Huawe SUN2000-33KTL User manual

HUAWEI TECHNOLOGIES CO., LTD.
SUN2000-(33KTL, 40KTL)
Quick Installation Guide
Issue: 05
Part Number: 31507079
Date: 2015-11-21

1
1 System Installation
Vertical Backward Forward Horizontal Upside down
Inverter Model
SUN2000-33KTL
SUN2000-40KTL
Weight
50 kg
Dimensions (H x W x D)
770 mm x 550 mm x 270 mm
Installation dimensions Chassis dimensions
Copyright © Huawei Technologies Co., Ltd. 2015. All rights
reserved.
Determining the Installation Position (Unit: mm)
1.1
In a vertical support, install the device vertically or with a backward tilt of no more than 15 degrees.
1. The information in this document is subject to change without notice. Every effort has been
made in the preparation of this document to ensure accuracy of the contents, but all statements,
information, and recommendations in this document do not constitute a warranty of any kind,
express or implied.
2. Before installing the device, read the SUN2000-(33KTL, 40KTL) User Manual for knowledge of
product information and safety precautions. To obtain the user manual, log in to
http://support.huawei.com/carrier/ and browse or search for SUN2000 on the Product Support
page.
3. Install and use the device according to this document and the user manual. Otherwise, the
device may be damaged. Use insulated tools when installing the device.
NOTICE
NOTE
Determining the Installation Mode
1.2

2
1. The anti-theft lock is prepared by the customer.
2. For details about how to wall-mount the device, see the SUN2000-(33KTL, 40KTL) User Manual.
1. Determine the hole positions on the support
based on rear panel dimensions. 2. Drill holes.
4. Mount the inverter on the rear panel.
6. (Optional) Install an anti-theft lock.
M12 (3 PCS)
45 N·m
3. Secure the rear panel.
5. Tighten hexagon bolts.
Unit: mm
Installing an Inverter (Support-mounting Used as an Example)
1.3
NOTE

3
Inverter Model
Cable Type
Cross-sectional Area of the
Cable (Recommended)
SUN2000-33KTL
4-core outdoor cable (L1, L2, L3, N)
16 mm2or 6 AWG
SUN2000-40KTL
3-core outdoor cable (L1, L2, L3)
The table lists only the recommended cable specifications. For more information about cable
specifications, see the SUN2000-(33KTL, 40KTL) User Manual.
2 Electrical Connection
M6 (1 PCS)
5 N·m
1. Remove the two screws from the chassis door using a hex key and set them aside.
1. Do not open the door on the upper side of
the inverter.
2. Before opening the chassis door, switch off
the upstream DC input circuit breaker and
downstream AC output circuit breaker.
OT-M6
Installing a PGND Cable
2.1
OT-M6
Installing AC Output Power Cables
2.2
OT-M6
PE terminal
1. It is recommended that an 8 mm2or 8 AWG
outdoor copper-core cable be used as a ground
cable. Ground cables must be securely
connected.
2. It is recommended that the ground cable be
connected to a nearby ground position. For a
system with multiple inverters connected in
parallel, connect the ground points of all
inverters to ensure equipotential connections.
3. To prevent corrosion, apply silica gel or paint to
the PE terminal after connecting the PGND
cable.
NOTE
NOTE
NOTICE

4
2. Open the chassis door and install the support
rod available in the fitting bag bound to the
reinforcing rib at the base of the chassis.
3. Remove the AC terminal cover.
4. Remove an appropriate length of the jacket and insulation layer from the AC output cable using
a wire stripper.
7. Remove the locking cap from the AC OUTPUT waterproof cable connector at the inverter
bottom and remove the plug from the locking cap.
6. Wrap the wire crimp area with heat shrink tubing or PVC insulation tape.
8. Route the AC output power cable into the locking cap and the AC OUTPUT connector at the
inverter bottom.
5. Insert the exposed core wires into the crimp area of the OT terminal and crimp them using
hydraulic pliers.
If heat shrink tubing is used, put it through the power cable and then crimp the OT terminal.
NOTE
a. SUN2000-33KTL
b. SUN2000-40KTL
The AC output power cable for the SUN2000-33KTL is a 4-core outdoor cable (L1, L2, L3, and
N). The AC output power cable for the SUN2000-40KTL is a 3-core outdoor cable (L1, L2, and
L3).
NOTE

