Master FWT40 User manual

Henan Master Machinery Co., Ltd
Tel:(+86)17737606271 www.mastermachinerys.com
1
OPERATION MANUAL
FWT40 Edge Power Trowel l
P E R F O R M A N C E · E F F I C I E N T · R E L I A B L E
Master sincerely thanks you for selecting the Plate
Compactor Machine. For your Safety and proper operation,
before you start to operate or carry out any maintenance on
this equipment, YOU MUST READ and STUDY this manual
carefully. Be sure to always keep it ready for reference.
Produced By Henan Master Machinery Co.,Ltd
Dear Customer,
Thanks for choosing Master machine.
To ensure the safety and proper use of the machine,
please read the instruction book carefully before use.

Henan Master Machinery Co., Ltd
Tel:(+86)17737606271 www.mastermachinerys.com
2
Also, please fill this card and save it for warranty use.
Buyer Name
Purchase
Time
Tel
Contact
Person
Address
Product
Name
Power Trowel
MODEL
FWT24
Motor Model
Note
CONTENTS
Contents …………………………………………………………1
Quality assurance/machine break-in …………………………2
Edger Power Trowel warranty ………………….…………………2
Maintenance record …………………………………………3
Routine service intervals ………..………………………………6
Forward …………………………………………………………7
Safety precautions ………………………………………………7
Assembly instructions ……………………………………………8
Operation (Floating) ……………….………………………………9
Operation (Finishing) ………….………………………………9
Starting procedure …………….………………………………10
Stopping procedure ……………….……………………………10
Maintenance ……………………………………………………11
Belt tension ………………..…………………………………11

Henan Master Machinery Co., Ltd
Tel:(+86)17737606271 www.mastermachinerys.com
3
Transporting ………………..…………………………………11
Lubrication …………………..…………………………………11
Storage …………………..……………………………………12
Troubleshooting ………..……………………………………13
Specifications …………..……………………………………15
Diagram …………………..…………………………………18
QUALITY ASSURANCE/MACHINE BREAK IN
The Edger Power Trowel is the product of extensive engineering development
designed to give long life and unmatched performance. The Edger Power Trowels
are shipped fully assembled, and only require filling with fuel and a brief check of
lubricant levels in preparation for operation.
You can help ensure that your Power Trowel will perform at top levels by
observing a simple routing on first use. Consider that your new Power Trowel is
like a new car. Just as you would break in a new a car to the road or any new
machine to the job, you should start gradually and build up to full use. Learn what
your machine can do and how it will respond. Refer to the engine manufacturer's
manual for run-in times. Full throttle and control may be used after this time
period, as allowed by material. This will serve to further break in the machine on
your specific application, as well as provide you with additional practice using the
machine.
We thank you for the confidence you have placed in us by purchasing an Edger
Power Trowel and wish you many years of satisfied use.
EDGER POWER TROWEL WARRANTY
The Engineering agrees to furnish without charge, F.O.B. our plant, a replacement
for any part or portion thereof, comprising the main unit of the Edger Power
Trowel, consisting of the drive shaft assembly and the gear case assemblies, save
and except drive belts, and power units, and/or bearing or electrical controls which
prove upon our examination, to be defective in either material or workmanship

Henan Master Machinery Co., Ltd
Tel:(+86)17737606271 www.mastermachinerys.com
4
within a period of twelve (12) months from date of purchase, provided that notice
of such defective part or portion thereof is given to the Engineering within the
twelve month warranty period. No further or other guarantee or warranty
expressed or implied in connection with the sale of the Edger Power Trowel is
given and our sole liability consists in replacing defective parts or portions thereof.
We shall not be responsible for any special, indirect or consequential damages
arising in any manner whatsoever.
This guarantee is for the sole benefit of the original purchaser as end user. Our
responsibility under this guarantee ends in the case the original purchaser transfers
ownership of the Edger Power Trowel, makes any changes or adds any parts or
devices not of our manufacture to the Edger Power Trowel.
MAINTENANCE RECORD
PREVENTATIVE MAINTENANCE AND ROUTINE SERVICE PLAN
This Edger Power Trowel has been assembled with care and will provide years of
service. Preventative maintenance and routine service are essential to the long life
of your Power Trowel. Your dealer is interested in your new machine and has the
desire to help you get the most value from it. After reading through this manual
thoroughly, you will find that you can do some of the regular maintenance
yourself. However, when in need of parts or major service, be sure to see your
Morrison dealer. For your convenience we have provided this space to record
relevant data about your Edger Power Trowel. When in need of parts or service be
prepared to provide your Trowel serial number. Locate the serial number now and
record in the space below.
Date
Purchased:
Type of
Machine:
Dealer Name:
Model:

