Holzhof MAX XM 100 RAP User manual

MAX XM 100 RAP line
assembly instructions
TIME SEQUENCE TO E FOLLOWED:
1. STRUTS AND PLATFORMS 6. ENCH
2. ARCHWAYS 7. ATTACHED SWING
3. PARAPETS 8. ATTACHED GYM
4. SLIDE 9. ROOF
5. CLIM ING OARD 10. UNDERGROUND LAYING/ANCHORAGE OF
STRUCTURE
NOTA ENE: it is recommended to fix the bolts
definitively and only insert the caps once the
correct positioning of the elements has been
verified.
NOTE:
-The colours and models in the image
are purely indicative.
-
The platform can be in engineered wood or
wooden planking.
Article
num.
fixing
CODE N.
NAME
1
2
xpe11
Shaped PE nut protection cap
2
2
xpe10
PE nut protection cap
3
4
xpe116
PE cap
4
4
_
ISO7089 Ø8 washer
5
2
_
UNI7473 M8 self-locking nut
7
2
-
UNI4017 M8X155 HEX SCREW
NOTA ENE: it is recommended to fix the bolts definitively and only insert the caps once the correct positioning of
the elements has been verified.
1. Position the archway between the struts and fix it by inserting: 1 x M8 washer (3), 1 x M8x260 TORX screw (2),
1 x Ø25 mm. winged PE cap (1) into the upper part;
1 x PE nut protection cap (4), 1 x M8 washer (3),
1 x M8x260 TORX screw (2), 1 x PE cap (5) into the lower part.
2. Repeat the operation for the opposite side. Fix
the other archways.
NOTA ENE: it is recommended to fix the
bolts definitively and only insert the caps
once the correct positioning of the
elements has been verified.
1. Position the PE parapet between the struts, resting
the two lower fixing wings on the platform and then
fix using:
4 x M8 washer (3)
4 x M8x80 TEL screw (2) WOOD
4 x M6,3x60 TEFR screw (2) ALUMINIUM
4 x Ø25 winged PE cap
2. If necessary, repeat the operation on the othe
r parapets.
Article num.
Default/
Quantity
NAME
1
1
Aladin tower
2
1
Aladin PE archway
3
1
Curved slide h.84
4
4
IS07089 Ø8 washer
5
4
M8x180 TORX screw
6
4
PE cap
1. After having fixed the PE archway (2), place the body of the curved
slide (3) on the platform of the tower (1) and insert the bolts,
necessary for fixing, into the holes present on the slide (3).
2. Check correct positioning, verticality and parallelism. Fix the
bolts definitively and position the caps.
3. Repeat the operation also on the other side of the
slide
NOTE: COLOURS AND MODELS
REPRESENTED ARE PURELY
INDICATIVE
NOTA ENE: it is recommended to fix the
bolts definitively and only insert the caps
once the correct positioning of the elements
has been verified.
1. Insert the (5) M8x70 threaded bars into the
bushes present on the (6) climbing board.
2. Attach the climbing board (6) by introducing
the threaded bars (5) into the pre-drilled holes in
the platform frame; these were previously fixed
by inserting the PE nut protection cap (4)
M8 washer (3), M8 self-locking nut and
(2) and PE cap (1).
1) 2 x PE cap
2) 2 x M8 self-locking nuts
3) 2 x M8 washer
4) 2 x PE nut protection cap
5) 2 x M8x70 LG* threaded bar
6) 2 x M8x50 AL* threaded bar
7) PE climbing board
*LG: Wood
*AL: Aluminium
1) PE cap (4x)
2) PE nut protection cap (4x)
3) M8 washer (4x)
4) M8x130 TEL screw (4x) LG*
5) M6 3x60 TEFR screw (4x) AL*
6) Assembled bench
NOTA ENE: it is recommended
to fix the bolts definitively and
only insert the caps once the
correct positioning of the
elements has been verified.
*
LG: wood
*AL: aluminium
NOTE:
The models represented are purely
indicative.
These instructions are applicable to
Max, Sultan and Aladin roofs.
1. Position the roof on top of the struts with the brackets positioned as in
figure A.
2. Insert the bolts necessary for fixing in sequence, as indicated in figure .
3. Repeat the operation on all 4 struts.
OLT POSITION
OLTS AND SCREWS:
wood: M8x80 TEL SCREW
aluminium: M6,3x60 TEFR SCREW
Article
num.
Default/
Quantity
CODE N.
NAME
1
1
-
PE roof
2
4
xpe10
PE nut protection cap
3
4
xpe116
PE cap
4
4
_
IS07089 Ø8 washer
6
4
-
M8x80 TEL screw
Proceed with fixing, following the instructions illustrated in the
next pages.
2) Fix the beam to the structure strut
4) Fix the
flower-shaped
gable board in
PE
1) Fix the struts to t
he beam
3) Fix the swing, which
can be the plank, cage
or palm type
NOTA ENE: it is recommended to fix the
bolts definitively and only insert the caps
once the correct positioning of the elements
has been verified.
Article num.
Quantity
CODE N.
NAME
14
M10X1 0 HEX SCREW
4
-
10X110 CUP SQUARE SCREW