M6 (4 PCS)
4 N·m
9. Connect the wires of the AC output cable for the SUN2000-33KTL to L1, L2, L3, and N on the
AC terminal block. The required torque is 4 N·m. Connect the wires of the AC output cable for
the SUN2000-40KTL to L1, L2, and L3 on the AC terminal block. The required torque is 8 N·m.
10.Use a torque wrench to tighten the locking cap to a torque of 7.5 N·m.
Ensure that the AC output power cable is securely connected. Otherwise, the inverter may fail to
run or the terminal block may be damaged after the inverter operates.
NOTICE
5
M8 (3 PCS)
8 N·m
a. SUN2000-33KTL b. SUN2000-40KTL
Positive and negative metal terminals
Optional DC input terminals
Negative metal terminal (male)
Positive metal terminal (female)
Number of
Inputs
SUN2000-33KTL/40KTL
1
Connects to any one route
2
Connects to routes 1 and 3
3
Connects to routes 1, 3, and 5
4
Connects to routes 1, 2, 3, and 5
5
Connects to routes 1, 2, 3, 4, and 5
6
Connects to routes 1, 2, 3, 4, 5, and 6
Routes 1, 2, 3, 4, 5, and 6 are defined
from left to right.
NOTE
Installing DC Input Power Cables
2.3

6
1. Before connecting DC input power cables, mark the polarities on the cables to ensure that the
cables are connected correctly. If the cables are connected incorrectly, the device may be
damaged.
2. Check that DC input power cables will not be disconnected by pulling them.
3. If DC input power cables are reversely connected and the DC switch is ON, do not turn off the
DC SWITCH immediately. Otherwise, the equipment may be damaged. You can disconnect the
DC input power cable on the PV string side or wait until the PV string voltage reduces to a value
within the safety range. Then, turn off the DC SWITCH, remove the positive and negative
connectors, and rectify the connection.
NOTICE
Positive connector
Negative
connector
Positive metal terminal
Negative metal terminal
Common PV cables with a
cross-sectional area of 4 mm²
are recommended.
Ensure that cables cannot
be removed after crimped.
Recommended: H4TC0001
(Amphenol)
Click
Ensure that the
locking nut is
secured.
Recommended: H4TW0001
(Amphenol)
2.4
Model
Communication Mode
Remarks
RS485
PLC
SUN2000-33KTL
(with PLC)
Supported
Supported
1. Only one communications mode can be
selected in application scenarios.
2. If the PLC communications mode is selected,
no device installation is required.
SUN2000-40KTL
(with PLC)
Supported
Supported
SUN2000-33KTL
(without PLC)
Supported
Not
supported
None.
SUN2000-40KTL
(without PLC)
Supported
Not
supported
None.
Selecting a Communication Mode

7
Installing RS485 Communications Cables
2.5
1. When routing communications cables, ensure that communications cables are separated from
power cables and away from interfering source to prevent communication from being affected .
2. RS485 Communications cables can be connected to the terminal block or RJ45 ports.
Connecting to the terminal block is recommended.
1. Remove an appropriate length of the insulation layer from the cable using a wire stripper.
Method 1: Connecting to the Terminal Block (Recommended)
The DJYP2VP2-22 2*2*1 network cable or a communications cable with a cross sectional area of
1 mm2and external diameter of 14-18 mm is recommended.
2. Remove the locking caps from the COM1 and COM2 waterproof cable connectors at the inverter
bottom and remove the plugs from the locking caps.
3. Route the cables through the locking caps and the COM1 and COM2 connectors at the inverter
bottom.
4. Connect the input end to terminals 5 and 7 in the
terminal block and connect the output end to
terminals 6 and 8 in the terminal block.
6. Use a torque wrench to tighten the locking caps to a torque of 7.5 N·m.
To ensure good sealing, you are advised to apply firestop putty to the used waterproof cable
connectors at the bottom of the chassis.
NOTICE
NOTE
5. Bind the RS485 communications cables.

No.
Color
Pin Definition
1
White-orange
RS485A, RS485 differential signal +
2
Orange
RS485B, RS485 differential signal -
3
White-green
PGND
4
Blue
RS485A, RS485 differential signal +
5
White-blue
RS485B, RS485 differential signal -
6
Green
PGND
7
White-brown
PGND
8
Brown
PGND
1. Insert the wires of the network cable to
the RJ45 connector in sequence.
Method 2: Connecting to RJ45 Ports
Recommended outdoor network cable: cable
outer diameter < 9 mm;internal resistance ≤
1.5 ohms/10 m.
1. Block the unused RS485 ports with waterproof plugs.
2. To ensure good sealing, you are advised to apply firestop putty to the used waterproof cable
connectors at the bottom of the chassis.
8
3. Remove the locking cap from the COM1 waterproof cable connector at the inverter bottom and
remove the plug from the locking cap.
4. Route the cables through the locking cap and the COM1 connector at the inverter bottom.
5. Connect the RJ45 connectors to the RS485 IN and
RS485 OUT ports in the SUN2000 maintenance area.
7. Use a torque wrench to tighten the locking cap to a torque of 7.5 N·m.
2. Crimp the connectors using a crimping tool.
NOTE
6. Bind the RS485 communications
cables.