Henan Master Machinery Co., Ltd
Tel:(+86)17737606271 www.mastermachinerys.com
5
Dealer Phone:
Serial Number:
REPLACEMENT PARTS USED
MAINTENANCE LOG
PART
NO.
QUANTI
TY
COST
DATE
DATE
OPERATION
Routine Service
Intervals
Eac
h
use
After
1.5
months
or
50hrs
Each 3
months
or
100hrs
Each 6
months
or
200hrs
Each 9
months
or
300hrs
Each 12
months
or
400hrs
General Inspection:
Guards
Check
○
○
○
○
○
Warning
stickers
Check
○
○
○
○
○
Test run
Check
operation
○
○
○
○
○
Controls:
Dead-ma
n switch
operation
Check
○
○
○
○
○
○
Pitch
control
assembly
Check
○
○
○
○
○
○
Lubricate
○
○
○
○
○
Engine:
Engine
oil
Check
level
○
○
○
○
○
○

Henan Master Machinery Co., Ltd
Tel:(+86)17737606271 www.mastermachinerys.com
6
Change
○
○
○
Engine
oil filter
Replace
○
○
Oil
cooler
Clean
○
○
○
○
Cooling
Fins
Clean
○
○
○
○
○
Air
cleaner
Check-cle
an
○
○
○
○
○
○
Replace
○
Air
Intake
Line
Check
○
Replace
2 yrs
Fan Belt
Check
tightness
○
○
Replace
500 hrs
Valve
clearance
Check-adj
ust
○
○
Fuel
filter
Check &
Clean
○
○
○
○
Replace
○
○
Fuel
Tank
Clean
500hrs
Engine
wiring
Check
○
Drive Train:
Clutch/P
ulley
Check
○
○
○
○
○
○

Henan Master Machinery Co., Ltd
Tel:(+86)17737606271 www.mastermachinerys.com
7
operation
Spider
plate
assembly
Check
○
○
○
○
○
○
Lubricate
○
○
V-Belt
Check
○
○
○
○
○
○
Blades
Check
○
○
○
○
○
○
Gearbox:
Gearbox
oil
Check
level
○
Replace
○
○
Gearbox
breathers
Check
operation
○
○
○
○
Routine Service Intervals
Due to the nature and environment of use, Edger Power Trowels could
be exposed to severe operating conditions. Some general maintenance
guidelines will extend the useful life of your trowel.
The initial service for your trowel should be performed after 25 hours of
use, at which time
your mechanic (or authorized repair shop) should complete all of the
recommended checks in the schedule above. The chart on page 6 (six) is
handy for keeping a record of the maintenance performed and the parts used
for servicing your trowel.
Regular service according to the schedule above will prolong the life of the
Edger Power Trowel and prevent expensive repairs.
Keeping your Edger Power Trowel clean and free from debris is the single

