  9. Kidde Fire Systems ARIES NETLink 76-800300-007 User manual

Kidde Fire Systems ARIES NETLink 76-800300-007 User manual

Effective Date: July 2013
These instructions do not purport to cover all the details or variations in
the equipment described, nor do they provide for every possible contin-
gency to be met in connection with installation, operation, and mainte-
nance. All specifications are subject to change without notice. Should
further information be desired, or should particular questions arise which
are not covered sufficiently for the purchaser’s purposes, the matter
should be referred to KIDDE-FENWAL, INC., Ashland, MA 01721.
06-237073-020 Rev AB ©2013 Kidde-Fenwal, Inc.
BACnet is a registered trademark of ASHRAE.
Kidde is a registered trademark of Kidde-Fenwal, Inc.
ARIES NETLink is a trademark of Kidde-Fenwal, Inc.
INSTALLATION
ARIES NETLink™
BACnet®Interface Module
Installation Instructions
Add-On Module
Figure 2. BACnet Interface Module, P/N 76-800300-007, with Optional Add-On Module, P/N 76-800300-017
Figure 1. BACnet Interface Module, P/N 76-800300-007
WIRING DIAGRAM
Figure 4. Wiring Diagram for standard Single Module
(Ethernet cable)
Control Unit
TX RX SG FG
PMU
-
+
-
+
AUX2
AUX1
J8
(RS232A)
MCB
J3
(RS232B)
6
5
4
3
2
1
6
5
4
3
2
1
Ethernet
-
+
G
Notes:
1. Choose either to connect to BACnet/IP network or BACnet MS/TP network.
2. Maximum length of RS232 cable is 50 ft. (15.2 m)
3. Either AUX1 or AUX2 outputs may be used for power.
4. Either RS232A (J8) or RS232B (J3) ports may be used.
5. Corresponding RS232A or RS232B port must be selected and enabled via
control unit software to allow communication.
6. Installer-supplied RS232 cable must be modified by removing the plug at
one end and stripping wire at that end (module end).
7. If applicable, installer-supplied RS485 cable must also be modified by
removing the plug at one end and stripping wire at that end (module end).
8. Wire stripping should be ¼-in. from end (as shown).
To BACnet/IP Network
BACnet Interface Module
Enclosure
To BACnet MS/TP Network
PWR
-
PWR
+
Ethernet cable
RS485 cable
power (black)
(hardwire module end)
Earth Ground Stud
RS232 cable
Earth Ground
stud
Power
Terminal
Block
power (red)
¼ in. (6.4 mm)
Wire Stripping
+ -
(hardwire module end)
400 Main Street
Ashland, MA 01721
Ph: 508.881.2000
Fax: 508.881.8920
www.kiddefiresystems.com
DESCRIPTION
The BACnet®Interface Module is an external, high-per-
formance Building Automation multi-protocol gateway
that has been pre-programmed for the ARIES NETLink
control unit to support both BACnet MS/TP and BAC-
net/IP protocols. Configurations are stored within the
BACnet Interface Module itself; it is not necessary to
download any additional configuration files.
The BACnet Interface Module is provided as a single
module mounted inside the same sized enclosure as
the Remote Display/Control Module (RDCM). The
single module supports systems with up to 4 Signaling
Line Circuits (SLCs). For systems including more than
4 SLCs, a second (Add-On) module is required.
The enclosure includes conduit knockouts for Ethernet
or RS485 output cables and connections from the
ARIES NETLink to the module(s) for both 24VDC
power and RS232 data lines. The single module config-
uration is shipped from the factory already mounted on
standoffs inside the enclosure with internal wiring
installed. The addition of a second BACnet Interface
Module requires mounting, wiring and setting a dip
switch on the add-on module to the “ON” position.
Installation is accomplished by:
1. Mounting the enclosure
2. Connecting power from control unit to module
3. Verifying grounding to Earth Ground stud
4. Connecting RS232 communications from control
unit to module
5. Connecting module to either a BACnet/IP or BAC-
net MS/TP network
6. Installing an add-on module, if desired
7. Connecting power, grounding and RS232 cables
to add-on module (if included) and setting Switch
S0 to the “ON” position
8. Connecting add-on module (if included) to either
a BACnet/IP or BACnet MS/TP network
9. After hardware installation, refer to the ARIES
NETLink BACnet Interface Module User Guide,
P/N 06-237214-002, for instructions on how to run
the third-party configuration software (PC or web-
based) to set the address for each BACnet Inter-
face Module and to configure DIP switches.
SUPPLIED PARTS
• BACnet Interface Module, installed in enclosure
Note: Mounting screws, external power wires, RS232,
Ethernet and RS485 cables are NOT supplied with
BACnet Interface Module(s).
REQUIRED TOOLS
• Wrist ground strap
• Phillips screwdriver
PROCEDURE
To install the BACnet Interface Module:
1. Mark and pre-drill holes for four mounting bolts using
the dimensions shown. Two keyhole slots (at the top)
and two holes (at the bottom) serve as a template for
surface mounting. Refer to Figure 3.
2. Insert the upper two fasteners into the wall. Leave
approximately 1/4-inch of the screws protruding.
3. Slip upper keyholes of the enclosure over the protrud-
ing screws. Tighten the screws.
4. Insert and tighten the two lower screws.
5. For semi-flush mounting, install optional Remote
Enclosure Trim Ring, P/N 76-800300-004.
WARNING
Two different sources of power can be con-
nected to the control unit. Disconnect both
sources of power and critical components such
as control heads for special extinguishing sys-
tems and addressable pilot relays controlling
facility-power shutoff before beginning this
procedure. The control unit and associated
equipment may be damaged by connecting
wiring while the control unit is energized.
6. With the enclosure secured to the wall and power
removed from the control unit, field wiring can be
connected through the conduit knock-outs. Refer
to the provided wiring diagrams.
• Connect power lines from either AUX1 or AUX2
outputs located on the ARIES NETLink PMU
Board to the enclosure power terminals as
shown.
• Connect an RS232 cable to either RS232A (J8)
or RS232B (J3) on the ARIES NETLink Main
Controller Board. Remove the plug on the other
end and strip the cable about 1/4-inch from the
end. Connect to BACnet Interface module
terminals as shown.
• Verify that grounding wire (green) is secured to
Earth Ground stud inside enclosure.
• If connecting to a BACnet/IP network, insert an
Ethernet cable to the module as shown.
• If connecting to a BACnet MS/TP network,
connect wiring to terminals as shown and set “B
Bank” DIP switches to match network baud rate.
To install the Add-On Module: Position the Add-On
Module directly below the module in place. Fasten the
top and bottom mounting screws on standoffs. Secure
in place. Make all power, RS232, Ethernet and/or
RS485 field wiring connections as shown in the wiring
diagram (Figure 5). Install red and black power input
wires provided. Connect Earth Ground wire the same
as original module. Locate the “S Bank” Dip Switches
on the Add-On Module. Move Switch S0 to the “ON”
position. Connect Add-On Module to BACnet/IP
(Ethernet) or BACnet MS/TP network (RS485).
Operating Voltage 9-30VDC or 12-24VAC
Operating Current 150 mA @ 12VDC
Operating Temperature -40F to 187F (-40C to 85C)
Data Port RS232, Ethernet
Max. RS232 Cable
Length
50 ft. (15.2 m)
Supported Baud Rate
for BACnet MS/TP
9.6 - 76.8K baud
Humidity 5 - 90% RH, non-condensing
Enclosure Color Red
Weight 5 lbs.
INSTALLATION INSTRUCTIONS
PRODUCT INFORMATION
SPECIFICATIONS
Figure 3. Mounting of Enclosure
7- in.
(190.5 mm)
½
13 in.
(330 mm)
WIRING DIAGRAM
Figure 5. Wiring Diagram for Enclosure with Two Modules

