MADRAX MADLOCKER ™ Assembly Instructions MADRAX DIVISION
ML1-1 and ML2-2 GRABER MANUFACTURING, INC.
WWW.MADRAX.COM, EMAIL: SALES@MADRAX.COM
3/30/18 Page 4 of 7
STEP 9
If this is a bank of lockers please see Locker Connection Instructions before installing the ROOF
PANEL.
There is a hole on the lock side, nearest to the door, where the SIDE and the ROOF PANEL should
be screwed together. Install the accessory hook(s) and jamb nut into this hole by inserting the
hook and tightening the nut.
Install the ROOF PANEL with 1/4”-20 x 1/2" Button Head Socket Cap Screws.
Verify proper SIDE, DOOR JAM ASSEMBLY, ROOF PANEL and BACK PANEL alignment at corners
and edges. Tighten all fasteners installed to this point.
STEP 10
Install the DOOR PANEL(S) with 1/4”-20 x 1/2" Button Head
Socket Cap Screws and tighten these fasteners.
STEP 11
Level the locker by adjusting the bottom nut on the LEVELING FEET and
securing by tightening the inside nut.
Verify that the spacing around the DOOR PANEL(S) is nearly equal on all
sides, the DOOR PANEL(S) swing freely, and the lock(s) and lock bar(s)
engage properly and securely. If there is binding in the door closure,
loosen all door hinge fasteners, straighten hinge(s) and re-tighten.
Use Spike Anchors to attach the locker to the concrete surface through the holes provided in
the threshold.