Henan Master Machinery Co., Ltd
Tel:(+86)17737606271 www.mastermachinerys.com
8
most important regular maintenance operation, over and above the checks in
the service schedule above, that can be performed. After each use your Edger
Power Trowel should be cleaned to remove any dust and debris from the
undercarriage and surrounding components. Use of a power washer will
make clean up quick and easy, especially if a non-stick coating was applied
prior to use.
In the Service Schedule above, items that should be checked, replaced or
adjusted are indicated by "○" in the appropriate column. Not all Edger Power
Trowel models include the same features and options and as such not all
service operations may have to be performed. For ease of recording place a
checkmark (√) through the "○" when the item is complete. If an item is not
required or not complete place an "×" through the "○" in the box.
All Edger Power Trowel have governed engine speed of 3600 rpm. See
engine manufacturer's manual for exact specifications. Care should be used
when making any adjustments to the Edger Power Trowel not to and lower
travel speed. It will create excessive "out-of-synch" vibrations resulting in
poor compaction,
maneuverability, excessive wear to the machine, and discomfort to the
operator.
Failure to have your Edger Power Trowel regularly serviced and properly
maintained in accordance with the manufacturer's instructions will lead to
premature and void the warranty.
FORWORD
The Bartell Edger Power Trowel, also known as a Mini-trowel/Edger, has been
developed to float and finish the edges of concrete floors, up to perimeter walls,
around columns and small areas, eliminating tiring hand troweling and increasing
overall productivity and quality.

Henan Master Machinery Co., Ltd
Tel:(+86)17737606271 www.mastermachinerys.com
9
SAFETY PRECATIONS
1. Always keep unauthorized, inexperienced, untrained people away from this
machine.
2. Rotating and moving parts will cause injury if contacted. Make sure guards are
in place. Keep hands and feet away from moving parts.
a. Fuel the machine only when the engine is stopped, using all necessary safety
precautions.
b. The engine must always be stopped before attempting any repair or
adjustments. Ignition switch should be off.
c. To avoid slipping and loss of control when starting the trowel, the operator
should maintain good footing. It is recommended that the operator wear safety
shoes for added protection.
Be careful when working around pipes or ducts protruding from the floor or
slab edges. If the trowel blades hit such obstacles, damage to the machine or
possible operator injury may result.
When starting the machine, do not exceed 1/3 throttle position. A higher
setting may cause the Centrifugal clutch to engage and the handle to rotate.
1. Be careful not to come in contact with the muffler when the engine is hot,
serious burns may result!
Over time, the blades will form a sharp edge. Be careful when handling the
old blades.
DANGER:Never operate the machine in an explosive atmosphere, near
combustible materials or where ventilation does not clear exhaust fumes. Repair
fuel leaks immediately. Refer to your engine owner's manual for more safety
instructions.
ASSEMBLY INSTRUCTIONS
Your new Bartell Edger Power Trowel has been shipped to you fully assembled.

Henan Master Machinery Co., Ltd
Tel:(+86)17737606271 www.mastermachinerys.com
10
All you need to do is unfold the handle and fasten the knob. Remove any shipping
or packing materials. Be sure to remove and discard the band securing the
safety/stop switch to the left handle. This serves only to facilitate shipping and is
not intended to be a permanent feature. When removing the machine from the
carton, be careful to use the handles to left the unit from the carton. NEWER LIFT
THE MACHINE BY THE RING OR DISC. Filling the fuel tank and a brief check
of lubricant levels in preparation for operation is required.
IMPORTANT: Before running machine with belt installed, ensure that engine
idles properly and that the safety-switch shuts off the engine.
ATTENTION: For any information regarding engine adjustments, please refer to
the engine manual supplied.
OPERATION (Floating)
When the slab has set sufficiently firm that the operator's footprint leaves a very
slight depression on the surface of the slab, it is ready for the floating operation.
Guiding the machine on the slab is very simple; a slight upward lift of the handle
causes the machine to travel to the left. Holding the handle in the neutral position,
will slowly cause the machine to spin in one spot. Slight downward pressure on
the handle cause the machine to the travel to the right. Best results are obtained by
covering approximately 4" on each turn. In other words, let the machine move
right or left, backwards or forwards, approximately 4" with each revolution of the
trowels. To fill a hole or cut down hump, move the unit back and forth over the
problem area.
Under normal operating conditions the machine should cover as much as 1000 sq.
ft. in about 15 minutes. It is recommended that a slight tension on the trowel
control cable, (but not a definite tilt), during the floating operation will cause the
machine to operate much smoother. After the floated slab has set sufficiently, it is
ready for the finishing operation.
CAUTION: Do not let the machine stand in one spot on the soft cement. Lift

