Metalcraft 142-2-19 User manual

ssembly instruction
Model: 142-2-19 / 142-2-31
Please ready carefully before assembly

CONTENTS
1. Assembly Advice ................................................................Page 1
2. Product Features ................................................................Page 2
3. Parts List .............................................................................Page 3
6. Base Assembly ...................................................................Page 8
7. Framework & Glazing Assembly .......................................Page 9 - 22
5. Roof Vent Assembly ..........................................................Page 6 - 7
4. Door Assembly ...................................................................Page 4 - 5

11
Rubber is not provided if you choose polycarbonate sheet as glazing panel.
Important:
Assembly and Maintenance Advice
1. For safety purposes, we strongly recommend that this product is assembled by at least
two people.
2. Some components have sharp metal edges. Please be careful when handling metal
components. Please wear gloves, shoes and safety goggles during assembly.
3. Lay all of the components on a soft carpet or blanket to avoid any scratches or damages.
4. DO NOT climb or stand on the roof. Heavy articles should not be leaned against
the greenhouse.
5. Keep the roof and gutter clear of snow, dirt & leaves. Allowing snow to build up on
the roof may damage the product.
6. Unlike steel, if the paint finish is scratched this will not harm the aluminium underneath.
7. When your product needs cleaning, use a mild detergent solution and rinse with cold
clean water. Do not use acetone, abrasive cleaners or strong detergents to clean
the panels.
FreeTool
Tools Provided:
Tools Required when Assembly (Not Provided)
Assembly at least by two Persons

2
1. Base anchor brackets are included as standard with expanding bolts to ensure a secure
fixing into concrete or paving. Alternatively, you can use the brackets to fix into a
timber base with wood screws (not provided).
Expansion bolt
in concrete
Steel bar/Lawn land
Functions and Features:
2. The strong two part eaves beam includes an integral gutter. Downpipes are also included
as standard so you can collect rainwater.
Automatic Opener
GM80001
Manual Opener
3. Manual window handles are included as standard with the roof vents. If required,
automatic roof vent openers are available as an inexpensive optional extra.
GM80001 is sold separately
4. Remove approximately 2 inches of film from all sheet edges before installing and remove
all film immediately after the construction is completed. Please ensure that the side
with the white film faces outwards.
5. This quality greenhouse features self-tapping screws to provide strong joints. As the name
suggests, the screws tap their own thread. Driving in self-tapping screws requires more force
than conventional screws. A powered screwdriver is therefore recommended.

L25 4
J07 4
J08 4
J01 2
2
2
J02R
J02L
44
Ø4X16D
Z02
J05 4
J03R
J03L
1
1
L23F 2
14
Ø4X10
Z03
L09C 2
W08 6
L02B
L03B 4
L06C 1
P RT NO QTY
L01C 2
W01 14
L01D 2
W02 4
L04B 1
L13 1
12
L04
P RT NO QTY
L03 4
L01 2
L01B 2
L08C 2
L10 1
L02 16
2
L23
L02C 1
L02D 1
L02E 1
L02F 1
L02G 1
L07C 2
9
L23D
3
L05 4
L05B 24
12
L19
6
L20
6
L21
6
W06
Part NO. QTY.
6
L11
6
L12
WindowsX6
1
L14
L23E 12
NO.
Part QTY.
3
L16B
2
L15
3
L18
2
L17
32
Ø4X25
Z01
1
L16
1
L18B
Door
20
M4.2X16
Z04
M01
M6
S01
M6X12 424
427
P RT NO QTY
S02
M6X20 3
2
W07
W011 4
12
22
6
6
6
2
Y1
1
2
1
1
1
Y2
Y3
Y4
Y5
Y6
Y7
Y8
Y9
Y10
Y11
Y13
16
16
GMDJ-101
GMDJ-102
GMDJ-103
4
4
4
D1 2
P RT NO QTY
D2 2
S01
M6X12 32
M01
M6 32
56
M4.2X16
Z04
D3 2
C2 2
L09D 4
L06D 2
L08D 5
L07D 4
4
L23C
PART NO QTY
J11
PART NO QTY
J11
Rubber for walls & roof
(Provided for glass only)
Rubber for walls only
(Provided for glass only)
Rubber
201.5M
117.1M
6 windows are standard.
If your order contains more
please go to page 7.

