
LOAD LIMITER
USER MANUAL
2-1
2. LS2 LOAD LIMITER OPERATING
The load limiter, by design, is intrinsically safe, that is, in case of failure or disconnection of the strain gauge
wire, it will stop all working operations. The limiter circuit have 2 relays able to cut a current of 16 A at
230Vac. These relays can be programmed, one of them works like a maximum load relay with 2 tripping-out
points: one instantaneously and the other delayed, that allows to adjust the instantaneous trip at 110% of
load and the delayed at 100% of load, the other relay works like a minimum load relay. Another way of
programming allows that both relays works as maximum load relays, with a programmable timer.
Hereinafter we will refer to the delayed time operation as mode TWO, and the maximum and minimum
mode as ONE. These two ways of programming are automatically selected depending on the connection or
disconnection values put on the relay TWO.
2.1. OPERATING IN MODE ONE
Operating in mode ONE allows to adjust the relay 1 as maximum load relay (with 2 tripping-points, one
instantaneously and other delayed), and the relay nº 2 as minimum load relay (snack cable detection).
When the load applied to the hoist exceeds one of the two programmed values, instantaneously or delayed,
the maximum load relay (point of disconnection of relay 1) will be deactivated immediately impeding the
lifting operation. This relay will be automatically reactivated when the load value falls below a previously set
value, this point will be called connection point of relay 1.
If the system has disconnected for exceeding the maximum instantaneous load, it connects when the load
falls below the disconnection value. If it has tripped for the delayed load value, it will be connected when it
falls below its respective value.
Normally, the value of time delayed disconnection relay 1 will be scheduled lower than programmed in
disconnection instant value. This operating allows you to prevent oscillations of the load produced by inertia
at the time of start lifting a mass whose value is close to the maximum load the limiter shoot.
The design of the timer of relay 1, allows that in case of a load swings above and below of the relay
disconnection point, it will not turn off until the applied load does not exceed the programmed value in relay
1, a time higher than the programmed in the timer.
NOTE: THE VALUE PROGRAMMED IN CONNECTION POINT MUST ALWAYS BE LOWER THAN
THE ONE PROGRAMMED IN THE DISCONNECTION POINT.