Henan Master Machinery Co., Ltd
Tel:(+86)17737606271 www.mastermachinerys.com
11
from the slab when the floating operation is complete.
OPERATION (Finishing)
When starting the finishing operation, never set the trowels up over 1/4" pitch.
After the floating operation, the first thing to do is to remove the floating disc
from the blades. Clean the blades, spider plate and disc from cement paste
collected during the floating operation. Increase the blade pitch up to a maximum
of 1 cm for the first finishing operation and then continue to increase the pitch on
the following finishing operations. Continue the finishing passes until you obtain
the desired floor finish. The time required between each finishing pass is again
dependent on the weather conditions and water content of the concrete etc. If some
areas of the concrete set/harden too fast you may apply a small amount of water
using a hand brush as an aid to achieving the finish.
STARTING PROCEDURE: ☆WARM CLIMATE
Open fuel valve on gas tank. Set throttle lever to "Fast" idle position, set choke
to closed position, start engine. Open choke slightly to prevent flooding. Move to
"Open" or "Run" position when engine is warm, increase throttle to maximum
operation position (3600 rpm).
STARTING PROCEDURE: ☆COLD CLIMATE
Follow same procedure as above but allow longer warm-up period -3 to 5 minutes.
In cold weather, oil is much heavier to move and requires more time to work its
way into the moving parts. If maximum power is not attained, allow further
warm-up time.
STOPPING PROCEDURE
1. Throttle engine down.
2. Turn off stop switch.

Henan Master Machinery Co., Ltd
Tel:(+86)17737606271 www.mastermachinerys.com
12
MAINTENANCE
Maintaining your Edger Power Trowel will insure long life to the machine and its
components.
AIR CLEANER - Keep air filter clean at all times. Wash away dust and debris
using a non-oil based cleaning solvent. Let the filter dry before re-installing.
LUBRICATION - Always check engine oil regularly. Use proper engine oil as
recommended. See chart on this page. Fill crankcase to levels as recommended in
manufacture's engine manual.
SPARK PLUG - Check and clean spark plugs regularly. A fouled, dirty or
carboned spark plug causes hard starting and poor engine performance. Set spark
plug gap to recommended clearance. Refer to engine manual.
BELT TENSION - IMPORTANT!
When the engine is switched off, and the machine has stopped, the normal belt
play should be loose. This is due to the clutch type. When the machine is running
at full throttle, the clutch will close in, which tighten the belt causing the gearbox
to engage.
When adjusting the belt makes sure that the clutch is in alignment with the
follower pulley. Secure belt guard. Tighten all engine mount bolts, and tighten
lock nuts.
TRANSPORTING
When transporting the trowel, always keep the handle folded and the blades flat on
the floor to prevent damage to the pitch control system. Always keep the floating
disc underneath the blades to protect them against damage.
CAUTION: Never lift the trowel by the rotating ring; use the hoist hook or handle
provided on the trowel. Remove the float disc when lifting machine more than
100cm (40in). The floating disc could fall off.

Henan Master Machinery Co., Ltd
Tel:(+86)17737606271 www.mastermachinerys.com
13
LUBRICATION
1. ENGINE OIL
The long life and successful operation of any piece of machinery is dependent
on frequent and thorough lubrication. Before using the trowel, always check
your engine for oil. Use proper engine oil as recommended in the engine
manufacturer’s manual. Fill crankcase to levels as recommended.
2. SPIDER PLATE
The trowel arm on the spider plate does not require lubrication. If a trowel
arm becomes jammed, this is probably due to a bent arm, which will require
replacement. Appropriate "winterize" steps should be taken if the machine is
going to be stored for long periods of time.
3. GEARBOX
In operation the gearbox lubricant is in fluid state. When the machine is
stopped the lubricant returns to a gel state. It will only be necessary to inspect
the sealed components if the outside of the gearbox gets too oily or otherwise
shows evidence of a leak. If this happens, clean the machine thoroughly and
look for leaks. Effect necessary repairs immediately, Use SHELL TIVELA
COMPOUNDS 'A' (0.3L, 10.1oz.) gear oil or equivalent to top up the gear
box after any maintenance to the internal components.
ENGINE OIL SPECIFICATIONS
Season Temperature
Grade of engine oil
Spring to Autumn +40°F (4°C) to +120°F (49°C)
SAE 30
Winter +15°F (-9°C) to +40°F (4°C)
SAE 20
Below +15°F (-9°C)
SAE 10W-30
STORAGE
The following steps should be taken to prepare your Edger Power Trowel for

