Using a 10mm bit, drill the oor
provided.
and tap in the plastic wall plugs
Locate the wall xing kit and
where the cistern body will be
plugs provided
using a 5mm bit, drill the wall
secured.
Plug these two holes with the
(or more appropriate xings
if required).
location, make plumbing
connections and ensure that
proceeding to stage 14.
always be carried out by a
Return the pan to the desired
they are water tight before
We recommend that this process
professional plumber/installer.
caps to the screw head on
either side of the pan.
Attach the two screw cover
8910
11 12 13
14