manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. IBC
  6. •
  7. Boiler
  8. •
  9. IBC P-749B Quick start guide

IBC P-749B Quick start guide

NOTE
These instructions are to be closely followed, and referenced to the
details in the boiler’s current certified Installation and Operating
Instruction Manual.
WARNING
For your safety, turn off electrical power supply at service panel and allow unit to cool before proceeding. Failure to do
so can cause severe personal injury or death. The ability to properly perform service on this equipment requires
certain expertise, mechanical skills, tools, and equipment. If you do not possess these, do not attempt to perform any
service on this equipment. A failure to follow this warning could result in possible damage to this equipment, serious
personal injury, or death.
NOTE
Installing and servicing boiler
equipment, parts and
accessories, can be
hazardous due to gas and
electrical components.
Only trained personnel
should install or service
heating equipment.
When working on boiler
equipment, observe
precautions in the literature,
on tags, and on labels
attached to the unit.
www.ibcboiler.com120-297B Page 1 of 4
When to Install the P-749B Controller Replacement
Kit
The P-749B DC / HC series boiler / water heaters Controller
replacement kit supports all models of the DC / HC series.
The controller must be configured to operate with the
boiler model.
If the old controller shows signs of corrosion or water
damage, care must be taken to identify and correct the
water source before proceeding with this replacement. If
combustion air condensation has caused water damage to
the boiler / water heater, contact your IBC representative
about part number 250-868, Deflector Shield, before
installing a replacement control board.
Tools Needed
Philips screwdriver
Small flathead screwdriver
Needlenose Pliers
Figure 1: P-749B DC / HC Controller
Replacement Kit
1- Replacement Controller, 500-115A
1- Instructions, IBC part 120-297
Table 1: Boiler / Water heater models using this kit
PART BOILER MODELDESCRIPTION
DC Series – All Models
HC Series – All Models
Controller Replacement KitP-749B
Better
Boilers
INSTRUCTIONAL
NOTE
P-749B Controller Replacement Kit
DC / HC Series (All Models)
Note: the previous version of this kit, P-749, predated models DC/HC 15-95 and DC/HC
15-96. Only the P-749B (software version 2.10) can replace a board for a 15-95 or 15-96.
www.ibcboiler.com120-297B Page 2 of 4
How to Install the P-749 Controller
1. Retrieve and record any settings desired from the old controller, if possible. Enter Installer
Setup mode as per step 13 below. Settings can be recorded in the column provided in Fig. 3.
2. Remove any call for heat, and remove power from the boiler / water heater.
3. Remove cabinet front door panel.
4. Pull forward the bottom tray which holds the controller.
5. Disconnect the electrical connections from the old board: the three white plugs require
unlatching their clips to be lifted out. The green terminal strips can be removed by pulling
upward. Needlenose pliers are recommended for removing the five ground connectors.
6. Note that the entire tray can now be easily removed from the boiler if desired. Undo and
set aside for re-use the two Phillips screws on the underside of the controller tray. Remove old
controller from tray.
7. Place the replacement board in the original board’s position, so buttons are centred in their
holes and mounting holes align. Install the two screws for the board chassis. Confirm that the
front panel buttons engage with the new controller (you should feel and hear that the buttons
click when pressed).
8. Reinsert boiler tray if necessary. Attach the grounding wires, terminal strips and plugs as
the original board was wired. Make sure plugs are fully engaged.
9. Close the tray, power up the board and wait ten seconds. The board will display dashes.
10. Press the service button [wre and the reset buttons con] simultaneously to get zeros in the
Main and Service windows. Press the + button below the main window repeatedly until a “25”
is displayed. Press the service button once to enter Model Setup menu.
11. The main window will display “PA”; by pressing the + button, choose the appropriate PA
type according to the model of the boiler. See Figure 2. Save the choice by pressing the Reset
button . A “P” will display for about 5 seconds.
12. The boiler controller is now set up for the correct model. The final step will be to enter
operational parameters in the User and Installer menus. The user menu is accessible simply by
pressing the Thermometer icon for two seconds. The LED by the radiator icon indicates
the +/- buttons can be used to adjust the Space Heating water temperature (see publication
DC /HC Controller Manual for more information). Toggle to enter the DHW temperature setup.
Saving changes is done by pressing the Reset button .
13. Enter the Installer menus by pressing the service on] and the reset buttons [on]
simultaneously to get zeros in the display windows. Press the + button until a “15” is displayed
in the Main window. Press the service button to enter Parameter1, System Type. See
Figure 3 for a complete list of parameters. A column is provided for the Installer to record
settings. Use the service button to scroll through the parameters, the +/- buttons to
adjust values, and the Reset button to save all changes. If further information is required
see the IBC publication DC / HC Controller Manual.
Note: after installation, upon powering up the boiler, the board will briefly display r 2.10 and a PA x-.
This is the software revision number and the first digit of the selected PA type .
Better
Boilers
INSTRUCTIONAL
NOTE
P-749 Controller Replacement Kit
DC / HC Series (All Models)
Figure 2: Parameter
Types by Model
PA 46DC 33-124
PA 45HC 33-124
PA 44DC 29-106
PA 43HC 29-106
PA 42DC 23-84
PA 41HC 23-84
PA 31HC 13-50
PA 22DC 33-160
PA 21HC 33-160
PA 12DC 20-125
PA 11HC 20-125
PA 62DC 15-96
PA 61HC 15-96
PA 52DC 15-95
PA 51HC 15-95
www.ibcboiler.com120-297B Page 3 of 4
Better
Boilers
INSTRUCTIONAL
NOTE
Figure 3: User and Installer Setup Menus
P-749 Controller Replacement Kit
DC / HC Series (All Models)
INSTALLER’S
RECORD
www.ibcboiler.com120-297B Page 4 of 4
IBC Technologies Inc.
8015 North Fraser Way
Burnaby, BC
Canada V5J 5M8
Toll Free: 1.844.432.8422
Tel: 604.877.0277
Fax: 604.877.0295
www.ibcboiler.com
120-297-A-R2
89007702
April 2018
© IBC Technologies Inc. 2018