4
NO.
Part QTY.
1
L15
2
L18
1
L17
3
Y11
NO.
Part QTY.
16
Ø4X25
Z01
1
L16B
1
L16 L15
L16B
L16
L17
L18
Z01
Z01
Z01
L18
Z01
Z01
Z01
Y11
Y11
Y11
Left Door

5
NO.
Part QTY.
1
L15
1
L18
1
L17
3
Y11
NO.
Part QTY.
16
Ø4X25
Z01
2
L16B
L15
L16B
L16B
L17
L18B
Z01
Z01
Z01
L18
Z01
Z01
Z01
Y11
Y11
Y11
1
L18B
Right Door

Y10
Z02
Y10
Z02
Z03 Z03
Z02
W06
Z02
L19
Step 1
Step 2
Step 3
L19
2
L19
1
L20
1
L21
1
W06
Ø4X10
6
2
6
Part NO. QTY.
1
Y10
Part NO. QTY.
Ø4X16D
Z02
1
L11
1
L12
M4.2X16
Z03
Z04 2
Windows Assembly

7
L11
L12 Z04
L11
L12
Z02
L11A is factory fitted
to L12A already
Attention:
6 windows are standard. If your order contains more windows, the extra windows are packed
separately in the wooden boxes with the glass. Instruction manual is included in that carton box too.

DJ101
S01
DJ102
DJ103
a
b
ab
=
8
L06D
L07D
L08D
L05D
L05D
L06D
L07D
L08D
L05D
L05D
L06C
L07C
L08C
L05C
L05C
L06C
L07C
L08C
L05C
L05C
GMDJ-101
GMDJ-102
GMDJ-103
4
4
4
D1 2
P RT NO QTY
D2 2
S01
M6X12 32
M01
M6 32
B CK
FRONT
51150
50 511 511 511
100
511 511511 511 511 511
56
M4.2X16
Z04
511
D1
D1
D2
D2
...
C2
C2
D3
D3
D3 2
L06D
L07D
L08D
L05D
L05D
L06D
L07D
L08D
L05D
L05D
C2 2About 100mm distance
between two Z04
Fix the base before assembly
the greenhouse. This is the
way to fix the base.
142-2-19 / 142-2-31

9
Y4
Y1
Y11
Y11
Y2
Y5
Y9
Y6 Y6
Y10 Y7
Y6 Y6
Y7
Y9
Y10
Y9
Y9
12
22
6
6
6
2
Y1
1
2
1
1
1
P RT NO QTY
Y11
Y11
Y11
Y11
Y13
Y1
Y4
Y8
Y2
Y2 Y2 Y2 Y2
Y3
Y6
Y7
Y6
Y7
Y9
Y6
Y10
Y6
Y9
Y10
Y9
Y9
Y6
Y7
Y6
Y7
Y6
Y7
Y6
Y7
Y2
Y3
Y4
Y5
Y6
Y7
Y8
Y9
Y10
Y11
Y13
Y6
Y7
Y6
Y7
16
Y9
Y6
Y10
Y6
Y9
Y10
Y9
Y9
Y6
Y7
Y6
Y7
Y6
Y7
Y6
Y7
Y6
Y7
Y6
Y7
Attention:
If glass is chosen, please seal it with
rubber(J11) provided after the whole
assembly is finished.
Rubber is not provided if you choose
polycarbonate sheet as glazing panel.
142-2-19 / 142-2-31

M01
S01
S01
L01&B
L01
L01
L01B
L01B
10
P RT NO QTY
16
M01
M6
S01
M6X12 16
L03 4
L01 2
L01B 2
M01
S01
L03
Z04
56
M4.2X16
Z04
L08
L10
L08D 5
L10 1
L08D
L08D
L08C
L08D
L08D
L08C
L10
L08D
L03
L03
L03
L03
L08C 2
1. Fix the glazing bars (2 x L01A, 2 x L01B and 4 x L03A) to the cills (L10, L08C & L08D)
with S01 & M01 provided.
2. Fix the cills to the base with Z04, using a powered screwdriver. See Page No. 8 for details.

11
P RT NO QTY
24
M01
M6
S01
M6X12 24
L07C 2
2
L23C
S01
M01
L07D L07C&D
2
1
S01
M01
34
L23C&D
L23D
M01
S01S01
M01
L07D
L23D
1
1
1
1
2
2
2
2
3
3
3
3
4
4
4
4
L07C
L23C
L07D 4
4
L23D
1. Fix 2 x L07C & 4 x L07D eaves to L01A/L01B and L03A, using S01 & M01.
2. Fix 2 x L23C & 4 x L23D to L01A/L01B and L03A, using S01 & M01.

