1. General information
With the purchase of this system you have made a
decision for a modern and economical heating sys-
tem. Continuous quality control and enhancements,
as well as function tests in the factory, guarantee a
technically flawless device.
Please carefully read these documents. They con-
tain important information for the safe and thrifty op-
eration of the system.
Safety instructions
Installation and service work can - due to the high
system pressures, high temperatures and live elec-
trical parts - be associated with hazards and may
only be performed by specialists. Heat pumps may
only be installed by capable specialists and only put
into operation by specialists who have been special-
ly trained by Hoval for this purpose. Power supply to
the system should be switched off when work is be-
ing performed on the heat pumps and safeguarded
against inadvertent reswitching. Moreover, all safety
instructions in the respective documents, as well as
on adhesive labels on the heat pumps themselves
and in other applicable safety regulations, must be
observed.
Heating system
Control water level
Control the water level of the heating system regurarly
following the instructions described on page 41.
Sound Emissions
The Hoval Belaria®heat pump runs exceptionally
smooth, thanks to its engineering design. Neverthe-
less, it is important that the heating room is located
as far away from noise-sensitive living areas and
closed off with a tightly sealing door.
Drying out of buildings or respectively the heat-
ing of screed
The heat pump is not designed for the increased
heat requirement necessary for drying out buildings
or respectively the heating of screed. For safety rea-
sons the compressor is switched off with return tem-
peratures below +18°C. The drying out of buildings
must be accomplished by other on-site devices as
needed.
Service and Maintenance
Regularly scheduled maintenance and the examina-
tion and care of all important system parts ensures
safe and thrifty system operation in the long run.
We therefore recommend concluding a service and
maintenance contract with Hoval Customer Service
for this purpose.
Cleaning
If necessary, the Belaria®heat pump can be cleaned
with a damp cloth. The usage of cleaning agents is
not recommended. The condensate discharge must
be checked periodically for blocking and the evapo-
rator for soiling.
Installation of Additional Components
The installation of additional components which
have not been tested as a part of the system can
cause functional impairment. Hoval will assume no
warranty or liability coverage for any resultant dam-
ages.
Installation location
• Sufficient air supply must be provided (according
to EN 378 part 1-4)
• No heavy dust accumulation
• No permanently increased humidity (below 50%
r.h. at a room temperature of 18°C
• Frost protection
Outside Installation
The installation place must be carefully selected.
The following boundary conditions must be kept:
• The installation place should be selected in such
a way that air intake and outlet is not hampered or
obstructed by snow, leaves etc.
• There should be provided sufficient space for in-
take and outlet as well as for operation and main-
tenance.
• Air short-circuit must be avoided.The space neces-
sary for intake and outlet must be always provided.
The minimum distances apply only to the indicated
example. Under unfavourable conditions (e.g. air
short-circuit because of wind influence) the heat
pump should be provided with a bilateral blow.
• Intake air must be completely free from aggressive
substances like ammonia, sulphur, chlorine etc.
• The installation place should not be situated un-
der the living room or bedroom because of sound
emission and be placed at sufficient distance from
the neighbouring building. (elaborate calculation)
• Is not recommended to install the heat pump into
wall niches (air short-circuit, sound echo).
3
4 208 844 / 02 General information