Other IBC Boiler manuals

IBC SL 40-399 G3 User manual

IBC

IBC SL 40-399 G3 User manual

IBC SL 10-85 G3 Owner's manual

IBC

IBC SL 10-85 G3 Owner's manual

IBC SL SERIES Installation instructions

IBC

IBC SL SERIES Installation instructions

IBC SL SERIES Guide

IBC

IBC SL SERIES Guide

IBC CX Series User manual

IBC

IBC CX Series User manual

IBC SFC-99 User manual

IBC

IBC SFC-99 User manual

IBC DC Series User manual

IBC

IBC DC Series User manual

IBC VX Series Installation instructions

IBC

IBC VX Series Installation instructions

IBC SL 30-175 User manual

IBC

IBC SL 30-175 User manual

IBC EX Series User manual

IBC

IBC EX Series User manual

IBC HC 33-124 User manual

IBC

IBC HC 33-124 User manual

IBC SL 14-115 G3 User manual

IBC

IBC SL 14-115 G3 User manual

IBC EX Series User manual

IBC

IBC EX Series User manual

IBC VX 110 User manual

IBC

IBC VX 110 User manual

IBC EX 850 Guide

IBC

IBC EX 850 Guide

IBC VFC 15-150 Instruction Manual

IBC

IBC VFC 15-150 Instruction Manual

IBC SL 35-199 User manual

IBC

IBC SL 35-199 User manual

IBC EX Series Installation instructions

IBC

IBC EX Series Installation instructions

IBC SL 10-85 G3 User manual

IBC

IBC SL 10-85 G3 User manual

IBC SFC-199 User manual

IBC

IBC SFC-199 User manual

IBC HC Series User manual

IBC

IBC HC Series User manual

IBC VFC 15-150 User manual

IBC

IBC VFC 15-150 User manual

IBC VFC 15-150 User manual

IBC

IBC VFC 15-150 User manual

IBC SFC-99 User manual

IBC

IBC SFC-99 User manual

Popular Boiler manuals by other brands

NTI GF150 installation manual

NTI

NTI GF150 installation manual

RED COMPACT 14 installation guide

RED

RED COMPACT 14 installation guide

eta HACK 20 Operation

eta

eta HACK 20 Operation

Maktek 25 MKP OPERATING AND USING MANUAL

Maktek

Maktek 25 MKP OPERATING AND USING MANUAL

O Potterson LYNX Installation and servicing instructions

O Potterson

O Potterson LYNX Installation and servicing instructions

Highland heat Bio Kompakt user manual

Highland heat

Highland heat Bio Kompakt user manual

Ideal Boilers HE15 user guide

Ideal Boilers

Ideal Boilers HE15 user guide

Atag A325EC user manual

Atag

Atag A325EC user manual

Baxi LUNA HT 1.450 Installation and servicing instructions

Baxi

Baxi LUNA HT 1.450 Installation and servicing instructions

ATTACK FD20 Instructions for use

ATTACK

ATTACK FD20 Instructions for use

Rendamax R3456 EVO manual

Rendamax

Rendamax R3456 EVO manual

Bosch Condens 7000 WP Installation and maintenance instructions

Bosch

Bosch Condens 7000 WP Installation and maintenance instructions

Wolf ComfortLine CHK Installation and maintenance instructions

Wolf

Wolf ComfortLine CHK Installation and maintenance instructions

Express AS18 User instructions

Express

Express AS18 User instructions

Knight 51 Service manual

Knight

Knight 51 Service manual

Vaillant GA100CS SERIES Installation and service manual

Vaillant

Vaillant GA100CS SERIES Installation and service manual

Vaillant ecoTEC exclusive 835 Installation and maintenance instructions

Vaillant

Vaillant ecoTEC exclusive 835 Installation and maintenance instructions

KSM-Stoker KSM-Multistoker 240 XL instructions

KSM-Stoker

KSM-Stoker KSM-Multistoker 240 XL instructions

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.