
Installation:
Reference Fig. 1 for visual guide
1. Remove all parts from packaging.
2. Remove plastic cover from the Sediment Pre-filter 2b .
3. Remove the red transport cap on the Distributor.
4. Hand tighten the top loading Pre-filter Housing 2a
onto the
Distributor until you feel no further movement.
5. Unscrew the Pre-filter housing cap and drop in the sediment
Pre-filter. Hand tighten the top cap until you feel no further
movement.
6. Insert 3/4” 90s Connector 3b to the inlet port (marked “In”)
of the Distributor. Insert the 3e Connector Lock into two slots
located on the inlet port to lock the connection.
7. Insert 3/4” 90s Connector 3c to the outlet port (marked “Out)
of the distributor. Insert the Connector Lock 3e into two slots
located on the inlet port to lock the connection.
8. Cut into main plumbing line leaving enough space to connect
the 3-Way Compression Valves 3a
.
9. Install the “blue” lever Compression Valve 3a
closest to the
incoming water line. Using PEX piping, connect one side of
pipe to the “blue” lever Compression Valve 3a
and the other
side to the filter inlet port, tighten with crimp rings.
10. Connect PEX piping to the outlet port, tighten with crimp
rings.
11. Using PEX piping and 3d Brass 90s Connector run plumbing
to second “red” lever Compression Valve 3a
.
12. Turn main water supply back on slowly and carefully check
for leaks.