3 Installation Verification
9
1. The SUN2000 is installed correctly and securely. Yes □No □
2. All screws, especially the screws used for electrical connections, are
tightened. Yes □No □
3. All circuit breakers are switched to OFF. Yes □No □
4. Ground cables are connected correctly and securely, with no open circuit or
short-circuit. Yes □No □
5. AC output power cables are connected correctly and securely, with no open
circuit or short-circuit. Yes □No □
6. DC input power cables are connected correctly and securely, with no open
circuit or short-circuit. Yes □No □
7. The DC input voltage is not higher than 1000 V and meets the local voltage
range requirements. Yes □No □
8. RS485 communications cables are connected correctly and securely. Yes □No □
9. Idle DC input terminals are sealed. Yes □No □
10.Idle USB and RS485 ports and waterproof connectors are plugged with
waterproof plugs. Yes □No □
4 System Power-on
1. Switch on the AC circuit breaker between the inverter and the power grid.
2. Set the DC SWITCH at the bottom of the inverter to ON.
3. (Optional) Measure the temperatures at the joints between the DC terminals and the connectors
using a thermometer.
4. Observe the LED indicators to check the inverter operating status.
Indicator
Status
Meaning
PV connection
indicator
Steady green
At least one PV string is properly connected,
and the DC voltage exceeds 200 V.
Off
The inverter is disconnected from all PV strings.
Grid-tie indicator
Steady green
The inverter is grid-tied.
Off
The inverter is not grid-tied.
Communication
indicator
Blinking green (on for 0.5s
and off for 0.5s)
The inverter is communicating properly.
Off
The inverter has failed to communicate.

Indicator
Status
Meaning
Alarm/
Maintenance
indicator
Alarm state
Blinking red slowly (on
for 1s and then off for 4s)
The inverter has generated a warning.
Blinking red fast (on for
0.5s and then off for 0.5s)
The inverter has generated a minor
alarm.
Steady red
The inverter has generated a major
alarm.
Local
maintenance
state
Blinking green slowly (on
for 1s and then off for 1s)
Local maintenance is in progress.
Blinking green fast (on
for 0.125s and off for
0.125s)
Local maintenance has failed.
Steady green
Local maintenance is successful.
5 SUN2000 APP
1. The SUN2000 application is a mobile application that enables the SUN2000 to communicate
with the SUN2000 monitoring system through a USB cable or Bluetooth module to query alarms,
configure parameters, and perform routine maintenance. The mobile application is a convenient
platform for monitoring and maintenance. The mobile application name is SUN2000.
2. Mobile operating system: Android 4.0 or later.
3. Access the Huawei app store (http://appstore.huawei.com) or Google Play
(https://play.google.com), search for SUN2000, and download the SUN2000 APP software
package.
4. The SUN2000 communicates with its mobile application through a USB cable or Bluetooth
module connected over the USB port.
Login screen Switch between users Main menu Quick settings
10
NOTE

1. Tap to return to the login screen.
2. Inverter grid connection setup requires no parameter setting by default. The parameters can be
adjusted based on site requirements. For parameter settings, see the SUN2000-(33KTL, 40KTL)
User Manual.
11
The initial password for Common User, Advanced User, and Special User is 000001 or 00000a.
Use the initial password to log in to the inverter for the first time and change the password
immediately to ensure account security.
NOTE
NOTICE