This manual suits for next models

1

Other Kidde Fire Systems Control Unit manuals

Kidde Fire Systems PEGAsys LV User manual

Kidde Fire Systems

Kidde Fire Systems PEGAsys LV User manual

Kidde Fire Systems ARIES NETLink User manual

Kidde Fire Systems

Kidde Fire Systems ARIES NETLink User manual

Popular Control Unit manuals by other brands

IKEA tradfri manual

IKEA

IKEA tradfri manual

Supermicro SuperBlade SBI-4129P-T3N user manual

Supermicro

Supermicro SuperBlade SBI-4129P-T3N user manual

Hi-Link HLK-B20 user manual

Hi-Link

Hi-Link HLK-B20 user manual

GOK Caramatic ProTwo Assembly and operating manual

GOK

GOK Caramatic ProTwo Assembly and operating manual

Emerson Fisher FIELDVUE DVC6200 SIS Mounting instructions

Emerson

Emerson Fisher FIELDVUE DVC6200 SIS Mounting instructions

Emerson Fisher HP instruction manual

Emerson

Emerson Fisher HP instruction manual

Argo-Hytos SD1EX-A2 operating instructions

Argo-Hytos

Argo-Hytos SD1EX-A2 operating instructions

Siemens SM 338 Reference manual

Siemens

Siemens SM 338 Reference manual

Union Switch & Signal GENISYS II Hardware installation

Union Switch & Signal

Union Switch & Signal GENISYS II Hardware installation

Infineon AIROC IFW56810 Getting started

Infineon

Infineon AIROC IFW56810 Getting started

AEB MP6C installation manual

AEB

AEB MP6C installation manual

steute SRM 21 Multi Mounting and wiring instructions

steute

steute SRM 21 Multi Mounting and wiring instructions

rada 566 Installation and Maintenance

rada

rada 566 Installation and Maintenance

Lenovo Cisco Catalyst 3012 Product guide

Lenovo

Lenovo Cisco Catalyst 3012 Product guide

Kunbus PR100023R03 user manual

Kunbus

Kunbus PR100023R03 user manual

Leviton LV200 user guide

Leviton

Leviton LV200 user guide

ALM O/A/x2 Operation manual

ALM

ALM O/A/x2 Operation manual

Digital Equipment DECrepeater 900GM Installation and configuration

Digital Equipment

Digital Equipment DECrepeater 900GM Installation and configuration

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.