
8
Basic Operation
Section 1: Raising and Positioning
1. Roll the unit into position and lock all 4 casters on the unit wheelbase.
2. From inside the unit, facing one of the short ends, grasp the handles located on the two poles, lifting
and twisting the handles into the vertical channel.
3. Raise the handles approximately 6” and twist handles into a support channel until they drop into the
locking slots. Move to the other short end and repeat. Continue raising the unit, one end at a time, until
the desired height is reached. Make sure that all poles are locked into the support channel at the same
level.
If the unit is being raised by two people, both people should twist the handles into the vertical channel
and raise the handles until the unit is at the desired height simultaneously. Twist the handles into the
support channels until they drop into the locking slots. Make sure that all poles are locked into the
support channel at the same level.
Section 2: Lowering the Unit
1. From inside the unit, facing one of the short ends, grasp the handles located on the two poles, lifting
and twisting the handles into the vertical channel.
2. Lower the handles approximately 6” and twist handles into a support channel until they drop into the
locking slots. Move to the other short end and repeat. Continue lowering the unit, one end at a time,
until the desired height is reached. Make sure that all poles are locked into the support channel at the
same level.
If the unit is being lowered by two people, both people should twist the handles into the vertical
channel and lower the handles until the unit is at the desired height simultaneously. Twist the handles
into the support channels until they drop into the locking slots. Make sure that all poles are locked into
the support channel at the same level.
Section 3: Collapsing the Unit (on unit wheelbase)
1. Disconnect the Velcro “anti-sag restraints” located halfway up the enclosure and wrapped around each
pole.
2. From inside the unit, facing one of the short ends, grasp the handles located on the two poles, lifting
and twisting the handles into the vertical channel.
3. Lower the handles approximately 6” and twist handles into a support channel until they drop into the
locking slots. Move to the other short end and repeat. Continue lowering the unit, one end at a time,
until the handles are locked into the lowest support channel.
If the unit is being lowered by two people, both people should twist the handles into the vertical
channel and lower the handles until they reach the lowest support channel. Twist the handles into the
support channels until they drop into the locking slots.