31 XPE116 PE CAP
41
_
Ø10 WASHER
54XPE11 SHAPED PE NUT PROTECTION CAP
68XPE10 PE CAP
78
-
M10 SELF-LOCKING NUT
1. Attach the struts to the beam using the relevant
bolts as indicated i
n the figure. Repeat the operation
on all 4 struts.
1. Fix the swing beam to the structure strut using:
1)
4 x PE nut protection cap
2)
4 x M8 washer
3)
2 x M8x115 Hex Screw
4)
4 x PE cap
5)
2 x M8 Self-locking nut
NOTA ENE: it is recommended to fix the
bolts definitively and only insert the caps
once the correct positioning of the elements
has been verified.
Article num.
Quantity
NAME
1
1
Assembled swing body
2
2
UNI4017 M8X25 HEX SCREW
3
2
UNI7473 M8 self-locking nut
1. Attach the assembled swing body to the beam, introducing the
bolts necessary for fixing into the swing
hangers, as indicated in the figure.
NOTE: colours and models represented are purely indicative. The following instructions can also be applied to
swings with iron beams.
Article
num.
Q
uantity
CODE N.
NAME
14XPE116 PE CAP
4
-
M8X80 HEX SCREW OR M6,3X60 SELF-TAPPING SCREW
34
-
08 WASHER
44XPE10 PE NUT PROTECTION CAP
5XPE174 ROTATIONALLY-MOULDED GABLE BOARD IN PE
Wooden struts:
Aluminium struts M8x80 TEL SCREW:
M6,3x60 SELF-TAPPING SCREW
1. Fix the gable board (5) to the struts using the relevant bolts as indicated in the
figure and repeat the operation on the opposite side and for the second gable
board.
NOTE: the models represented are purely indicative.
1. Position the climbing net beam (3) in the housing of the pre-
assembled climbing ladder (4), inserting the bolts necessary
for fixing as in the figure, however without fixing it completely
and without positioning the caps.
NOTA ENE: it is recommended to fix the bolts
definitively and only insert the caps once the
correct positioning of the elements has been
verified.
1) 1 x climbing net strut
2) 1 x rope beam
3) 1 x net beam
4) 1 x climbing ladder
5) 4 x M8x80 TEL SCREW
6) 3 x M8x110 HEX SCREW
7) 4 x PE nut protection cap
8) 6 x shaped PE nut protection cap
9) 10 x M8 washers
10) 3 x M8 self-locking nuts
11) 10 x PE cap
2. Position the climbing rope beam (2) in the housing of the
pre-assembled climbing ladder (10), inserting the bolts
necessary for fixing as in the figure, without fixing it completely
and without positioning the caps.
3. Position the climbing net strut (1) in the housing of the
climbing net beam (2), inserting the bolts necessary for fixing
as in the figure, without fixing it completely and without
positioning the caps.
4. If the structure is t
o be laid underground, position the gym in
the excavation holes made previously as per excavations layout.
Attach the gym to the tower struts by inserting the bolts
necessary for fixing, as indicated in the figure.
1. Position the upper part of the climbing net (1), inserting the bolts necessary
for fixing into the thimbles as indicated the figure, without fixing it completely
and without positioning the caps.
2. Position the climbing rope (6), inserting the bolts necessary for fixing
into the thimbles as indicated the figure, without fixing it completely and
without positioning the caps.
3. Once the correct parallelism and verticality have
been checked, fix all bolts definitively.
4. Position all caps (1).
NOTA ENE: it is recommended to fix the bolts
definitively and only insert the caps once the
correct positioning of the elements has been
verified.
1) 32 x PE cap
2) 32 x M8 washer
3) 13 x shaped PE nut
protection cap
4) 13 x M8 self-locking nuts
5) 1 x climbing rope
6) 1 x climbing net
7) 13 x M8x115 HEX SCREWS
NOTA ENE: it is recommended to fix the bolts
definitively and only insert the caps once the
correct positioning of the elements has been
verified.
ANCHORAGE
UNDERGROUND
climbing rope
-
climbing rope
-
PE cap
M8 self-locking nut
PE washer
PE nut protection cap
PE nut protec
tion
cap
M8 washer
M8x35 HEX screw
PE cap
1. Drill.
2.
Clean the hole thoroughly using an air
pump and small brushes.
3.
Insert the anchor into the hole present on
the bracket with the aid of a hammer.
4. Tighten using
dynamometric wrench.
-M10 self-
locking nut
M10 washer
M10 screw anchor
underground bracket
excavation hole 30x50 cm.
Concrete deck
rubber safety
flooring
1. Excavate a hole with diameter of 30 cm and depth of 60 cm
2. Cast a first layer of concrete with thickness of 10 cm.