12
P RT NO QTY
1
234
1
L23D
L02C&D&E&F
S01
L02G
S01
S01
S01 S01
M01
M01 M01 S01
M01
S01
M01
L02C&D&E&F&G
L05
2
L23
L23D
L02C L02D
L02E
L02F L02G
L02C 1
L02D 1
L02E 1
L02F 1
L02G 1
19
M01
M6
S01
M6X12 20
L05 4
44
44
3
3
2
2
222
1
1
L23
L23
Fix L02C & L02D to cill L10; L02E, L02F
and L02G to cill L08D, using S01 & M01.
Slide 2 * S01
into L02G bolt
channel.
Fix bracings 4 x L05A, 2 x L23A and
1 x L23D as below, using S01 & M01

13
P RT NO QTY
Y2 6
80
M01
M6
S01
M6X12 96
L02
S01 S01
M01
L02
1
L07D
2
M01
S01
3
S01
M01
L02 16
1
2
3
Y2
Y2
Y2 Y2 Y2 Y2
Fix L02A (16pcs) to L08C/L08D
and L07C/L07D using S01
& M01.
L02A
Slide 2 bolts (S01) into each L02A bolt
channel. One is to fix L23D, the other is
to be used later for fixing L05B

14
P RT NO QTY
12
M01
M6
S01
M6X12 12
Y6 22
6
L04
L04
L04
L04 L04 L04
L04
123
L04
S01X2
L04
3
1
22
1
1
222
Y6
Y6
Y6
Y6
Y6
Y6
Y6
Y6
Y6
Y6
Y6
Y6
Y6
Y6
Y6
Y6
Y6
Y6
Y6
Y6
Y6
Y6
Fix bracings L04A (6pcs) as above, using S01 & M01.
Slide the glazing panel Y6
into positions

15
Y1
Y4
Y1
Y5 Y13
Y4 Y3
Y8
P RT NO QTY
9
M01
M6
S01
M6X12 10
L04B 1
L13 1
12
3
4
L02C L02D
12
L13
L13
L13
5
L04B
L02E L02F
34
S01X2
L04B
L04B
S01
M01
S01
M01
S01
M01
S01
M01
S01
M01
5
2
Y1
1
Y3
2
Y4
1
Y5
1
Y8
1
Y13
Fix L13A to L02C & L02D
with S01 & M01. Preload the bolts S01 & M01
to L02E & L02F before
Slide 2*S01 into
the channel of L04B
Slide the glazing panels Y1, Y3, Y4
Y5, Y8 and Y13 into positions.

16
P RT NO QTY
22
M01
M6
S01
M6X12 20
L01C 2
W01 2
M01
W02
W01
M01
1
1
22
22
3
3
44
44
L01D 2
L01C
L01C
L01D
L01D
W02 4
S01
M01
M01
S01
12
L01C&D L01C&D
34
M01
S01
L01C&D
5
1. Preload S01 & M01 on L01C and L01D before fixing
them to L01A/L01B. See figue 1 & 2.
2. Bolt L01C and L01D with plate W01, using S01 & M01
preloaded. And then fix them to L04B and L02G,using
S01 & M01.
3. Fix L01C & L01D to L02C & L02D/L02E & L02F with
the plate W02, using the S01 and M01 preloaded
above.
4. Fix L01C & L01D to L01A & L01B,using S01 & M01.

L03 &B
L23E
3
L23E 12
17
P RT NO QTY
44
M01
M6
S01
M6X12 44
L03B 4
W01 12
W01
W01
S01
M01
M01
S01
L07C&D
L07D
S01 M01
W01
L03B
W01
2
1
W01
W01
W01
L03B
L03B
L03B
1
1
33
3
33
Fix glazing bars L03B (4pcs)
to the eaves and the ridge
profiles using S01 & M01
Fix plates W01 (2pcs)
to L03A & L03B using
S01 & M01.
Fix plates W01 (2pcs)
to the two L03B using
S01 & M01.
Fix L23E(12pcs) to L03A
and L03B using S01 & M01.

18
P RT NO QTY
76
M01
M6
S01
M6X12 124
L02B 16
M01
S01
L02B
M01
S01
L02B
L02B
S01X3
M01
S01
S01
S01
M01
L06C 1
L06D
L06C&D
L06C&D
L07C&D
12
34
L02B
L06D
L06D
L06C
333
333
33
L02B
44
4
L02B
44
4
L02B
44
1
2
2
1
L06D 2
Bolt the ridge L06C (1pc) &
and L03B, using S01 & M01.
L06D (2pcs) to L01C, L01D
Fix glazing bars L02B (16pcs)
to the eaves and the ridge
profiles with S01 & M01
Slide 3 bolts (S01)
into each L02B bolt channel
to be used later.
This manual suits for next models
1
Table of contents
Other Metalcraft Greenhouse Kit manuals