Henan Master Machinery Co., Ltd
Tel:(+86)17737606271 www.mastermachinerys.com
14
extended storage.
1. Close fuel shut off valve.
2. Siphon excess gasoline from tank.
3. Start engine until it stops from lack of fuel. This will use up all the fuel
in the carburetor and prevent formation of deposits due to evaporation of
fuel.
4. Remove spark plug and pour 2 oz. of SAE-30 or SAE-40 motor oil
into the cylinder. Slowly crank the engine 2 or 3 times to distribute the oil
throughout the cylinder. This will help prevent rust during storage. Replace
spark plug.
5. Store the unit in an upright position in a cool, dry, well ventilated area.
TROUBLESHOOTING
WON'T START
Throttle fully open
Hand lever wire broken
No gas
Dirty gas
No oil
Gas filter plugged
Gas line plugged
Hole in gas line
Gas supply valve turned off
Dead-man safety switch is off
Safety switch wire or connectors not making good contact
Other engine problems (Refer to engine manual)
STARTS BUT NO HIGH SPEED
Engine problems
Throttle cable broken or seized

Henan Master Machinery Co., Ltd
Tel:(+86)17737606271 www.mastermachinerys.com
15
Throttle lever and connectors loose or out of adjustment
Clutch shoes worn
STARTS AT HIGH SPEED, WON'T SLOW DOWN
Same as above
ENGINE WON'T STOP
Safety switch, wire or connectors not making good contact
Micro-switch burnt out
ENGINE STARTS BUT WON'T TURN TROWELS AT ANY SPEED
Clutch seized
No weights in clutch
Wrong belt
Broken or missing key
— Clutch seized
— Pulley
— Worm gear (countershaft)
— Main gear
— Spider plate
1. Gearbox seized
TROWELS TURN, ENGINE AT IDLE
2. Idle too fast
3. Belt too tight
4. Clutch seized
5. Pulley out of alignment
TROWELS BLADES WEARING UNEVENLY
6. Spider plate seized
7. Arms bent
8. Adjusting screws (carriage bolts) incorrectly set
9. Floating disc not evenly attached to the blades
MACHINE JUMPS ON FLOOR

Henan Master Machinery Co., Ltd
Tel:(+86)17737606271 www.mastermachinerys.com
16
10. Concrete hardened on bottom of spider plate
11. Trowels unevenly worn/bent
12. Spider plate seized
13. Spider plate loose
14. Trowel arms bent
15. Adjusting screws (carriage bolts) incorrectly set
16. Main shaft bent
PITCH CONTROLS WILL NOT OPERATE BLADES
17. Cable broken or out of adjustment
18. Pressure plate assembly contaminated with concrete debris
19. Slot screw missing (under-side of handle)
20. Spider plate seized
21. Pressure plate and/or yoke arm broken or badly worn
22. Hand crank adjuster malfunctioning
BELT WEARING RAPIDLY
23. Belt is too tight
24. Pulley out of alignment
25. Wrong belt/defective belt
26. Clutch sticking
27. Gearbox seizing
OIL LEAKS
a. Top of gearbox
Gearbox seal warn
Engine leaks
Too much oil in gearbox
b. At main shaft or countershaft
Shaft and/or seal worn
Retaining screw(s) loose
TROWEL BLADES WILL NOT TURN

