
Mass Systemswitch 16 kW (230V) –User and Installation Manual
4.11 REMOTE PANEL (OPTIONAL)
See figure 8. If a Mastervolt remote control panel is
applied, you can fix the wires of the 10x0.5 mm² cable
from the remote panel to the remote control connector (ref
9 in figure 11) See also section INSTALLATION of the
manual of the remote control panel. These signals are
galvanically isolated from the mains grid.
Note: for an easy installation you can pull the screw
connector from the holder on the printed circuit board.
Figure 11: Pin configuration of the 10-pole connector to
the remote control panel
4.12 MASTERBUS (OPTIONAL)
See figure 8. The Mass Systemswitch can be connected to
the MasterBus network by means of the two data ports
(figure 8, reference 11). See also section 5.3 for details.
Note: For remote operation of the Mass Systemswitch
you have to choose between either the MasterBus
network or a remote panel as described in section
4.11. You cannot use both.
4.13 COMMISSIONING AFTER INSTALLATION
Follow the steps described below to switch on the Mass
Systemswitch.
1. Tighten all cable glands to ensure the pull relief.
2. Check all wiring and connections.
3. Close the front cover plate of the connection
compartment.
Note: If the gland plate was removed during installation,
be sure to slide back the cover plate before you fix
screws D and E (see figure 7).
4. Switch on the AC power sources.
Now the Mass Systemswitch is ready for operation.
4.13.1 MasterBus (optional)
During first commissioning the Mass Systemswitch will be
recognized by the MasterBus network automatically. The
remote control panel of the MasterBus network will
indicate that a new device was found.
The factory settings of the Mass Systemswitch are optimal
for most installations. In some applications however, it is
desirable to change settings. See section 6.3 for an
overview of all available settings. Refer to the user manual
of the remote control panel to change these settings.
Note: Some settings can only be changed via the
MasterBus interface. If changes were made to the
factory settings, all LEDs will flash three times
during powering of the Mass Systemswitch, i.e.
when either generator or shore input comes
available or when the MasterBus is powered.
4.14 DECOMMISSIONING
If it is necessary to put the Mass Systemswitch out of
operation, follow the instructions in order of succession as
described below:
1. Switch off all loads.
2. Switch off the AC power sources. These power
sources should be secured against unexpected and
unintended switching on.
3. Open the connection compartment of the Mass
Systemswitch (see paragraph 4.5).
4. Check with a suitable voltage meter whether the
inputs and the outputs of the Mass Systemswitch are
voltage free.
5. Disconnect all wiring.
Now the Mass Systemswitch can be demounted in a safe
way.
4.15 STORAGE AND TRANSPORTATION
When not installed, store the Mass Systemswitch in the
original packing, in a dry and dust free environment.
Always use the original packing for transportation. Contact
your local Mastervolt Service Centre for further details if
you want to return the apparatus for repair.
4.16 RE-INSTALLATION
To reinstall the Mass Systemswitch, follow the instructions
as described in section 4.