No. Power Grid
Standard Code Country and
Condition No. Power Grid
Standard Code Country and
Condition
1 NB/T 32004 China low-voltage
power grid 2 VDE-AR-N-4105 Germany low-voltage
power grid
3 EN50438-NL Netherlands low-
voltage power grid 4 BDEW-MV Germany medium-
voltage power grid
5 UTE C 15-712-
1(A) France low-voltage
power grid 6 EN50438-CZ Czech Republic low-
voltage power grid
7 UTE C 15-712-
1(B) Islands of France
230 V 50 Hz 8 TAI-PEA Thailand low-voltage
power grid (PEA)
9 UTE C 15-712-
1(C) Islands of France
230 V 60 Hz 10 TAI-MEA Thailand low-voltage
power grid (MEA)
11 NRS-097-2-1 South Africa low-
voltage power grid 12 VDE 0126-1-1-
GR(A) Mainland of Greece
low-voltage power grid
13 KOREA South Korea low-
voltage power grid 14 VDE 0126-1-1-
GR(B) Islands of Greece low-
voltage power grid
15 G59-England England 230 V
power grid (I > 16
A) 16 RD1699 Spanish low-voltage
power grid (Pn < 100
kW)
17 G59-Scotland Scotland 240 V
power grid (I > 16
A) 18 RD661 Spanish low-voltage
power grid (Pn > 100
kW)
19 G83-England England 230 V
power grid (I < 16
A) 20 VDE 0126-1-1-BU Bulgaria low-voltage
power grid
21 G83-Scotland Scotland 240 V
power grid (I < 16
A) 22 AS4777 Australia low-voltage
power grid
23 CEI0-21 Italian low-voltage
power grid 24 EN50438-TR Turkey low-voltage
power grid
25 CEI0-16 Italian medium-
voltage power grid 26 C10/11 Belgium low-voltage
power grid
27 Philippines Philippines low-
voltage power grid 28 Custom(60Hz) Reserved
29 IEC61727 IEC low-voltage
power grid 30 Custom(50Hz) Reserved
31 IEC61727-60Hz IEC low-voltage
power grid (60 Hz)
Appendix 1: Power Grid Standard Code Mapping Table (SUN2000-33KTL)
12

Grid codes are subject to change. The listed codes are for your reference only.
NOTE
For more information, refer to the channels provided on the following page.
Appendix 2: Power Grid Standard Code Mapping Table (SUN2000-40KTL)
No. Power Grid
Standard Code Country and
Condition No. Power Grid
Standard Code Country and Condition
1 CHINA-MV480 China medium-
voltage power grid 2 Philippines-
MV480 Philippines medium-
voltage power grid
3 EN50438-TR-
MV480 Turkey medium-
voltage power grid 4 BDEW-MV480 Germany medium-voltage
power grid
5 UTE C 15-712-1-
MV480 France medium-
voltage power grid 6 G59-England-
MV480 UK 480 V Medium-voltage
power grid (I > 16 A)
7 Japan(50Hz) Japan power grid (50
Hz) 8 TAI-PEA-MV480 Thailand medium-voltage
power grid (PEA)
9 Japan(60Hz) Japan power grid (60
Hz) 10 TAI-MEA-
MV480 Thailand medium-voltage
power grid (MEA)
11 NRS-097-2-1-
MV480 South Africa medium-
voltage power grid 12 AS4777-MV480 Australia medium-voltage
power grid
13 IEC61727-MV480 IEC medium-voltage
power grid(50 Hz) 14 EN50438-DK Denmark medium-voltage
power grid
15 IEC61727-60Hz-
MV480 IEC medium-voltage
power grid(60 Hz) 16 C11/C10-MV480 Belgium medium-voltage
power grid
17 Custom-
MV480(50Hz) Reserved 18 Custom-
MV480(60Hz) Reserved
13

14
Scan here for more documents:
You can also log in to Huawei technical support website:
http://support.huawei.com
Support
Scan here for technical support (carrier):
Apple Store Huawei App Store
Huawei Technologies Co., Ltd.
Huawei Industrial Base, Bantian, Longgang
Shenzhen 518129 People's Republic of China
www.huawei.com
WeChat
Google Play
This manual suits for next models
1
Table of contents
Popular Inverter manuals by other brands

ALDI
ALDI Workzone Titanium+ 62007 user manual

SMA
SMA SUNNY BOY 3000-US installation guide

SunSynk
SunSynk ECCO SUN-3K-SG04LP1-24-EU user manual

Lenze
Lenze i750 Translation of the original operating instructions

GMDE
GMDE Powervortex 306KTL user manual

CHNT Power
CHNT Power CPS SC500KTL Installation and operation manual

Siemens
Siemens SINAMICS G120C operating instructions

Growatt
Growatt 3-10KTL3-XH quick guide

Fairland
Fairland TurboSilence IXCR26V manual

Westerbeke
Westerbeke 29.0 EGED 60Hz Operator's manual

KIMO RHVAC Controls
KIMO RHVAC Controls FrigoPack E FU+/12 quick start guide

THOR
THOR TH225 Instruction manual and warranty information