Other Holzhof Play Set & Playground Equipment manuals

Holzhof MAX XM 202 RA User manual

Holzhof

Holzhof MAX XM 202 RA User manual

Holzhof OASIS XOA 100 User manual

Holzhof

Holzhof OASIS XOA 100 User manual

Holzhof LINEA ALADIN XA 100 RAP User manual

Holzhof

Holzhof LINEA ALADIN XA 100 RAP User manual

Holzhof LINEA ALADIN XA 100 RP User manual

Holzhof

Holzhof LINEA ALADIN XA 100 RP User manual

Holzhof MAX XM 100 R line User manual

Holzhof

Holzhof MAX XM 100 R line User manual

Holzhof XT 100 Dirondello User manual

Holzhof

Holzhof XT 100 Dirondello User manual

Holzhof SULTAN XS 312 User manual

Holzhof

Holzhof SULTAN XS 312 User manual

Holzhof MAX XM 208 LP PUR User manual

Holzhof

Holzhof MAX XM 208 LP PUR User manual

Holzhof SULTAN User manual

Holzhof

Holzhof SULTAN User manual

Holzhof ALADIN User manual

Holzhof

Holzhof ALADIN User manual

Holzhof MAX XM 100 RP line User manual

Holzhof

Holzhof MAX XM 100 RP line User manual

Holzhof MAX XM 100 LP PUR User manual

Holzhof

Holzhof MAX XM 100 LP PUR User manual

Holzhof MAX XM 209 P User manual

Holzhof

Holzhof MAX XM 209 P User manual

Popular Play Set & Playground Equipment manuals by other brands

Aztec 902-757 Corkscrew Handbook

Aztec

Aztec 902-757 Corkscrew Handbook

BOERPLAY BBPE110.5AP manual

BOERPLAY

BOERPLAY BBPE110.5AP manual

Vuly Mini manual

Vuly

Vuly Mini manual

Rompa Stepping Stones manual

Rompa

Rompa Stepping Stones manual

Ledon Explore Tobi Assembly instructions

Ledon

Ledon Explore Tobi Assembly instructions

TP Explorer Jungle Run Instructions for assembly, maintenance and safe use

TP

TP Explorer Jungle Run Instructions for assembly, maintenance and safe use

Community Playthings A692 Product guide

Community Playthings

Community Playthings A692 Product guide

OLT 6x6 Little Cedar Playhouse Assembly manual

OLT

OLT 6x6 Little Cedar Playhouse Assembly manual

stilum Ascendo 1B Mounting instructions

stilum

stilum Ascendo 1B Mounting instructions

Sove 16-100-100 Assembly instructions

Sove

Sove 16-100-100 Assembly instructions

Ledon 302180 Assembly instructions

Ledon

Ledon 302180 Assembly instructions

NOVUM 3311MP manual

NOVUM

NOVUM 3311MP manual

Quadro mdb My first Homelike Construction manual

Quadro mdb

Quadro mdb My first Homelike Construction manual

Tiny Love Gymini Under the Sea Instruction guide

Tiny Love

Tiny Love Gymini Under the Sea Instruction guide

Ledon 300005 Assembly instructions

Ledon

Ledon 300005 Assembly instructions

stilum Altus2 flower Mounting instructions

stilum

stilum Altus2 flower Mounting instructions

LAPPSET FLORA Installation instruction

LAPPSET

LAPPSET FLORA Installation instruction

BOERPLAY 255E304.03K.001 installation instructions

BOERPLAY

BOERPLAY 255E304.03K.001 installation instructions

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.