Henan Master Machinery Co., Ltd
Tel:(+86)17737606271 www.mastermachinerys.com
17
Yoke arm broken
Key sheared
Gearbox malfunction
SPECIFICATIONS
Model
Path
Power
Source
(gas
option)
Float
Blade
Size
Finish
Blade
Size
Combination
Blade Size
Pans
Floats
Pans
Floats
Operating
Weight
B424
(Edging)
24"
(60
cm)
4 hp
Honda
OHV
4 hp
Robin
OHV
N/A
4.75"×9"
(12×23
cm)
N/A
24"
(60
cm)
138
lbs.63
kg
Up to 110
lbs.
(50 kg)
B430
(Edging)
30"
(76
cm)
5.5 hp
Honda
OHV
6 hp
Robin
OHV
10"×30"
(25×28
cm)
6"×10.5"
(15×26
cm)
6"×10"
(15×25 cm)
30"
(76
cm)
184
lbs.
84 ke
Up to 145
lbs.
(66 kg)
TECHNICAL INFORMATION
B424, B430 EDGER TROWEL
Overall Dimensions (W×H×L)
Shipping Dimensions
Shipping Weight
29 1/2"×58 1/2"×36" (750mm × 1490mm ×
910mm)
39"×40"×31" (1000mm ×1020mm × 790mm)
157 lbs (71 kg) ~B424

Henan Master Machinery Co., Ltd
Tel:(+86)17737606271 www.mastermachinerys.com
18
192 lbs (87 kg) ~B430
Blade Speed (RPM)
Engine Speed (RPM)
70 min —140 max
3600
Clutch Type
Variable Speed
Centrifugal
Yes
Gearbox Oil
Gearbox Oil Capacity
Engine Fuel
Engine Oil Alert
Cooling
Starting
Shell Tivela Compounds A or similar type
10.1 oz. (0.3 L.)
Gasoline — Unleaded
Yes
Air
Recoil Starter - Manual
Dead-man Safety Switch
Fuel Capacity (approximately)
Running Time (approximately)
Yes
0.66 Gal. (2.5 L)
2.5 -3 hours
Number of Blades
4
Average acoustic power (dB)
Average acoustic pressure (dB)
Acoustic pressure on operator (dB)
Vibration valve on the handle (aw)
103.2
88.8
89.1
7.0
Options
Hoist Hook
Folding Handle

Henan Master Machinery Co., Ltd
Tel:(+86)17737606271 www.mastermachinerys.com
19
DIAGRAM
1. Complete Edger Trowel:

Henan Master Machinery Co., Ltd
Tel:(+86)17737606271 www.mastermachinerys.com
20
Item
Part
Drawing No.
Description
Qty
1
101
GX160
1
2
102
FWT24-15
Washer
1
3
103
FWT24-16
Clutch
1
4
104
GB/T820-2000
Screw(M8x16)
2
5
105
FWT24-18
Belt Guard Plate
1
6
106
GB/T6182-2000
Locknut(M8)
4
7
107
GB/T95-1985
Washer(8)
4
8
108
GB/T70.3-2000
Screw(M8x16)
4
9
109
FWT24-11
Engine Mount plate
1
10
110
QJM760-06
Gearbox assembly
1
11
111
Belt Opti(A 24)
1
12
112
GB/T77-2000
Screw(M8x12)
2
13
113
FWT24-19
Pulley
1
14
114
GB/T95-1985
Washer(10)
1
15
115
GB/T5783-2000
Bolt(M10x10)
1
16
116
GB/T93-1987
Gasket(10)
1
17
117
FWT24-17
Belt Guard
1
18
118
GB/T95-1985
Washer(10)
1
19
119
GB/T5783-2000
Bolt(M10x10)
1
20
120
GB/T93-1987
Gasket(10)
1
21
121
GB/T901-1988
Hex Bolt(M10x30)
4
22
122
GB/T95-1985
Washer(10)
4
23
123
GB/T6182-2000
lock Nut(M10)
4
24
124
FWT24-10-01
Control-throttle assembly
1
25
125
FWT24-10-04
Handle Grip
2
26
126
GB/T93-1987
Gasket(5)
1
Other manuals for FWT40
1
This manual suits for next models
1
Table of contents
Other Master Trowel manuals