
18
IE
GENERAL WARNINGS.
All Immergas products are protected with suitable transport
packaging.
e material must be stored in a dry place protected from the
weather.
This instruction manual provides technical information for
installing the Immergas kit. As for the other issues related to kit
installation (e.g. safety at the workplace, environmental protection,
accident prevention), it is necessary to comply with the provisions
specied in the regulations in force and with the principles of good
practice.
Improper installation or assembly of the Immergas appliance and/
or components, accessories, kits and devices can cause unexpected
problems for people, animals and objects. Read the instructions
provided with the product carefully to ensure proper installation.
Installation and maintenance must be performed in compliance
with the regulations in force, according to the manufacturer's
instructions and by professionally qualied sta, meaning sta
with specic technical skills in the plant sector, as envisioned by
the law.
GENERALITIES.
An independent mixed zone is added using this kit (second zone)
for coupling the Magis Combo Plus V2 Indoor Unit inside the
Solar Container Combo or for coupling the Magis Pro V2 or
Magis Combo Plus V2 Indoor Unit inside the Container Super
Trio. Before performing any intervention, disconnect the power
supply to the installed indoor unit by acting on the switch placed
upstream from the appliance.
INSTALLATION IN SOLAR CONTAINER COMBO
FIG. 1 2.
To install proceed as follows:
- open the door of the Solar Container Combo and lock it to
prevent it from getting in the way during the subsequent in-
stallation stages;
- empty the system by acting on the drain tting (1) on the hy-
draulic manifold (2) (as indicated in the instruction booklet
of the Magis Combo Plus V2 Indoor Unit). Before draining,
ensure that the system lling cock is closed;
- remove the two caps (Part. 3 and 4 Fig. 1) on the hydraulic
manifold (2).
Connect the components of the second zone as described below
(Fig. 5):
- remove the expansion vessel;
- assemble the circulator mount tting (25) on the lower metal-
sheet plate, xing it with the lock nut (5) and interposing the
gasket (6) between the latter and the metal-sheet plate;
- assemble the circulator (24) on the tting, interposing the
gasket (22);
- assemble the mixing valve (16) on the manifold, interposing
the gasket (11);
Attention: respect the orientation of the mixing valve, as
represented in detail in Fig. 5.
- Apply the IP cover (14) to the three-way motor (15) and as-
semble on the mixing valve, then connect it electrically;
- pre-mount the safety thermostat (9) with the 2 screws (10) and
the ow probe (18) on the second zone ow pipe (20);
- connect the mixing valve to the circulator with the second zone
system ow pipe (20), taking care to interpose the gaskets (Det.
22 and 11);
- assemble the system return pipe (12) on the lower metal-sheet
plate, xing it with the lock nut (5) and interposing the gasket
(6) between the latter and the metal-sheet plate;
- connect the system return pipe (12) to the mixing valve, in-
terposing the gasket (11) and to the manifold, interposing the
gasket (13);
- assemble the thermometer (7) on the relative bracket by
connecting the capillary to the system ow pipe (20) and xing
it with the clip (19);
- apply the insulation (21) on the system ow pipe;
- apply the le shell (8) and the right shell (23) on the circulator,
locking them with the 2 clamps in the kit;
- apply the relative insulation (17) to the mixing valve, locking
it with the 2 clamps in the kit.
Connection unit (on request).
The system is dispatched from the factory without the
connection unit. e kit includes the pipes and ttings for
connecting the pack. It is also possible to select the connection
choosing between the kit with bottom, rear or side connection.